OVERVIEW OF APPROVAL PROCESS.
Sioux Falls Code of Ordinances § 157.021
in effect§ 157.021 OVERVIEW OF APPROVAL PROCESS.
(a) Generally. Proposed subdivision development plans must be approved by the city in accordance with the following procedures which include four principal steps:
(1) Concept plan is not required, but advisory (submit for comments to prepare for next steps);
(2) Preliminary plan (in coordination with rezoning);
(3) Development engineering plans (in preparation for engineering construction plans); and
(4) Plat (before a building permit is approved or issued).
(b) Simultaneous review. It is the intent of these subdivision regulations that subdivision review be carried out simultaneously with the review of a zoning application.
(1992 Code, App. A, § 15A.02.020) (Ord. 81-08, passed 7-7-2008; Ord. 87-18, passed 10-2-2018)
Source: City of Sioux Falls, South Dakota, Code of Ordinances and City Charter (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/siouxfalls/latest/siouxfalls_sd/0-0-0-63923Fetched: 11/8/2026
