Sec. 55-143. - Wastewater discharge permit eligibility and issuance process.

(a) Wastewater survey. When requested by the director all industrial users must submit information on the nature and characteristics of their wastewater by completing a wastewater survey prior to commencing their discharge. The director is authorized to prepare a form for this purpose and may periodically require industrial users to update the survey. Failure to complete this survey shall be reasonable grounds for terminating service to the industrial user and shall be considered a violation of the article. (b) Requirement. (1) It shall be unlawful for any significant industrial user to discharge wastewater into the city's POTW without first obtaining a wastewater discharge permit from the director. Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this article and subjects the wastewater discharge permittee to the sanctions set out in section 55-146. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state and local law. (2) The director may require other industrial users, including liquid waste haulers, to obtain wastewater discharge permits as necessary to carry out the purposes of this article. (c) New connections. Any significant industrial user proposing to begin or recommence discharging industrial wastes into the POTW must obtain a wastewater discharge permit prior to the beginning or recommencing of such discharge. An application for this wastewater discharge permit must be filed at least ninety (90) days prior to the date upon which any discharge will begin. (d) Application contents. (1) In order to be considered for a wastewater discharge permit, all industrial users required to have a wastewater discharge permit must submit the information required by subsection 55-144(a)(2). The director shall approve a form to be used as a permit application. (2) In addition, the following information may be requested: a. Description of activities, facilities, and plant processes on the premises, including a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW. b. Number and type of employees, hours of operation, and proposed or actual hours of operation of the pretreatment facility. c. Each product produced by type, amount, process or processes, and rate of production. d. Type and amount of raw materials processed (average and maximum per day). e. The site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge. f. Time and duration of the discharge. g. Any other information as may be deemed necessary by the director to evaluate the wastewater discharge permit application. (3) Incomplete or inaccurate applications will not be processed and will be returned to the industrial user for revision. (e) Application signatories and certification. All wastewater discharge permit applications and industrial user reports must contain the following certification statement and be signed by an authorized representative of the industrial user. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (f) Decisions. The director will evaluate the data furnished by the industrial user and may require additional information. Within ninety (90) days of receipt of a complete wastewater discharge permit application, the director will determine whether or not to issue a wastewater discharge permit. If no determination is made within this time period, the application will be deemed denied, unless the director notifies the applicant that the time frame for decision has been extended due to need for additional evaluation time. The director may deny any application for a wastewater discharge permit. (g) Duration. Wastewater discharge permits shall be issued for a specified time period, not to exceed five (5) years. A wastewater discharge permit may be issued for a period less than five (5) years, at the discretion of the director. Each wastewater discharge permit will indicate a specific date upon which it will expire. (h) Contents. Wastewater discharge permits shall include such conditions as are reasonably deemed necessary by the director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, protect ambient air quality, and protect against damage to the POTW. (1) Wastewater discharge permits must contain the following conditions: a. A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years. b. A statement that the wastewater discharge permit is nontransferable without prior notification to and approval from the city, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit. c. Effluent limits, including BMPs, applicable to the user based on applicable standards in federal, state, and local law. d. Self-monitoring, sampling, reporting, notification, and record keeping requirements, all expenses for such requirements to be paid by permittee. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. e. Statement of applicable civil, criminal, and administrative penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. f. Permittee agrees to indemnify and pay the city for the following costs incurred by the city, in the event of a user's permit violation: 1. Attorney's fees; 2. Costs for any and all laboratory and investigation expenses; 3. Penalties and fines incurred by the city to the federal and state governments arising from violation of any of the city's discharge permits as a result of permittee's violation(s). g. Requirement for permittee to immediately notify the POTW in the event of a failure of pretreatment facility or pretreatment equipment. h. Requirements to control slug discharge, if determined by the director to be necessary. (2) Wastewater discharge permits may contain, but need not be limited to, the following: a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization. b. Limits on the instantaneous, daily and monthly average and/or maximum concentration, mass, or other measure of identified wastewater pollutants or properties. c. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works. d. Development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or routine discharges. e. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW. f. The unit charge or schedule of industrial user charges and fees for the management of the wastewater discharged to the POTW. g. Requirements for installation and maintenance of inspection and sampling facilities and equipment. h. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit. i. Other conditions as deemed appropriate by the director to ensure compliance with this article, and state and federal laws, rules, and regulations. (i) Appeals. Any person, including the industrial user, may petition the city manager to reconsider the terms of a wastewater discharge permit within fifteen (15) days of its issuance. (1) Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal. (2) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the wastewater discharge permit. (3) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (4) If the city manager fails to act within thirty (30) days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit, shall be considered final action for purposes of council review. (5) Aggrieved parties may appeal to the city council, which appeal shall be perfected by filing a sworn notice of appeal with the city secretary within fifteen (15) days from the city manager's final decision or deemed denial. (j) Modification. (1) The director may modify the wastewater discharge permit for good cause including, but not limited to, the following: a. To incorporate any new or revised federal, state, or local pretreatment standards or requirements. b. To address significant alterations or additions to the industrial user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance. c. A change in the POTW or in treatment demands of the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge. d. Information indicating that the permitted discharge poses a threat to the city's POTW, city personnel, or the receiving waters. e. Violation of any terms or conditions of the wastewater discharge permit, or violation of city ordinance pertaining to waste treatment. f. Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting. g. Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13. h. To correct typographical or other errors in the wastewater discharge permit. i. To reflect a transfer of the facility ownership and/or operation to a new owner/operator. j. User's discharge has caused the POTW to violate federal or state permit requirements. (2) The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition. (k) Transfer. (1) Wastewater discharge permits may be reassigned or transferred to a new owner and/or operator only if the permittee gives at least thirty (30) days' advance notice to the director and the director approves the wastewater discharge permit transfer. The notice to the director must include a written certification by the new owner and/or operator which: a. States that the new owner and/or operator has no immediate intent to change the facility's operations and processes. b. Identifies the specific date on which the transfer is to occur. c. Acknowledges full responsibility for complying with the existing wastewater discharge permit and assuming the liabilities thereof, including joint and several responsibilities with the former permittee for pending or unresolved notices of permit and ordinance violations. (2) Unresolved allegations of permit and ordinance violations and/or unpaid indemnity obligations, fines, or penalties owed by the permittee shall be grounds for the director's denial of permit transfer. The director, in his discretion, may deny transfer of a permit when such grounds are present. (3) Failure to provide advance notice of a transfer renders the wastewater discharge permit voidable on the date of facility transfer. (l) Revocation. (1) Wastewater discharge permits may be revoked for the following reasons: a. Failure to notify the city of significant changes to the wastewater prior to the changed discharge. b. Failure to provide prior notification to the city of changed condition pursuant to subsection 55-144(e). c. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application. d. Falsifying self-monitoring reports, or withholding of information material to such reports. e. Tampering with monitoring equipment. f. Refusing to allow the city timely access to the facility premises and records. g. Failure to meet effluent limitations. h. Failure to pay fines, penalties, or indemnification obligations. i. Failure to pay sewer charges. j. Failure to meet compliance schedules. k. Failure to complete a wastewater survey or the wastewater discharge permit application. l. Failure to provide advance notice of the transfer of a permitted facility. m. Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or the article. n. Failure to notify the POTW of a failure in pretreatment facility or equipment. (2) Wastewater discharge permits shall be voidable upon nonuse, cessation of operations, or transfer of business ownership. All wastewater discharge permits are void upon the issuance of a new wastewater discharge permit. (m) Reissuance. A significant industrial user shall apply for wastewater discharge permit reissuance by submitting a complete wastewater discharge permit application in accordance with subsection 55-143(e) a minimum of sixty (60) days prior to the expiration of the industrial user's existing wastewater discharge permit. (n) Regulation of wastes received from other jurisdictions. (1) If another jurisdiction, or user located within another jurisdiction, contributes wastewater to the POTW, the director shall enter into an inter local cooperative agreement with the contributing jurisdiction. (2) Prior to entering into an agreement required above, the director shall request the following information from the contributing jurisdiction: a. A description of the quality and volume of wastewater discharged to the POTW by the contributing jurisdiction; b. An inventory of all users located within the contributing jurisdiction that are discharging to the city POTW; and c. Such other information as the director may deem necessary.

(Ord. No. 21666, § 1, 6-1-1993; Ord. No. 25377, § 8, 7-22-2003; Ord. No. 032342, § 1, 2-9-2021)