§ 64.0506 — Industrial Wastewater Sampling and Measurements
San Diego Municipal Code (City Clerk PDFs, pages revised through October 2026) · San Diego Municipal Code § 64.0506
Corpus is an independent public-information project, not the official City of San Diego website. Stable reference: corpuslaw.us/code/ce2f0b14-50aa-4ee5-b971-a6ba4931131f
§64.0506 Industrial Wastewater Sampling and Measurements
(a) The City Manager shall establish the type and frequency of sampling required of each Industrial User necessary to ensure compliance with applicable Pretreatment Requirements. If an Industrial User performs sampling of a type or frequency exceeding the requirements of the City Manager, the results of such sampling shall be included in the reports required by section 64.0503 and 64.0504(a). The City Manager may require an Industrial User to install, operate, and maintain, at the Industrial User’s expense, automatic flow-proportional sampling equipment and automatic analysis and recording equipment if necessary to perform accurate sampling. (b) The reports required by sections 64.0503 and 64.0504(a) shall be based upon all data collected through appropriate sampling and analysis performed during the period covered by the report, and such data shall be representative of conditions occurring during the reporting period. Industrial Users shall comply with the procedures and requirements for sampling, analysis, and submittal in 40 C.F.R. 403.12(g)(3) through (6). (c) If sampling indicates a violation of the industrial user permit or discharge authorization, the permittee shall notify the City within 24 hours of becoming aware of the violation. The Industrial User shall also repeat the sampling and analysis and submit the results to the City Manager within 30 days after becoming aware of the violation unless re-sampling is not required pursuant to 40 C.F.R. 403.12(g)(2). (d) Every Industrial User shall install, operate, and maintain, at its own expense, one or more calibrated flumes, weirs, flow meters, or similar devices approved by the City Manager to measure wastewater flow rates and total volume, if such measurements are required by the industrial user permit or discharge authorization. In lieu of measurement, the City Manager may accept records of water usage if such records can be used to accurately determine wastewater flow rates and volume. If a measuring device cannot be installed on the Industrial User’s premises, the City Manager may require the Industrial User to install the device in the public right of way if it will not be obstructed by landscaping or vehicles. The Industrial User shall install measuring devices prior to Discharge, or by the date determined by the City Manager if measuring devices are being installed to measure existing Discharge. (e) Federal, state, and local regulatory agencies, the City, and their representatives may enter the premises of a person with an industrial user permit at any time wastewater is being disposed to inspect pretreatment processes, sampling, measuring devices, or to collect wastewater samples for analysis. (f) Persons with industrial user permits shall permit the City Manager to install and operate sampling and measuring devices on their premises as necessary to confirm that the permittee’s sampling and measuring devices are accurate.
(“Industrial Wastewater Sampling and Measurements” added 6-15-2026 by O-22104 N.S.; effective 7-15-2026. Former Section 64.0506 “Transfer of an Industrial Wastewater Discharge Permit or Changed Use” renumbered to Section 64.0508.)
Ask a question about San Diego law
Corpus searches the San Diego sections it holds and shows the ones that match, with their citations. Free, no sign-in.