§ 46-106 — Utility cuts; excavation and backfill
Code of Ordinances, City of Hattiesburg, Mississippi (Supp. No. 3: codified through Ordinance No. 3388, enacted September 16, 2025) · Hattiesburg Code of Ordinances § 46-106
Corpus is an independent public-information project, not the official City of Hattiesburg website. Stable reference: corpuslaw.us/code/d0973efd-e014-4c60-be8b-aa55417bef50
Sec. 46-106. - Utility cuts; excavation and backfill.
(a) Utility cuts for hand holes and manholes should be included within the drawing when the permit is submitted. No other utility cuts shall be done without the city engineer's discretion. If any pavement cuts are needed within major or minor city streets, they have to be approved by the city engineer. Pavement cuts may require a bond at the city engineer's discretion. (b) Methods of construction for excavation and backfill shall be in accordance with the standard specifications for road and bridge construction standards for the city as determined by the city engineer and such provisions as are included herein and as may be added in the special conditions. No opening or excavation of a cross trench shall extend beyond the centerline of the road before being backfilled, compacted and the surface of the roadway temporarily restored. All trenches within a paved area shall only be backfilled in the top five feet with 12-inch lifts and compacted with mechanical compaction. No excavation shall take place unless the mechanical compactor is actually on the site. All utility facilities shall be located sufficiently ahead of trench excavation work to avoid damage of those facilities and to permit their relocation, if necessary. Storm drains, pipe culverts or other facilities encountered shall be adequately protected by the permittee. If the work performed interferes with the established drainage system of any street, road, or alley, adequate provision shall be made by the permittee to provide proper drainage during construction and to restore the existing system, all to the satisfaction of the city engineer or his/her permit administrator. No dewatering equipment, wells, points, or piping shall occupy the traveled portion of roadways unless specifically approved and adequately protected to the satisfaction of the city engineer or his/her permit administrator. Effluent from dewatering systems shall be discharged in such a manner that erodible soils are not adversely affected. All silt sediments being carried in the dewatering effluent must be intercepted prior to effluent discharge into any drainage system through use of a sedimentation basin designed to allow retention of discharge for sufficient time to render such waters free of suspended silt and sediments. The use of screening devices in lieu of sedimentation basin must receive specific approval from the city engineer or his/her permit administrator and be employed only for minor flows. Any gravel, earth or other excavated material which is caused to roll, flow, or wash upon any road shall be removed from the roadway after deposit and such removal shall not occur more than 24 hours therefrom. In the event the earth, gravel or other excavated material so deposited is not removed, the city or another on behalf of the city may remove the material and any and all costs incurred shall be paid by the permittee or applied from his/her bond. The permittee shall employ construction methods and rests that will keep flying dust to the minimum to the satisfaction of the city engineer or his/her permit administrator. At the first sign of precipitation, all work on the shoulders and traveled way of streets and alleys shall stop and they shall be cleared of all dirt, gravel, and loose materials and the area backfilled until the weather permits resumption of work. (c) Backfilling shall be carefully performed and the original surface restored. The manholes or trenches shall be backfilled with fine, loose earth, free from large clods or stones, carefully rammed until enough has been placed to provide a cover of not less than one foot above the pipe or other installed infrastructure. The remainder of the backfill material shall be placed in successive loose layers not to exceed 12 inches and compacted until a density of at least that of adjacent soil is attained. Whenever the trenches or manholes have not been properly filled, or if settlement occurs, the contractor is responsible to refill, smooth off, and made to conform to the surface of the ground. Backfill in areas to be paved shall be made at 95 percent standard proctor for major city streets. Minor streets should backfilled in 12-inch lifts to a compaction where no further pumping is noticed. Such fill shall be compacted with mechanical tampers so that, when completed, the compacted soil shall have a density of at least that of the undisturbed adjacent ground.
(Ord. No. 3236, § 7, 7-17-2018)
Ask a question about Hattiesburg law
Corpus searches the Hattiesburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.