For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.243.060 — Required Information

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.243.060

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/d4edcf67-7a47-4a24-bcd8-d456eaff48fd

33.243.060 Required Information

All applications for helicopter landing facilities must include the following information in addition to the application requirements of 33.730.060. A. Site plan. A detailed site plan of the project showing the layout of the aircraft landing and parking spaces, fire suppression equipment and access, auto parking areas, fences, landscaping, lights, walkways, adjacent streets and other details which relate to the development standards listed in 33.243.040 above. B. Flight paths. An approach/departure flight path site plan showing proposed flight path locations, widths, lengths, slopes and other necessary details, as required by the State of Oregon. C. Relation to flight corridors. The relationship of the site to natural flight corridors, such as freeways and industrial areas. D. Operation of HLF. The operational information, such as the proposed hours of operation; the number, type and size of aircraft to be located at or expected to use the site; maximum number of helicopter trips on a daily, weekly, and annual basis; and the purpose of the helicopter trips and any resulting public benefits. E. State approval. A copy of the State of Oregon Aeronautics Division provisional heliport approval, identifying and approving the following: direction, angles, and number of approaches; helipad size and surface; nearby obstructions; lighting and markings; tie- downs; number of trips; location; and fencing. F. FAA notice. A copy of FAA Form 7480-1, "Notice of Landing Area Proposal," and evidence that it has been filed with the FAA. G. Acoustical report and noise mitigation plan. An acoustical report and a noise mitigation plan approved by PP&D or the City Noise Review Board. The plan must include a discussion of preferred approach/departure flight paths, preferred approach/departure path slopes, preferred approach/departure air speeds, preferred times of use, and other relevant factors. In addition, the plan must include a discussion of the existing physical factors, such as topography and proposed physical barriers, such as walls, fences, structures or vegetation, and how these factors would be used to reduce noise impacts. If the proposal cannot meet the regulations of Title 18, the applicant must request and obtain a noise variance from the City Noise Review Board. H. Airport Noise Impact Boundary Analysis. A copy of the applicant's Airport Noise Impact Boundary Analysis and comments as provided by the State of Oregon Department of Environmental Quality review. I. Consolidations. Discussion on the feasibility of consolidating the proposed facility with other nearby facilities.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.