§ 27-2 — Definitions
Code of the City of Charleston, South Carolina (Supp. No. 115: codified through Ordinance No. 2026-092, enacted May 26, 2026) · Charleston, S.C., City Code § 27-2
Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/d44bbd24-c782-41c2-bc70-0ef1d2e050fe
Sec. 27-2. - Definitions.
The following words and terms when used in this article shall have the meaning respectively ascribed to them in this section. Applicant is a person, firm, governmental agency, partnership, limited liability company, or any other entity who seeks to obtain approval under the requirements of this article and who, in addition to the property owner or operator, will be responsible for the land disturbing activity(ies) and related maintenance thereof. As-built drawings are revised construction drawings containing an attestation clause signed by an engineer or surveyor that show the installed location of the new facilities on a project, including the stormwater system. This term and "record drawings" shall be synonymous. Best management practices (BMPS) are any structural or non-structural measure or facility used for the control of stormwater runoff, be it for quantity or quality control. BMPs also include schedules of activities, prohibitions of practices, maintenance procedures, treatment requirements, operating procedures, and other management practices to control site runoff, spillage or leaks, sludge or waste disposal, drainage from raw material storage, or measures that otherwise prevent or reduce the pollutant loading of receiving waters. City shall mean the City of Charleston. Construction or construction activity is activity involving clearing, grading, transporting, filling, or any other activity which causes land to be exposed to the danger of erosion, or which might create an alteration to an existing drainage way or other component of the city's stormwater management system or facility. Development means any of the following actions undertaken by a person, a firm, a governmental agency, a partnership, a limited liability company, or any other individual or entity, without limitation: (a) Any division or subdivision of a lot, tract, parcel, or other divisions by plat or deed; (b) The construction, installation, or alteration of land, a structure, impervious surface or drainage facility; (c) Clearing, scraping, grubbing or otherwise significantly disturbing the soil, vegetation, mud, sand, or rock of a site; or (d) Adding, removing, exposing, excavating, leveling, grading, digging, burrowing, dumping, piling, dredging, or otherwise disturbing the soil, vegetation, mud, sand, or rock of a site. Erosion means the general process by which soils or rock fragments are detached and moved by the action of wind, water, ice, and gravity. Easement is an authorization by a property owner to the general public, a corporation, or a certain person or persons for the use of any designated part of his property for a specific purpose. Flood/flooding is a temporary rise in the level of water which results in the inundation of areas not ordinarily covered by water. Hazardous material is any item or agent (biological, chemical, radiological, or physical) which has the potential to cause harm to humans, other living organisms, or the environment, either by itself or through interaction with other factors. Illicit connection means a connection to a City of Charleston stormwater management system or facility which results in a discharge that is not composed entirely of stormwater runoff except discharges pursuant to an NPDES permit (other than the NPDES MS4 permit for the City of Charleston). Improper disposal means any disposal other than through an illicit connection that results in an illicit discharge, including, but not limited to the disposal of used oil and toxic materials resulting from the improper management of such substances. Illicit discharge or illegal discharge means any activity which results in a discharge to a City of Charleston stormwater management system or facility or receiving waters that is not composed entirely of stormwater except (a) discharge pursuant to an NPDES permit (other than the NPDES for the City of Charleston) and (b) discharges resulting from fire-fighting activities. Construction activity application means the set of drawings, specifications, design calculations, stormwater pollution prevention plan ("SWPPP"), and other documents necessary to demonstrate compliance with this article. Low impact development (LID) is a set of principles and design components used to manage stormwater runoff by mimicking natural conditions and limiting pollutant transport through source control. Maintenance means any action necessary to preserve stormwater system components, including conveyances, facilities, and BMPs in proper working condition, in order to serve the intended purposes set forth in this article and to prevent structural failure of such components. Maximum extent practicable (MEP): is a technology-based control standard used in the municipal stormwater program against which SCDHEC Bureau of Water and permittees assess whether or not an adequate level of control has been proposed in the Stormwater Management Program (SWMP). MEP is applied to all permits issued to municipal separate storm sewer systems, including the city's, to achieve greater cooperation and consistency, to reduce conflicts and confusion, and to improve economies of scale in the effort to manage stormwater impacts. MS4 means a municipal separate storm sewer system and includes all conveyances or system of conveyances (including roads with drainage systems, highways, rights-of-way, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, storm drains, detention ponds, and other stormwater facilities) which receives, transports, stores, or treats stormwater runoff and which is (a) owned or operated by the City of Charleston; (b) designed or used for collecting or conveying stormwater; (c) not a combined sewer system; and (d) not a part of a publicly owned treatment works (POTW). NPDES means National Pollutant Discharge Elimination System. NPDES permit means the NPDES permit for stormwater discharges issued by SCDHEC pursuant to the Clean Water Act and the federal stormwater discharge regulations (40 CFR 122.26) that allows for restricting pollutant loads as necessary to meet water quality standards. Operator means the person who is operating the property, the operator's agent, or any other person who acts in the operator's behalf. Outfall or discharge point means the point where a City of Charleston stormwater management system or facility or other municipal and private system discharges to receiving waters. Owner means the legal property owner, the owner's agent, or any other person who acts in the owner's behalf. Person means any and all persons, natural or artificial and includes any individual, association, firm, corporation, limited liability company, business trust, estate, trust, partnership, two (2) or more persons having a joint or common interest, or an agent or employee thereof, or any other legal entity. Pollutant means anything which may cause or contribute to exceedances of water quality standards, including but not limited to sediment, bacteria, nutrients, dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, soil, and industrial, municipal, and agricultural waste discharged into receiving waters. Pollutant load is a numeric value representing an estimate of the mass of a given pollutant entering a stormwater system or receiving water. Receiving waters refers to any lakes, bays, sounds, ponds, impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Atlantic Ocean within the territorial limits of the State of South Carolina, and all other bodies of surface or underground water, natural or artificial, public or private, inland or coastal, fresh or salt. Redevelopment shall mean development on a previously developed site where the impervious surface on the developed site is equal to or greater than twenty (20) percent of the total site and where any repair, reconstruction, or improvement to an existing site and/or to any structures located on that site such that the cumulative costs of repairs, over a five-year period equals or exceeds fifty (50) percent of the fair market value of the property and the structures located on that property; but excludes ordinary maintenance activities, remodeling of existing building interiors, resurfacing of paved areas, and exterior building changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution. Regulation means any regulation, rule, or requirement prepared by and/or adopted by City Council pursuant to this article. Site means the land or water area where any development is physically located or conducted including adjacent land used in connection with the development. Spill means any accidental or purposeful discharge of any pollutants, hazardous materials, or other substance which is otherwise potentially detrimental to the designated use of receiving water. SWMP means the City of Charleston's Stormwater Management Program, which shall describe the components to be used by the City of Charleston to control stormwater discharges, address flooding, and meet water quality standards. Stormwater means rainwater runoff, snowmelt runoff, surface runoff, and drainage. Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner to meet the objectives of this article and its terms, including, but not limited to, measures that control the increased volume and rate of stormwater runoff and water quality impacts caused by man-made changes to the land. Stormwater management system(s) and facility(ies) means those natural and man-made channels, swales, ditches, swamps, rivers, streams, creeks, branches, reservoirs, ponds, drainage ways, inlets, catch basins, pipes, head walls, storm sewers, lakes and other physical works, properties, and improvements which transfer, control, convey, or otherwise influence the movement of stormwater runoff, be it for quantity or quality control. Ten-year frequency storm shall mean a storm that is capable of producing rainfall expected to be equaled or exceeded on the average of once in ten (10) years. It may also be expressed as an exceedance probability with a ten-percent chance of being equaled or exceeded in any given year. Total maximum daily load (TMDL) is a regulatory value developed to represent the amount of a pollutant that receiving water can incorporate while meeting water quality standards. TMDL is further defined as the legal document developed by EPA and SCDHEC designating the pollutant load a permitted discharge is allowed to discharge into receiving water. Twenty-five-year frequency storm shall mean a storm that is capable of producing rainfall expected to be equaled or exceeded on the average of once in twenty-five (25) years. It may also be expressed as an exceedance probability with a four-percent chance of being equaled or exceeded in any given year. Two-year frequency storm shall mean a storm that is capable of producing rainfall expected to be equaled or exceeded on the average of once in two (2) years. It may also be expressed as an exceedance probability with a fifty (50) percent chance of being equaled or exceeded in any given year. Undeveloped land shall mean property not altered from its natural state by construction or installation of improvements such as roads, drainage improvements, buildings, structures, or other impervious surfaces, or which has less than twenty (20) percent of its property covered by impervious surfaces. Variance means the modification of the minimum stormwater management requirements contained in this article and the SWMP for specific circumstances where strict adherence to the requirements would result in unnecessary hardship and not fulfill the intent of this article. Watercourse is any natural or man-made conveyance used to transport runoff from one location to the next. Watershed is a drainage area or drainage basin contributing to the flow of stormwater into a watercourse or receiving water. Water quality means those characteristics of stormwater runoff that relate to the physical, chemical, biological, or radiological integrity of water. Water quantity means those characteristics of stormwater runoff that relate to the rate and volume of the stormwater runoff.
(Ord. No. 2007-158, § 2, 8-21-07; Ord. No. 2017-110, § 1, 9-13-17)
Ask a question about Charleston law
Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
