§ 35-F132 — Application
San Antonio City Code (Supp. No. 147: codified through Ordinance No. 2026-09-10-547, adopted Sept. 10, 2026) · San Antonio Unified Development Code § 35-F132
Corpus is an independent public-information project, not the official City of San Antonio website. Stable reference: corpuslaw.us/code/d2d09005-eeab-45c9-b71e-48af65926c70
Sec. 35-F132. - Application.
(a) Application for a floodplain development permit must be approved by the floodplain administrator, on a form furnished by him, prior to any development. Application for a floodplain development permit for a proposed subdivision may be presented prior to or in conjunction with other data required for the platting process. For platting purposes, a floodplain development permit shall serve only as an approval of the floodplain ordinance requirements. No cut/or fill, building, or other site alterations shall proceed until the permit is approved. The permit application shall be accompanied by supporting data prepared by a licensed professional civil engineer in the State of Texas. Data required by the City of San Antonio Floodplain Submittal Checklist (see section 35-B106 for submittal requirements), must accompany all floodplain development permit applications except building renovation, reconstruction and restoration. (b) In addition to the above, the following information is required, depending on the submittal type: (1) An elevation certificate for buildings on property located in or abutting the floodplain. (2) Elevation in relation to mean sea level to which any nonresidential structure shall be floodproofed. (3) Certification from a registered professional civil engineer that the nonresidential floodproofed structure shall meet the floodproofing criteria of section 35-F142. (4) Description of the extent to which any watercourse or natural drainage will be altered or relocated as a result of proposed development; (5) Maintain a record of all such information in accordance with subsection 35-F122(a)(1). (6) An existing structure may be improved (remodeled) when the improvement does not constitute a substantial improvement. In the event that the work is considered a substantial improvement then the structure must be brought into compliance with this ordinance.
(Ord. No. 95415 § 1 Attachment A) (Ord. No. 2010-10-14-0894, § 2, 10-14-10) (Ord. No. 2010-11-18-0985, § 2, 11-18-10; Ord. No. 2022-11-03-0831, § 2, 11-3-22, eff. 1-1-23)
Ask a question about San Antonio law
Corpus searches the San Antonio sections it holds and shows the ones that match, with their citations. Free, no sign-in.
