§ 17-0601 — Baseline monitoring reports
Fargo Municipal Code, Fargo, North Dakota (Supp. No. 14, Update 5: codified through Ordinance No. 5555, adopted August 17, 2026) · Fargo Municipal Code § 17-0601
Corpus is an independent public-information project, not the official City of Fargo website. Stable reference: corpuslaw.us/code/d3d433e7-b998-4a2e-a86d-40c19705fb61
17-0601. - Baseline monitoring reports.
A. Within either one hundred and eighty (180) days after the effective date of a categorical pretreatment standard or the final administrative decision on a category determination under 40 C.F.R. §403.6(a)(4) (whichever is later) existing categorical users currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the city a report which contains the information listed in subsection B, below. At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the city a report which contains the information listed in subsection B, below. A new source shall also be required to report the method of retreatment it intends to use to meet applicable categorical standards. A new source shall also give estimates of its anticipated flow and quantity off pollutants discharged. B. Users described above shall submit the following information: 1. Identifying Information. The name and address of the facility, including the name of the operator and owner. 2. Environmental Permits. A list of any environmental control permits held by or for the facility. 3. Description of Operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. 4. Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 C.F.R. §403.6(e). 5. Measurement of Pollutants. i. The categorical pretreatment standards applicable to each regulated process. ii. The results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the city) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in article 17-07. iii. Sampling must be performed in accordance with procedures set out in article 17-07. 6. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment, is required to meet the pretreatment standards and requirements. 7. Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in the schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 17-0604. 8. Signature and Certification. All baseline monitoring reports must be signed and certified in accordance with section 17-0506.
Source: 5203 (2019).
Ask a question about Fargo law
Corpus searches the Fargo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
