For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.805.090 — Minimum requirements for treatment

Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.805.090

Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/cf386e7b-34c4-41e7-8e7d-75f7d84e766e

22.805.090 - Minimum requirements for treatment

A. Applicability. The requirements of this Section 22.805.090 apply to the extent required in Section 22.805.050 to Section 22.805.060. B. Requirements. Water quality treatment facilities shall be installed to the extent allowed by law and maintained pursuant to rules promulgated by the Director to treat flows from the pollution-generating pervious and hard surfaces on the site being developed. When stormwater flows from other areas, including non-pollution generating surfaces (e.g., roofs), dewatering activities, and off-site areas, cannot be separated or bypassed, treatment BMPs shall be designed for the entire area draining to the treatment facility. All projects shall use on-site BMPs identified in subsection 22.805.070.D, or other infiltration BMPs authorized by rule, to the maximum extent feasible to meet the minimum requirements. For pollution-generating pervious surfaces other than artificial turf, a landscape management plan developed according to rules promulgated by the Director may be utilized in lieu of installing water quality treatment facilities. 1. Runoff volume. Stormwater treatment facilities shall be designed based on the stormwater runoff volume from the contributing area or a peak flow rate as follows: a. The daily runoff volume at or below which 91 percent of the total runoff volume for the simulation period occurs, as determined using an approved continuous model. It is calculated as follows: 1) Rank the daily runoff volumes from highest to lowest. 2) Sum all the daily volumes and multiply by 0.09. 3) Sequentially sum daily runoff volumes, starting with the highest value, until the total equals 9 percent of the total runoff volume. The last daily value added to the sum is defined as the water quality design volume. b. Different design flow rates are required depending on whether a treatment facility will be located upstream or downstream of a detention facility: 1) For facilities located upstream of detention or when detention is not required, the design flow rate is the flow rate at or below which 91 percent of the total runoff volume for the simulation period is treated, as determined using an approved continuous runoff model. 2) For facilities located downstream of detention, the design flow rate shall be the full 2-year release rate, as determined using an approved continuous runoff model. c. Infiltration facilities designed for water quality treatment must infiltrate 91 percent of the total runoff volume as determined using an approved continuous runoff model. To prevent the onset of anaerobic conditions, an infiltration facility designed for water quality treatment purposes must be designed to drain the water quality design treatment volume (the 91st percentile, 24-hour volume) within 48 hours. 2. Basic treatment. A basic treatment facility is required for all projects. The requirements of subsection 22.805.090.B.3 (Oil control treatment), subsection 22.805.090.B.4 (Phosphorus treatment), and subsection 22.805.090.B.5 (Metals treatment) are in addition to this basic treatment requirement. 3. Oil control treatment. An oil control treatment facility is required for high-use sites, as defined in this subtitle. 4. Phosphorus treatment. A phosphorus treatment facility is required for projects discharging into nutrient-critical receiving waters. 5. Metals treatment. Except for landscaped areas (unless containing crumb rubber) and projects that discharge to a basic treatment receiving water, a metals treatment facility for reducing concentrations of dissolved metals is required for projects that discharge, directly or through conveyance systems, to fresh waters designated for aquatic life use or having an existing aquatic life use, or that use infiltration strictly for flow control (not treatment) and discharge within 1/4 mile of fresh waters designated for aquatic life use or having an existing aquatic life use, if the project meets one of the following criteria: a. For a parcel-based project, the project is industrial, is commercial, or proposes four or more dwelling units, or the site is subject to industrial activities. b. For a roadway project, the site includes a road: 1) With an expected Annual Average Daily Traffic count of 7,500 or greater; or 2) That provides on-street parking for commercial or industrial areas. 6. Discharges to groundwater. Direct discharge of untreated drainage water from pollution-generating hard surfaces to groundwater is prohibited. C. Inspection and maintenance schedule. Temporary and permanent treatment facilities shall be inspected and maintained according to rules promulgated by the Director to keep these facilities in continuous working order.

(Ord. 127444, § 5, 2026; Ord. 126336, § 4, 2021; Ord. 124872, § 42, 2015; Ord. 123105, § 3, 2009.)

Ask a question about Seattle law

Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.