Sec. 29-40. - Management practices.
The following practices may be used on approval by the department of planning and development.
(1) Storage. Runoff may be stored in temporary or permanent detention basins, or through rooftop, parking lot ponding, or percolation storage, or by other means in accordance with the design criteria and performance standards set forth in this chapter.
(2) Open channels. Maximum feasible use shall be made of existing drainageways, open channels and drainage swales that are designed and coordinated with the design of building lots and streets in accordance with the design criteria and performance standards set forth in the drainage manual.
(3) Curbs. Streets, curbs and gutters shall be an integral part of the stormwater runoff management system. To the maximum extent possible, drainage systems, street layout and grades, plotting patterns and the location of curbs, inlets and site drainage and overflow swales shall be concurrently designed in accordance with design criteria and performance standards set forth in the drainage manual.
(4) Enclosed conveyance systems. Enclosed conveyance systems consisting of inlets, conduits and manholes may be used to convey stormwater runoff. Where used, such systems must be designed and performance standards set forth in the drainage manual.
(5) Other practices. The stormwater runoff management practices enumerated herein shall not constitute an exclusive listing of available management practices. Other generally accepted practices and methods may be approved by the department of planning and development, if the purposes, design criteria and minimum performance standards of this chapter are complied with.
(Code 1961, § 35A-44; Ord. No. 17,697, § 1a, b, 3-17-98; Ord. No. 21,867, § 1, 5-19-20)