Sec. 12-368. - Powers.
(a) The stormwater management board shall have the following powers:
(1) Hear and decide appeals where it is alleged there is error in any order, requirement, decision or determination made by the city engineer in the enforcement of this article or any regulation or technical guideline promulgated pursuant to this article or the manager of the natural resources and environmental management division as provided in section 21-358.
(2) Authorize upon appeal from a decision of the city engineer in specific cases such variance from the terms of this article, or any regulation or technical guideline promulgated pursuant to this article, as will not be contrary to the public interest, where owing to special conditions, a literal enforcement of the provisions of this article, or of any regulation or technical guideline promulgated pursuant to this article, will result in unnecessary hardship.
(b) In deciding appeals under subsection (a)(2) of this section, the stormwater management board shall consider all relevant factors, including but not limited to all technical evaluations, all standards specified in the regulations and technical guidelines promulgated pursuant to this article, and the following:
(1) The danger that materials may be swept onto other lands to the injury of others.
(2) The danger to life and property due to flooding or erosion damage.
(3) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner.
(4) The importance of the services provided by the proposed facility to the community.
(5) The necessity of the facility to a waterfront location, in the case of a functionally dependent facility.
(6) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use.
(7) The compatibility of the proposed use with existing and anticipated development.
(8) The safety of access to the property in times of flood for ordinary and emergency vehicles.
(9) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site.
(10) The cost of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, and streets and bridges.
(c) Upon consideration of the factors listed in this section, and the objectives of this article, the stormwater management board may attach such conditions to the granting of a variance as it deems necessary to further such objectives.
(Ord. No. 98-5, § 6, 2-12-1998)