§ 6-3 — SCHEDULE OF PERMIT FEES
Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 6-3
Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/d0e59151-612a-4d5a-94cd-2dae5b9b80be
Sec. 6-3. SCHEDULE OF PERMIT FEES
a. Building permit fees. 1. New residential construction fees shall be $0.47 per each square foot of building space. Residential construction shall include all single family detached residences and single family attached residences including duplexes, townhomes and condominiums. Minimum fee fifty dollars ($50.00). (Ord. No. 0-2010-99, 9/22/10)(Ord. No. 0-2015-107; 12/9/15) (Ord. No. 0-2019-80; 9/25/19)(Ord. No. 0-2020-85; 9/9/20)(Ord. No. 0-2021-91; 9/22/21)(Ord. No. 0-2024-85; 9/11/24)(Ord. No. 0-2026-48;9/9/26) 2. Nonresidential, commercial and industrial new construction and alteration, additions and repairs. Building permit and fire inspection fees, not including plumbing and electrical permits and inspections fees, on all nonresidential, commercial and industrial new construction and alteration, additions and repairs, shall be five dollars ($5.00) per each one thousand dollars ($1,000.00) of estimated construction valuation. Minimum fee fifty dollars ($50.00). (Ord. No. 0-2026-48;9/9/26) (Ord. No. 0-2010-99, 9/22/10)(Ord. No. 0-2015-107; 12/9/15) (Ord. No. 0-2019-80; 9/25/19) (Ord. No. 0-2020-85; 9/9/20) (Ord. No. 0-2024-85;9/11/24)(Ord. No. 0-2026-48;9/9/26) 3. Residential, alteration, additions and repairs fees shall be $0.47 per each square foot of area being remodeled, altered, added, or repaired. The minimum fee for any type of permit shall be fifty dollars ($50.00). (Ord. No. 0-2026-48;9/9/26) (Ord. No. 0-2010-99, 9/22/10)(Ord. No. 0-2015-107; 12/9/15) (Ord. No. 0-2019-80; 9/25/19) (Ord. No. 0-2020-85; 9/9/20) (Ord. No. 0-2024-85; 9/11/24)(Ord. No. 0-2026-48;9/9/26) 4. When the estimated construction valuation is not available, or the provided estimate of construction valuation is, in the opinion of the Chief Building Official, not consistent with business or industry-wide construction valuation standards, the Chief Building Official may assign the valuation in accordance with the latest Building Valuation Data, as published by the International Code Council. (Ord. No. 0-2026-48;9/9/26) 5. The fee for reinspection shall be fifty dollars ($50.00). (Ord. No. 0-2026-48;9/9/26) 6. The fee for plan review shall be twenty-five (25) percent of the permit fee, to be paid when plans are submitted for nonresidential, commercial, and industrial plans. The fee for plan review shall be twenty (20) percent of the permit fee, to be paid when plans are submitted for new residential, residential alteration, addition or repair. If staffing is available, expedited plan review fees for non-civil plans shall be three hundred (300) percent of the normal permit fee plus one hundred (100) dollars per hour. The fee applies to voluntary requests for expedited plan review from applicants. (Ord. No. 0-2026-48;9/9/26) 7. Clean and Show - $30.00 (Ord. No. 0-2026-48;9/9/26) b. Cooling and heating systems: 1. Minimum permit fee-fifty dollars ($50.00). (Ord. No. 0-2026-48;9/9/26) 2. Fee for inspecting heating, ventilating, ductwork, air-conditioning and refrigeration systems shall be minimum fifty dollars ($50.00). (Ord. No. 0-2026-48;9/9/26) 3. Fee for inspecting repairs, alterations and additions to an existing system shall be Fifty dollars ($50.00). (Ord. No. 0-2026-48;9/9/26) 4. If it is necessary to make a reinspection of a heating, ventilating, air conditioning or refrigeration system, or boiler installation, the installer of such equipment shall pay a reinspection fee of Fifty dollars ($50.00). (Ord. No. 0-2026-48;9/9/26) 5. When preliminary inspection is requested for purposes permitting temporary operation of heating, ventilating, refrigeration, or air conditioning system, or portion thereof, a fee of fifty dollars ($50.00) shall be paid by the contractor requesting such preliminary inspection. If the system is not approved for temporary operation on the first preliminary inspection, the usual reinspection fee of fifty dollars ($50.00) shall be charged for each subsequent preliminary inspection for such purpose. (Ord. No. 0-2026-48;9/9/26) 6. Building Contractor's Registration: fifty dollars ($50.00) (to expire December 31 of each (year). At the time of registration, applicants for registration that are seeking to build, alter or remodel one- or two-family residences shall submit to the Building Inspection Department proof that they have made application for the appropriate State registration as well. (Ord. No. 0-2026-48;9/9/26) c. Permit fees for signs: 1. Wall Sign / Façade Sign | Less than 50 square feet | $35.00 (Ord. No. 0-2026-48;9/9/26) More than 50 square feet | $60.00 (Ord. No. 0-2026-48;9/9/26) 2. Awning Sign | Less than 50 square feet | $60.00 (Ord. No. 0-2026-48;9/9/26) More than 50 square feet | $80.00 (Ord. No. 0-2026-48;9/9/26) 3. Projecting Sign | Under 50 square feet | $60.00 4.Freestanding/ Monument Sign | Less than 50 square feet | $60.00 (Ord. No. 0-2026-48 ;9/9/26) More than 50 square feet | $80.00 (Ord. No. 0-2026-48 ;9/9/26) 5. Electronic Message Center | | $150.00 (Ord. No. 0-2026-48 ;9/9/26) 6. Directional Sign | | $35.00 (Ord. No. 0-2026-48 ;9/9/26) 7. Neon, Argon, or Other Gas Tubing on Any Building | | $70.00 (Ord. No. 0-2026-48 ;9/9/26) 8. Billboard | Single face | $150.00 (Ord. No. 0-2026-48 ;9/9/26) Double face | $300.00 (Ord. No. 0-2026-48 ;9/9/26) 9. Sign Contractor's Registration | | $50.00 (Ord. No. 0-2026-48 ;9/9/26) 10. Sign Bond (bond to be furnised to City each year or a continuation certificate from a bonding company; bond to expire December 31 each year, same as the license) | | $5,000.00 (Ord. No. 0-2026-48 ;9/9/26) (Ord. No. 0-2011-46, 6/8/11) (Ord. No. 0-2019-80; 9/25/19) (Ord. No. 0-2024-85; 9/11/24) (Ord. No. 0-2026-48;9/9/26) d. Demolition of buildings or structures: 1. Residential permits | | 50.00 (Ord. No. 0-2026-48;9/9/26) 2 . Residential accessory building | | 50.00 (Ord. No. 0-2026-48;9/9/26) 3. Commercial or industrial: | 0 to 2,000 sq. ft | 60.00 plus per 100 sq. ft | 2.50 (Ord. No. 0-2026-48;9/9/26) In addition to this permit fee, actual cost reimbursement shall be charged for all City personnel and vehicles involved in said demolition permits. (Ord. No. 0-2026-48;9/9/26) e. Moving of buildings or structures: 1. The following fees are established and shall be paid to the City before any permit is issued to move any building in, through or out of the City. (a) For buildings having 500 sq. ft. of floor space or less | $75.00 (Ord. No. 0-2026-48;9/9/26) (b) For buildings having 501 sq. ft. to 750 sq. ft. of floor space | 85.00 (Ord. No. 0-2026-48;9/9/26) (c) For buildings having 751 sq. ft. to 1,000 sq. ft. of floor space | 100.00 (Ord. No. 0-2026-48;9/9/26) (d) For buildings having 1,001 sq. ft. or more | 150.00 (Ord. No. 0-2026-48;9/9/26) 2. In addition to this permit fee, actual cost reimbursement shall be charged for all City personnel and vehicles involved in said structural moving. (Ord. No. 0-2026-48;9/9/26) 3. Housemover's registration $50.00 (Ord. No. 0-2026-48;9/9/26) 4. Housemover's bond See State Requirements (Ord. No. 0-2026-48;9/9/26) f. Miscellaneous 1. Grading - Residential & Commercial | $50.00 (Ord. No. 0-2026-48;9/9/26) 2. Certificate of Occupancy (Commercial only) | 80.00 (Ord. No. 0-2026-48;9/9/26) 3. Temporary Certificate of Occupancy (Commercial only) | 40.00 (Ord. No. 0-2026-48;9/9/26) 4. Driveway Approach | 50.00 (Ord. No. 0-2026-48;9/9/26) 5. Floodplain Permit | 50.00 (Ord. No. 0-2026-48;9/9/26) 6. Construction Noise Permit | No Fee (Ord. No. 0-2026-48;9/9/26) 7. Retaining Wall | 50.00 (Ord. No. 0-2026-48;9/9/26) 8. Generator Installation | 50.00 (Ord. No. 0-2026-48;9/9/26) 9. Solar Panel - Residential | 100.00+Elec. Permit (Ord. No. 0-2026-48;9/9/26) 10. Roof Replacement - Residential | 100.00 (Ord. No. 0-2026-48;9/9/26) 11. Swimming pools - Residential | 150.00 (Ord. No. 0-2026-48;9/9/26) 12. Archived Plan Retrieval | $50 per set of plans (Ord. No. 0-2026-48;9/9/26) In the event any building or structure is started without a permit, the above fees will be increased one hundred (100) percent. (Ord. No. 0-2026-48;9/9/26) No fees shall be refunded, waived, reduced or transferable, except where approved by City Council. (Ord. No. O-93-46, Pt. 2, 7-12-93; Ord. No. O-93-68, Pt. 2, 9-8-93; Ord No. O-93-83, Pt. 1, 10-1-93) (Ord. No. 0-96-2000, 4/4/96) (Ord. No. 0-2001-59, 12/5/2001) (Ord. No. 0-2002-38, 9/11/02) (0-2006-79; 9-13-2006) (Ord. No. 0-2008-140; 11/12/08) (Ord. No. 0-2011-46, 6/8/11) (Ord. No. 0-2012-69, 9/12/12) (Ord. No. 0-2015-107; 12/9/15) (Ord. No. 0-2017-99; 10/25/17) (Ord. No. 0-2019-80; 9/25/19) (Ord. No. 0-2021-91; 9/22/21) (Ord. No. 0-2024-85; 9/11/24) (Ord. No. 0-2026-48;9/9/26)
Ask a question about Tyler law
Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.
