§ 601.040 — Duties and responsibilities of the floodplain administrator
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 601.040
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/d0c2bfa3-1397-457a-959f-247072209c29
Sec. 601.040. - Duties and responsibilities of the floodplain administrator.
The Floodplain Administrator is hereby appointed to administer, implement, and enforce this ordinance by granting or denying development permits in accordance with its provisions. The Floodplain Administrator may delegate authority to implement these provisions. Duties of the floodplain administrator, or their designee, shall include, but not be limited to: (a) Permit review. Determine that development permits meet the following criteria: (1) The permit requirements of this chapter have been satisfied; (2) All other required local, state, and federal permits have been obtained and approved; (3) If the development is located in the floodway, assure that the floodway provisions of SRC 601.075(d) are met; and (4) The proposed development is designed based on Base Flood Elevation (BFE) data available either through the Flood Insurance Study (FIS) or from another authoritative source. If BFE data is not available, then the development shall comply with the provisions of SRC 601.070(c); (5) The development plans shall indicate the minimum elevation of the lowest floor based on the Base Flood Elevation (BFE) applicable to any building requiring a development permit; (6) The permit requirements have been satisfied related to substantial improvements if the proposed development qualifies as a substantial improvement as defined in SRC 601.005; (7) The provisions in SRC 601.070(a)(1) have been satisfied if the proposed development activity is a watercourse alteration; (8) The provisions in SRC Chapter 82 have been satisfied if the proposed development activity includes the placement of fill or excavation; and (9) Determine whether the proposed development activity complies with the no-let loss standards and mitigation assessment and mitigation plans required under SRC 601.100. (b) Information to be obtained and maintained. The following information shall be obtained and maintained and shall be made available for public inspection as needed: (1) Obtain, record, and maintain the actual elevation (in relation to mean sea level) of the lowest floor (including basements) and all attendant utilities of all new or substantially improved structures where Base Flood Elevation (BFE) data is provided through the Flood Insurance Study (FIS), or Flood Insurance Rate Map (FIRM), or obtained in accordance with SRC 601.070(c); (2) Obtain and record the elevation (in relation to mean sea level) of the natural grade of the building site for a structure prior to the start of construction and the placement of any fill and ensure that the requirements of SRC 601.075(d) and SRC 601.040(a)(2) are adhered to; (3) Upon placement of the lowest floor of a structure (including basement) but prior to further vertical construction, obtain documentation, prepared and sealed by a professional licensed surveyor or engineer, certifying the elevation (in relation to mean sea level) of the lowest floor (including basement); (4) Where base flood elevation data are utilized, obtain as-built certification of the elevation (in relation to mean sea level) of the lowest floor (including basement) prepared and sealed by a professional licensed surveyor or engineer, prior to the final inspection; (5) Maintain all Elevation Certificates (EC) submitted to the City of Salem; (6) Obtain, record, and maintain the elevation (in relation to mean sea level) to which the structure and all attendant utilities were floodproofed for all new or substantially improved floodproofed structures where allowed under this chapter and where Base Flood Elevation (BFE) data is provided through the FIS, or FIRM, or obtained in accordance with SRC 601.070(c); (7) Maintain all floodproofing certificates required under this chapter; (8) Record and maintain all variance actions, including justification for their issuance; (9) Obtain and maintain all hydrologic and hydraulic analyses performed as required under SRC 601.075(d); (10) Record and maintain all Substantial Improvement and Substantial Damage calculations and determinations as required under SRC 601.040(f); (11) Maintain for public inspection all records pertaining to the provisions of this chapter; (12) Obtain and maintain all habitat and mitigation assessment and mitigation plans required under SRC 601.100. (c) Community boundary alterations. The Floodplain Administrator shall notify the Federal Insurance Administrator in writing whenever the boundaries of the community have been modified by annexation or the community has otherwise assumed authority or no longer has authority to adopt and enforce floodplain management regulations for a particular area, to ensure that all Flood Hazard Boundary Maps (FHBM) and Flood Insurance Rate Maps (FIRM) accurately represent the community's boundaries. Such notification shall include a copy of a map of the community suitable for reproduction, clearly delineating the new corporate limits or new area for which the community has assumed or relinquished floodplain management regulatory authority. (d) Watercourse alterations. (1) Notify adjacent communities, the Department of Land Conservation and Development, and other appropriate state and federal agencies, prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration. This notification shall be provided by the applicant to the Federal Insurance Administration as a Letter of Map Revision (LOMR) along with either: (A) A proposed maintenance plan to assure the flood carrying capacity within the altered or relocated portion of the watercourse is maintained; or (B) Certification by a registered professional engineer that the project has been designed to retain its flood carrying capacity without periodic maintenance. (2) The applicant shall be required to submit a Conditional Letter of Map Revision (CLOMR) when required under SRC 601.040(e). The Floodplain Administrator shall ensure compliance with all applicable requirements in SRC 601.040(e) and 601.070(a)(1). (e) Requirement to submit new technical data. (1) A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding conditions. As soon as practicable, but not later than six months after the date such information becomes available, a community shall notify the Federal Insurance Administrator of the changes by submitting technical or scientific data in accordance with Section 44 of the Code of Federal Regulations (CFR), Subsection 65.3. The community may require the applicant to submit such data and review fees required for compliance with this section through the applicable FEMA Letter of Map Change (LOMC) process. (2) The Floodplain Administrator shall require a Conditional Letter of Map Revision prior to the issuance of a floodplain development permit for: (A) Proposed floodway encroachments that increase the base flood elevation; and (B) Proposed development which increases the base flood elevation by more than one foot in areas where FEMA has provided base flood elevations but no floodway. (3) An applicant shall notify FEMA within six months of project completion when an applicant has obtained a Conditional Letter of Map Revision (CLOMR) from FEMA. This notification to FEMA shall be provided as a Letter of Map Revision (LOMR). (f) Substantial improvement and substantial damage assessments and determinations. (1) Conduct Substantial Improvement (SI) (as defined in SRC 601.005) reviews for all structural development proposal applications and maintain a record of SI calculations within permit files in accordance with SRC 601.040(b). (2) Conduct Substantial Damage (SD) (as defined in SRC 601.005) assessments when structures are damaged due to a natural hazard event or other causes. Make SD determinations whenever structures within the SFHA (as established in SRC 601.030(a)) are damaged to the extent that the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.
(Ord. No. 17-19, § 2(Exh. A), 10-14-2019; Ord. No. 6-25, § 1(Exh. A), 6-9-2025)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
