§ 10-7 — Submittal documents
Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026) · Miami City Code § 10-7
Corpus is an independent public-information project, not the official City of Miami website. Stable reference: corpuslaw.us/code/d3f22b70-96f5-4286-a8cc-2d166cc3cde5
Sec. 10-7. - Submittal documents.
Submittal documents consisting of construction documents, statement of Special Inspections, geotechnical report and other data shall be submitted in two or more sets with each Permit application. The construction documents shall be prepared by a registered design professional where required by Chapter 471, Florida Statutes & 61G15 Florida Administrative Code or Chapter 481, Florida Statutes and 61G1 Florida Administrative Code. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional. Exception: The Building Official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with this Code. Permits issued under the City of Miami's Easy Permit Program do not require review of plans. a. Construction documents. Construction documents shall be in accordance with Sections 107.2.1 through 107.2.6 of this Section. 1. Information on construction documents. Construction documents shall be dimensioned and drawn upon suitable material. Electronic media documents are permitted to be submitted where approved by the Building Official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this Code and relevant laws, ordinances, rules and regulations, as determined by the Building Official. Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the technical Codes. Such information shall be specific, and the technical Codes shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design. 2. Fire protection system shop drawings. Shop drawings for the fire protection system(s) shall be submitted to indicate conformance to this Code and the construction documents and shall be approved prior to the start of system installation. Shop drawings shall contain all information as required by the referenced installation standards in Chapter 9, Florida Building Code. 3. Means of egress. The construction documents shall show in sufficient detail the location, construction, size and character of all portions of the means of egress including the path of the exit discharge to the public way in compliance with the provisions of this Code. In other than occupancies in Transect Zones T3, T4, and Industrial, the construction documents shall designate the number of occupants to be accommodated on every floor, and in all rooms and spaces. 4. Exterior wall envelope. Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with this Code. The construction documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane and details around openings. The construction documents shall include manufacturer's installation instructions that provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall envelope. The supporting documentation shall fully describe the exterior wall system that was tested, where applicable, as well as the test procedure used. 5. Exterior balcony and elevated walking surfaces. Where balcony or other elevated walking surfaces are exposed to water from direct or blowing rain or irrigation, and the structural framing is protected by an impervious moisture barrier, the construction documents shall include details for all elements of the impervious moisture barrier system. The construction documents shall include manufacturer's installation instructions. 6. Site plan. The construction documents submitted with the application for Permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The Building Official is authorized to waive or modify the requirement for a site plan where the application for Permit is for alteration or repair or where otherwise warranted. A. Design flood elevations. Where design flood elevations are not specified, they shall be established in accordance with Section 1612.3.1, Florida Building Code. B. For the purpose of inspection and record retention, site plans for a building may be maintained in the form of an electronic copy at the worksite. These plans must be open to inspection by the Building Official or a duly authorized representative, as required by the Florida Building Code. 7. Structural information. The construction documents shall provide the information specified in Section 1603, Florida Building Code. b. Examination of documents. The Building Official shall examine or cause to be examined the accompanying submittal documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this Code and other pertinent laws or ordinances. Exceptions: Building plans approved pursuant to Section 553.77(5), Florida Statutes, and state-approved manufactured buildings are exempt from local Codes enforcing agency plan reviews except for provisions of the Code relating to erection, assembly or construction at the site. Erection, assembly and construction at the site are subject to local permitting and inspections. Photocopies of plans approved according to Rule 61-41.009, Florida Administrative Code, shall be sufficient for local Permit application documents of record for the modular building portion of the Permit project. Industrial construction on sites where design, construction and fire safety are supervised by appropriately licensed design and inspection professionals and which contain adequate in-house fire departments and rescue squad are exempt, subject to approval by the Building Official, from review of plans and inspections, providing the appropriate licensed design and inspection professionals certify that applicable Codes and standards have been met and supply appropriate approved drawings to local building and fire-safety inspectors. 1. Approval of construction documents. When the Building Official issues a Permit, the construction documents shall be approved, in writing or by stamp, as "Reviewed for Code Compliance." One set of construction documents reviewed shall be retained by the Building Official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the Building Official or a duly authorized representative. 2. Previous approvals. This Code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful Permit has been heretofore issued or otherwise law- fully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this Code and has not been abandoned. 3. Phased approval. The Building Official is authorized to issue a Permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of this Code. Design professionals willfully signing and sealing incomplete, underdeveloped and/or uncoordinated construction documents as a means to circumvent the traditional Permit process, and expedite their project may be subject to referral to their respective professional board. The holder of such Permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a Permit for the entire structure will be granted. Permits issued in this manner shall be administered through the City of Miami's Phased Permit Program and are issued at the sole discretion of the Building Official. Pursuant to Section 10-5 of the City Code, Phased Permits shall expire in 180 days. The Building Official is authorized to establish and modify administrative policies and procedures for the Phased Permit Program at any time. 4. Design professional in responsible charge. Where it is required that documents be prepared by a registered design professional, the Building Official shall be authorized to require the owner or the owner's authorized agent to engage and designate on the building Permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner or the owner's authorized agent shall designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The Building Official shall be notified in writing by the owner or owner's authorized agent if the registered design professional in responsible charge is changed or is unable to continue to perform the duties. Successor registered design professional in responsible charge licensed under Chapter 471 Florida Statutes shall comply with Section 471.025(4) Florida Statute and the procedure set forth in 61G15-27.001 Florida Administrative Code; or licensed under Chapter 481 Florida Statutes shall comply with Section 481.221(6) Florida Statute and the procedure set forth in 61G1-18.002 Florida Administrative Code. Such written notification shall be in accordance with procedures established by the Building Official. The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building. A. Deferred submittals. For the purposes of this Section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the Building Official. Deferral of any submittal items shall have the prior approval of the Building Official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the Building Official. Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and found to be in general conformance to the design of the building. The use of "Reviewed" or similar notation without qualifying language to indicate that the drawings were found to be in general conformance to the design of the building shall not be accepted. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by the Building Official and all respective Permits have been issued. B. Certifications by Contractors authorized under the provisions of Section 489.115(4)(b), Florida Statutes, shall be considered equivalent to sealed plans and specifications by a person licensed under Chapter 471, Florida Statutes, or Chapter 481, Florida Statutes, by local enforcement agencies for plans review for permitting purposes relating to compliance with the wind-resistance provisions of the Code or alternate methodologies approved by the Florida Building Commission for one- and two-family dwellings. Local enforcement agencies may rely upon such certification by Contractors that the plans and specifications submitted conform to the requirements of the Code for wind resistance. Upon good cause shown, local government code enforcement agencies may accept or reject plans sealed by persons licensed under Chapters 471, 481 or 489, Florida Statutes. 5. Minimum plan review criteria for buildings. The examination of the documents by the Building Official shall include the following minimum criteria and documents: a floor plan; site plan; foundation plan; floor/roof framing plan or truss layout; all fenestration and building envelope penetrations; flashing; and rough opening dimensions; and all exterior elevations: Commercial Buildings: A. Building: 1. Site requirements: Parking Fire access Vehicle loading Driving/turning radius Fire hydrant/water supply/post indicator valve (PIV) Set back/separation (assumed property lines) Location of specific tanks, water lines and sewer lines Flood hazard areas, flood zones, and design flood elevations 2. Occupancy group and special occupancy requirements shall be determined (with cross check with the energy code submittal). 3. Minimum type of construction shall be determined (see Table 503, FBC). 4. Fire-resistant construction requirements shall include the following Components: Fire-resistant separations Fire-resistant protection for type of construction Protection of openings and penetrations of rated walls Fireblocking and draftstopping and calculated fire resistance 5. Fire suppression systems shall include: Early warning smoke evacuation systems Schematic fire sprinklers Standpipes Pre-engineered systems Riser diagram. 6. Life safety systems shall be determined and shall include the following requirements: Occupant load and egress capacities Early warning Smoke control Stair pressurization Systems schematic 7. Occupancy load/egress requirements shall include: Occupancy load Gross Net Means of egress Exit access Exit Exit discharge Stairs construction/geometry and protection Doors Emergency lighting and exit signs Specific occupancy requirements Construction requirements Horizontal exits/exit passageways 8. Structural requirements shall include: Soil conditions/analysis Termite protection Design loads Wind requirements Building envelope compliance statement Impact resistant coverings or systems Structural calculations (if required) Foundation Flood requirements in accordance with Section 1612, including lowest floor elevations, enclosures, flood damage- resistant materials Wall systems Floor systems Roof systems Threshold inspection plan (if required) Special Inspector request form Stair systems 9. Materials shall be reviewed and shall at a minimum include the following: Wood Steel Aluminum Concrete Plastic Glass Masonry Gypsum board and plaster Insulating (mechanical) Roofing Insulation Building envelope portions of the Energy Code (including calculation and mandatory requirements) 10. Accessibility requirements shall include the following: Site requirements Accessible route Vertical accessibility Toilet and bathing facilities Drinking fountains Equipment Special occupancy requirements Fair housing requirements Interior requirements shall include the following: Interior finishes (flame spread/smoke development) Light and ventilation (including corresponding portion of the energy Code) Sanitation 11. Special systems: Elevators Escalators Lifts 12. Swimming pools: Barrier requirements Spas Wading pools 13. Location and installation details. The specific location and installation details of each fire door, fire damper, ceiling damper and smoke damper shall be shown and properly identified on the building plans by the designer. 14. Miscellaneous drainage: balconies, decks B. Electrical: 1. Electrical: Wiring Services Feeders and branch circuits Overcurrent protection Grounding Wiring methods and materials GFCIs Electrical portions of the Energy Code (including calculation and mandatory requirements) 2. Equipment 3. Special occupancies 4. Emergency systems 5. Communication systems 6. Low voltage 7. Load calculations 8. Design flood elevation C. Plumbing: 1. Minimum plumbing facilities 2. Fixture requirements 3. Water supply piping 4. Sanitary drainage 5. Water heaters 6. Vents 7. Roof drainage 8. Back flow prevention 9. Irrigation 10. Location of water supply line 11. Grease traps 12. Environmental requirements 13. Plumbing riser 14. Design flood elevation 15. Water/plumbing portions of the Energy Code (including calculation and mandatory requirements) D. Mechanical: 1. Mechanical portions of the Energy calculations 2. Exhaust systems: clothes dryer exhaust, kitchen equipment exhaust, specialty exhaust systems 3. Equipment 4. Equipment location 5. Make-up air 6. Roof-mounted equipment 7. Duct systems 8. Ventilation 9. Combustion air 10. Chimneys, fireplaces and vents 11. Appliances 12. Boilers 13. Refrigeration 14. Bathroom ventilation 15. Laboratory 16. Design flood elevation 17. Smoke and/or Fire Dampers E. Gas: 1. Gas piping 2. Venting 3. Combustion air 4. Chimneys and vents 5. Appliances 6. Type of gas 7. Fireplaces 8. LP tank location 9. Riser diagram/shutoffs 10. Design flood elevation 11. Gas portions of the Energy Code (including calculation and mandatory requirements) F. Demolition: Asbestos removal G. Residential (one- and two-family): 1. Site requirements: Set back/separation (assumed property lines) Location of septic tanks 2. Fire-resistant construction (if required) 3. Fire 4. Smoke and/or carbon monoxide alarm/detector locations 5. Egress: egress window size and location, stairs construction requirements 6. Structural requirements shall include: Wall Section from foundation through roof, including assembly and materials connector tables wind requirements structural calculations (if required) Termite protection Design loads Wind requirements Building envelope Foundation Wall systems Floor systems Roof systems Flood hazard areas, flood zones, design flood elevations, lowest floor elevations, enclosures, equipment, and flood damage- resistant materials 7. Accessibility requirements: show/identify accessible bath 8. Impact resistant coverings or systems 9. Residential Energy Code submittal (including calculation and mandatory requirements) H. Manufactured buildings/housing: 1. Site plan requirements: Setback/separation (assumed property lines) Location of septic tanks (if applicable) ADA accessibility features Location of water source and supply line Location of sanitary sewer line Location of electric utility power in relation to service point connection 2. Structural: Manufacturer's (DCA) certification letter Wind zone Anchoring. Blocking 3. Plumbing: List potable water source and meter size (if applicable) 4. Mechanical: Exhaust systems Clothes dryer exhaust Kitchen equipment exhaust 5. Electrical: Exterior disconnect location I. Exemptions: Plans examination by the Building Official shall not be required for the following work: 1. Replacing existing equipment such as mechanical units, water heaters, etc. 2. Minor electrical, plumbing and mechanical repairs for one- and two-family dwellings 3. Annual maintenance Permits 4. Prototype plans: except for local site adaptations, siding, foundations and/or modifications and except for structures that require waiver. 5. Manufactured buildings plan except for foundations and modifications of buildings on site and as listed above in manufactured buildings/housing. 6. Permits issued under the City of Miami's Easy Permit Program do not require review of plans. 7. Scope of work statement. Plans for new construction, additions, and alterations exceeding $25,000 construction cost or as required by the Building Official, shall include a detailed scope of work statement positioned prominently on the drawings, reflecting the work for each trade. The statement shall be in narrative form, or a combination of tabular form and narrative, and shall describe, in detail, the major Components of the proposed work. The Building Official shall be entitled to rely on the accuracy and completeness of the statement and shall compare it to the plans as part of the plan review criteria. 8. Labeling of documents. To provide consistency across all drawings submitted to the Local Enforcement Agency, drawings shall be labeled in accordance with the following standards: A. Drawings shall not be labeled "Not For Construction" or with any other phrase conveying the same meaning. B. Drawings shall not be labeled "For Reference Only" unless they are intended for one of the following purposes: i. To serve as a key plan, identifying the location of the proposed work within the site. ii. To provide contextual information, such as relating a shop drawing to a master plan. iii. To indicate that a portion of the proposed work was previously approved. 9. Design professional's response narrative. Upon examination and disapproval of the plans and/or documents, the Building Official may require from the design professional in responsible charge a written response to address each specific reason for the disapproval. This itemized, written response shall be submitted signed, sealed and dated by the professional on the professional's official stationery. Failure to submit the response narrative, if required to do so, will be cause for a subsequent rejection of the plans. Replies submitted by anyone through or within the City of Miami's electronic plan review platform shall not be a substitute for this requirement. c. Amended construction documents. Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in conformance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. Should such changes to the approved construction documents be found to be in violation of the Florida Building Code or any federal, state, or local regulations, the work depicted by said changes shall be removed. d. Retention of construction documents. One set of approved construction documents shall be retained by the Building Official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws. e. Affidavits. The Building Official may accept a sworn affidavit from a registered architect or engineer stating that the plans submitted conform to the technical codes. For buildings and structures, the affidavit shall state that the plans conform to the laws as to egress, type of construction and general arrangement and, if accompanied by drawings, show the structural design and that the plans and design conform to the requirements of the technical codes as to strength, stresses, strains, loads and stability. The Building Official may without any examination or inspection accept such affidavit, provided the architect or engineer who made such affidavit agrees to submit to the Building Official copies of inspection reports as inspections are performed and upon completion of the structure, electrical, gas, mechanical or plumbing systems a certification that the structure, electrical, gas, mechanical or plumbing system has been erected in accordance with the requirements of the technical codes. Where the Building Official relies upon such affidavit, the architect or engineer shall assume full responsibility for compliance with all provisions of the technical codes and other pertinent laws or ordinances. The Building Official shall ensure that any person conducting plans review is qualified as a plans examiner under Part XII of Chapter 468, Florida Statutes, and that any person conducting inspections is qualified as a building inspector under Part XII of Chapter 468, Florida Statutes. 1. Building Permits issued in flood hazard areas on the basis of an affidavit. Pursuant to the requirements of federal regulation for participation in the National Flood Insurance Program (44 C.F.R. Parts 59 and 60), the authority granted to the Building Official to issue Permits, to rely on inspections, and to accept plans and construction documents on the basis of affidavits and plans submitted pursuant to Sections 105.14 and 107.6, shall not extend to the flood load and flood-resistance construction requirements of the Florida Building Code. f. If the local Building Official or inspector finds that the plans are not in compliance with the Florida Building Code, the local Building Official or inspector shall identify the specific plan features that do not comply with the applicable Codes, identify the specific Code Chapters, Divisions and Sections upon which the finding is based, and provide this information to the local enforcing agency. If the Building Official, plans examiner, or inspector requests another local enforcing agency employee or a person contracted by the local enforcing agency to review the plans and that employee or person identifies specific plan features that do not comply with the applicable Codes, the Building Official, plans examiner, or inspector must provide this information to the local enforcing agency. The local enforcing agency shall provide this information to the Permit applicant.
(Ord. No. 14279, § 2, 5-9-24)
Ask a question about Miami law
Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.