Site characterization.
10 C.F.R. § 63.15
in effectEffective (a) DOE shall conduct a program of site characterization with respect to the Yucca Mountain site before it submits an application for a license to be issued under this part.
(b) DOE shall conduct the investigations to obtain the required information in a manner that limits adverse effects on the long-term performance of the geologic repository at Yucca Mountain to the extent practical.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-10.xmlFetched: 7/26/2026
