For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37.10 — STANDARDS AND SPECIFICATIONS

Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 37.10

Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/cefde168-ccfb-4b49-a964-b91214a4705c

37.10 - STANDARDS AND SPECIFICATIONS.

(1) Tracking. For plan approval and issuance of a permit, there must be adequate provisions to prevent the tracking or dropping of dirt or other materials from the site onto any public or private street. (2) Concrete Management. For plan approval and issuance of a permit, the applicant shall provide a plan for Engineering review and approval that documents methods to control and limit concrete waste material from leaving the site, discharging into the sewer, or infiltrating into the ground. (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) (3) Dewatering Plan. For plan approval and issuance of a permit, the applicant shall provide a plan for Engineering review and approval that documents the methods to control sediment from being discharged to the environment as part of any pumping (utility or site dewatering) to be done as part of this application. If this pumping plan exceeds seventy (70) gallons per minute (GPM) the applicant shall provide documentation of the WDNR dewatering and/or point well permits. Additionally, if Engineering staff suspects site contamination, based on documented reports on file with the WDNR, the applicant shall provide testing results documenting the condition of groundwater on the site. If contamination is found, no plan approval or issuance of a permit can be granted until and unless the applicant documents WDNR permits for discharge of contaminated groundwater to either the sanitary or storm sewer systems. Once WDNR approval is granted additional permits may be required from the Madison Metropolitan Sewerage District, City/County Health and City Engineering. (4) Groundwater Contamination. For projects in areas where a review of WDNR records indicate that possible groundwater contamination exists, the applicant shall be required to complete a site investigation including borings and groundwater testing prior to plan approval. (5) Technical Standards and Specifications. The design of all best management practices designed to meet the requirements of this ordinance shall comply with the following technical standards: (a) U.S. Natural Resources Conservation Service's "Field Office Technical Guide;" or its successor; (b) U.S. Natural Resources Conservation Service's Technical Release 55 (TR 55) "Urban Hydrology for Small Watersheds"; (c) U.S. Natural Resources Conservation Service's Engineering Field Manual for Conservation Practices; (d) U.S. Natural Resources Conservation Service's Engineering Handbook; (e) Wisconsin Department of Natural Resources' "Stormwater Management Technical Standards" as provided at https://dnr.wi.gov/topic/stormwater/, or its successor; (f) Any other technical methodology approved by the Dane County Conservationist and the Administrative Authority. (6) Design Criteria. The applicant for a permit may employ structural or nonstructural measures necessary to achieve all applicable standards set out in this ordinance. However, these measures will be evaluated to determine that they follow currently accepted design criteria and engineering standards. The following general principles shall be used when evaluating control plans and granting permits under this ordinance: (a) The smallest area of land shall be exposed for the shortest period at any given time during development. (b) The rough grading of the lot shall include backfilling the basement and all excess earth shall be hauled off the lot. (c) Accommodation of the increased runoff caused by changed soil and surface conditions during and after development. (d) Permanent, final plant covering or structures shall be installed prior to final acceptance. (e) The plan of development shall relate to the topography and soils of the site so that the lowest potential for erosion is created. (f) All detention and retention basins shall first be constructed to act as a settling basin during plat grading, road and utility construction with later conversion to a permanent basin upon transfer of the site to Building Inspection for management of individual construction erosion control sites. Upon the transfer of erosion control oversight to Building Inspection, which coincides with building permit issuance, the basins shall no longer be allowed to serve for erosion control. (g) Prior to final acceptance by the City and not prior to substantial completion of the development within the plat; all public detention and retention basins shall provide to the Administrative Authority an 'as-built' survey stamped by a Professional Engineer or Professional Surveyor in a format as determined by the Administrative Authority. (h) The developer for all plats or phases thereof shall submit for approval a "Post Erosion Control Plan" that details structural measures and responsibility for erosion control after the initial improvements have been made. The Post Erosion Control Plan shall propose erosion control measures to protect all improvements and include a re-vegetation schedule for denuded areas that takes into account the time of year. This plan may accompany the initial plan or be submitted separately, but must be approved prior to the City's acceptance of the plat improvements and issuance of building permits.

(Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) (Cr. by ORD-20-00051, 6-10-20)

Ask a question about Madison law

Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.