15.08.770 - Costs - Responsibility of applicant - Deposit required when.
A. If a water main extension is required, as determined by the department, to serve the premises of an applicant for water service, the city may in its sole discretion require such main extension and shall require the applicant to pay the cost of service connections. Such main extensions and installation of service connections may be accomplished in city's sole discretion either: 1. By contract between the city and applicant whereby applicant installs all such water mains and service connections (except meters) and pays the engineering costs and the fees and charges hereinafter prescribed; or 2. By contract between applicant and city whereby city agrees to install the main extensions and service connections and applicant pays to city the actual cost of installation of said water mains and of said service connections and engineering costs, together with the fees and charges hereinafter prescribed. B. The city may, but will not be required to, make extensions under this rule in easements or rights-of-way where final grades have not been established, or where street grades have not been brought to those established by the city. If extensions are made when grades have not been established and there is a reasonable probability that the existing grade will be changed, the department shall require that the applicant for the main extension deposit, at the time of execution of the main extension agreement, the estimated net cost of relocating, raising or lowering facilities upon establishment of final grades. Adjustment of any difference between the amount so deposited and the actual cost of relocating, raising or lowering facilities shall be made within ten days after the department has ascertained such actual cost. The net deposit representing actual cost is not subject to refund. The entire deposit related to the proposed relocation, raising or lowering shall be refunded when such displacements are determined by the department to be not required.
(Prior code § 7606.2.)