Sec. 30-82. - Definitions.
The following definitions are applicable within this chapter:
Asphalt patch/seal material: Any bituminous based material that is used to patch/repair an asphalt surface; limited to the top 1—2 inches of the existing asphalt surface layer; considered a pre-treatment for a surface treatment.
Mill and overlay/inlay: The addition of another layer of asphalt material or rubberized asphalt pavement on the existing roadway. This can be performed either through the removal and replacement of a 1 to 2-inch thick layer to maintain the current surface elevations or by placing an additional layer of pavement on top of the existing surface, as determined by the city designated pavement manager.
City engineer: The city's engineer and his or her designee.
City transportation director [The city transportation director] and his or her designee.
Glendale projects: Public improvement projects for which the City of Glendale is the general contracting agency.
New pavement: Paving material applied in or near the right-of-way to construct a new street, highway, alley, road or bikeway where no such material previously existed.
Pavement reconstruction: Rebuilding a portion of the street by removing all the pavement material and re-paving.
Pavement renovation: A major rehabilitation of street pavement, which includes mill and overlay, cold in place recycle, hot in place recycle, fractured aggregate surface treatment, cape seal, and stress absorbing membrane interlayer or other similar roadway improvement that physically modifies the surface of the roadway.
Pavement cut permit fee: The fee required by the city and deposited into the transportation department's street maintenance program to supplement restoration cost when a permittee cuts into, excavates, opens, bores, trenches, potholes, damages, or disturbs pavement in the right-of-way.
Permit charges: Fees assessed at the time of issuance of a right-of-way permit that are intended to cover costs incurred by the city for permit processing, plan review services, materials testing and inspections. Refer to latest schedule of fees and charges.
Permittee: The governmental entity, person, or business entity that has received a right-of-way permit pursuant to this section or engaged in construction or maintenance in the right-of-way.
Right-of-way: An area of land which by deed, conveyance, agreement, easement, dedication, usage or process of law is reserved or dedicated to the city for public purposes including, but not limited to, street, highway, alley, public utility, pedestrian walkway, bikeway, or drainage. Within [the] public right-of-way, the City of Glendale coordinates the locations of public or private improvements, underground or overhead; including electricity, gas, steam, communication, telecommunications, data transmission, cable TV, water, storm drainage, sewage, sidewalks, landscaping, traffic signals, streetlights, flood control, pedestrian, roadway purposes, etc. owned and operated by any person, firm, company, corporation, municipal department, or board duly authorized by federal, state, or municipal regulations.
Right-of-way improvement standards: A set of regulations setting forth the details, specifications, instructions, and procedures to be followed in the planning, design, installation, and construction of public or private improvements within the right-of-way or within easements; formulated by the city engineer, the county health department, the Maricopa Association of Governments, and other city departments.
Right-of-way permit: An official document issued by the city authorizing performance of a specified activity or work within the right-of-way and public easements of the City of Glendale by a person, contractor, company, firm, or corporation duly qualified under the statutes and rules of the Arizona Registrar of Contractors, unless exempted thereunder. A right-of-way permit may also authorize specified activity or work involving city utilities or facilities outside the corporate limits when issued in conjunction with the appropriate permit required for specified activity or work within another jurisdiction.
Street maintenance: Application of slurry and fog seals to street pavement or other typical street maintenance activities.
Surface treatment: Any bituminous surface treatment that is a thin (usually less than 1") protective wearing surface that is applied to an existing pavement or base course.
(Ord. No. O21-73, § 1, 10-26-21)