For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2-272 — Plan review fee

Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026) · Miami City Code § 2-272

Corpus is an independent public-information project, not the official City of Miami website. Stable reference: corpuslaw.us/code/d3e8fbef-7082-48c8-a900-01a5a74778c4

Sec. 2-272. - Plan review fee.

(a) The fees to be charged by the department of resilience and public works for processing and reviewing private development plans submitted for approval of the city are hereby fixed as follows: (1) Fence, wall, slab, or sign .....$50.00 (2) Underground tank .....$155.00 (3) Single-family or duplex residential construction, reconstruction, remodeling, renovation, repair, or addition .....$268.00 (4) Multi-family residential and all nonresidential construction, reconstruction, remodeling, renovation, repair, or addition: ..... New multi-family residential (<½ acre) .....$1,335.00 New commercial (<½ acre) .....$1,535.00 New multi-family residential (≥½ acre and <1 acre) .....$1,995.00 New commercial (≥½ acre and <1 acre) .....$2,155.00 Large development (residential/commercial ≥1 acre) .....$3,500.00 (5) Subdivision improvement engineering plan .....$2,500.00 (6) Review and marking of base building line. ..... On signed/sealed boundary survey .....$125.00 For planning/zoning applications .....$285.00 (7) Underground utility installation .....$295.00 (8) Underground utility service connection, utility structure placement .....$95.00 (9) Monitoring wells, soil borings, coring/sampling, utility locates, minor non-utility excavations .....$420.00 (10) Building construction/maintenance (scaffolding, crane, dumpster) .....$265.00 (11) Interim parkin .....$650.00 (12) Right-of-way closure (temporary traffic control, temporary construction fence) .....$75.00 (13) As-built plan. ..... a. Stormwater .....$750.00 b. Line and grade, pavement, sidewalk, curb, and gutter .....$480.00 c. Underground utilities .....$800.00 d. Above ground utilities .....$430.00 e. Non-standard improvements (pavers, lighting, irrigation, tree grates, etc.) .....$430.00 (14) Dry run plan. ..... a. Stormwater .....$585.00 b. Line and grade, pavement, sidewalk, curb, and gutter .....$585.00 c. Underground utilities .....$585.00 d. Aboveground utilities .....$430.00 e. Non-standard improvements (pavers, lighting, irrigation, tree grates, etc.)$355.00 ..... (b) The fees to be charged by the department of resilience and public works for processing and reviewing plans for work in the right-of-way that is not related to a private development submitted for approval of the city are hereby fixed as follows: (1) Underground utility installation .....$295.00 (2) Underground utility service connection, utility structure placement .....$75.00 (3) Monitoring wells, soil borings, coring/sampling, utility locates, minor non-utility excavations .....$350.00 (4) Street construction (sidewalk repair, sidewalk construction, curb and gutter, roadway paving, roadway resurfacing) .....$225.00 (5) Building construction/maintenance (scaffolding, crane, dumpster) .....$225.00 (6) Right-of-way closure (temporary traffic control, temporary construction fence) .....$105.00 (7) As-built plan. ..... a. Stormwater .....$750.00 b. Line and grade, pavement, sidewalk, curb, and gutter .....$480.00 c. Underground utilities .....$800.00 d. Aboveground utilities .....$430.00 e. Non-standard improvements (pavers, lighting, irrigation, tree grates, etc.) .....$430.00 (8) Dry run plan. ..... a. Stormwater .....$585.00 b. Line and grade, pavement, sidewalk, curb, and gutter .....$585.00 c. Underground utilities .....$585.00 d. Aboveground utilities .....$430.00 e. Non-standard improvements (pavers, lighting, irrigation, tree grates, etc.) .....$355.00 (c) Expedited plan review service for special projects. A "special project" is defined as a project having a development order, or any other project as determined by the city manager, or designee, as having special interest to the city. The services will cover the resilience and public works department expedited review and shall be in addition to any and all other applicable permit fees. Outside source review will be the preferred method. Outside source review fee: Actual cost plus 15 percent* *Fifteen percent is the administrative fee to cover the cost of processing. In-house review fee not to exceed four hours: $350.00 (d) Trip generation statement fee pursuant to comprehensive plan policy. Policy TR-1.3.3: $1,350.00 (e) The administrative fee in connection with the administration of the independent traffic studies shall be in the amount of 15 percent of the estimated expenses for the services of the provider set to perform the independent study. The nonrefundable administrative fee is in addition to and shall be paid separately from expenses for the services of the provider and will be due at time of contract execution with the independent traffic engineering study provider. (f) The fee required under this section may be waived by the city manager for governmental entities and agencies.

(Ord. No. 10658, § 1, 10-12-89; Code 1980, § 2-102; Ord. No. 12642, § 1, 1-13-05; Ord. No. 13142, § 2, 2-11-10; Ord. No. 13195, § 2, 9-27-10; Ord. No. 13792, § 1, 10-11-18; Ord. No. 13798, § 2, 10-25-18; Ord. No. 13915, § 2, 9-24-20; Ord. No. 14139, § 2, 2-9-23; Ord. No. 14433, § 2, 1-8-26)

Ask a question about Miami law

Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.