Sec. 10-10. - Inspections.
a. In General. Construction or work for which a Permit is required shall be subject to inspection by the Building Official and such construction or work shall remain exposed and provided with access for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this Code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this Code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain exposed and provided with access for inspection purposes. The Building Official shall be permitted to require a boundary line survey prepared by a Florida licensed professional surveyor and mapper whenever the boundary lines cannot be readily determined in the field. Neither the Building Official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. 1. Manufacturers and fabricators. When deemed necessary by the Building Official, they shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the technical codes. 2. Preliminary inspection. Before issuing a Permit, the Building Official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed. b. Pre-construction meeting. The Building Official may require a pre-construction meeting as a pre-requisite to the issuance of a Permit for any building or project, at their discretion. The Permit shall not be issued until this requirement has been satisfied. The time and location of the meeting shall be established by the Building Official, and shall include, at a minimum, the design professionals in responsible charge, the qualifying general Contractor, qualifying subContractors, the owner or their corporate representatives, and if applicable, Private Providers performing inspections under Section 553.791, Florida Statutes, and the threshold building inspector. If authorized in advance by the Building Official. The above-mentioned attendees may be substituted with approved surrogates. The purpose of the pre-construction meeting is to: 1. Establish a clear understanding of the duties and responsibilities of all parties. 2. Review the Building Official's performance expectations for the project. 3. Formally review the department's inspections scheduling procedures. 4. Explain and reinforce department guidelines for Special Inspectors and Private Providers. 5. Discuss other matters as appropriate. c. Required inspections. The Building Official upon notification from the Permit holder or their agent shall make the following inspections, or any other such inspection as deemed necessary and shall either release that portion of the construction or shall notify the Permit holder or their agent of any violations which must be corrected in order to comply with the technical Codes. The Building Official shall determine the timing and sequencing of when inspections occur and what elements are inspected at each inspection. Under no conditions can an inspection occur without a valid Permit in place for the work or Components of work to be inspected. It is the responsibility of the approved inspection agency to ensure compliance. d. Building 1. Foundation inspection. To be made after trenches are excavated, any required reinforcing steel is in place, forms erected and shall at a minimum include the following building Components: A. Stem-wall B. Monolithic slab-on-grade C. Piling/pile caps D. Footers/grade beams i Slab Inspection: Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. ii A foundation/form board survey prepared and certified by a Florida licensed professional surveyor and mapper may be required, prior to approval of the slab inspection. The survey shall certify placement of the building on the site, illustrate all surrounding setback dimensions and shall be available at the job site for review by the building inspector. In lieu of providing a survey, the Contractor may elect to uncover all property line markers and string-up all property lines in preparation for inspection. iii. In flood hazard areas, upon placement of the lowest floor, including basement, and prior to further vertical construction, the elevation certification shall be submitted to the authority having jurisdiction. 2. Framing inspection. To be made after the roof, all framing, fireblocking and bracing is in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved and shall at a minimum include the following building Components: A. Window/door framing B. Window U-factor/SHGC (as indicated on approved energy calculations) C. Vertical cells/columns D. Lintel/tie beams E. Framing/trusses/bracing/connectors (including truss layout and engineered drawings F. Draftstopping/fireblocking G. Curtain wall framing H. Energy insulation (Insulation R-factor as indicated on approved energy calculations) I. Accessibility J. Verify rough opening dimensions are within tolerances. K. Window/door buck attachment i. Insulation Inspection: To be made after the framing inspection is approved and the insulation is in place, according to approved energy calculation submittal. Includes wall and ceiling insulation. ii. Lath and gypsum board inspection for fire-resistance rated or shear assemblies. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before ant plastering is applied or gypsum board joints and fasteners are taped and finished. 3. Sheathing inspection. To be made either as part of a dry-in inspection or done separately at the request of the Contractor after all roof and wall sheathing and fasteners are complete and shall at a minimum include the following building Components: A. Roof sheathing B. Wall sheathing C. Continuous air barrier D. Exterior siding/cladding E. Sheathing fasteners F. Roof/wall dry-in NOTE: Sheathing fasteners installed and found to be missing the structural member (shiners) shall be removed and properly reinstalled prior to installation of the dry-in material. 4. Exterior wall coverings. Shall at a minimum include the following building Components in progress inspections: A. Exterior wall coverings and veneers B. Soffit coverings 5. Roofing inspection. Shall at a minimum be made in at least two inspections and include the following building Components: A. Dry-in B. Insulation C. Roof coverings (including In Progress as necessary) D. Insulation on roof deck (according to submitted energy calculation) 6. Flashing A. Re-roof sheathing inspection. An affidavit with a notarized signature of a state or locally licensed roofing Contractor for the installation of additional sheathing fasteners as required by the Existing Building Code may be accepted at the discretion of the Building Official. 7. Final inspection. To be made after the building is completed and ready for occupancy. In flood hazard areas, as part of the final inspection, a final certification of the lowest floor elevation or the elevation to which a building is dry floodproofed, as applicable, shall be submitted to the authority having jurisdiction. 8. Swimming pool inspection. First inspection to be made after excavation and installation of reinforcing steel, bonding and main drain and prior to placing of concrete. A. Steel reinforcement inspection B. Underground electric inspection C. Underground piping inspection including a pressure test. D. Underground electric inspection under deck area (including the equipotential bonding) E. Underground piping inspection under deck area F. Deck inspection: to be made prior to installation of the deck material (with forms, deck drains, and any reinforcement in place. G. Safety Inspection; Made prior to filling the pool with the bonding connections made, the proper drain covers installed and the final barriers installed. H. Final pool piping I. Final Electrical inspection J. Final inspection to be made when the swimming pool is complete and all required enclosure requirements are in place. In order to pass final inspection and receive a certificate of completion, a residential swimming pool must meet the requirements relating to pool safety features as described in Section 454.2.17, Florida Building Code. 9. Demolition inspections. First inspection to be made after all utility connections have been dis-connected and secured in such manner that no unsafe or unsanitary conditions shall exist during or after demolition operations. Final inspection to be made after all demolition work is completed. 10. Manufactured building inspections. The building department shall inspect construction of foundations; connecting buildings to foundations; installation of parts identified on plans as site installed items, joining the modules, including utility cross- overs; utility connections from the building to utility lines on site; and any other work done on site which requires compliance with the Florida Building Code. Additional inspections may be required for public educational facilities (see Section 453.27.20 of this Code). 11. Where impact-resistant coverings or impact-resistant systems are installed, the Building Official shall schedule adequate inspections of impact- resistant coverings or impact-resistant systems to determine the following: A. The system indicated on the plans was installed. B. The system is installed in accordance with the manufacturer's installation instructions and the product approval. e. Electrical 1. Underground inspection. To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. 2. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing is in place and prior to the installation of wall or ceiling membranes. 3. Final inspection. To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy. 4. Existing Swimming Pools. To be made after all repairs or alterations are complete, all required electrical equipment, GFCI protection, and equipotential bonding are in place on said alterations or repairs. f. Plumbing 1. Underground inspection. To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. 2. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping is complete, and prior to this installation of wall or ceiling membranes. Includes plumbing provisions of the energy Code and approved energy calculation provisions. 3. Final inspection. To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. Note: See Section 312 of the Florida Building Code, Plumbing for required tests. g. Mechanical 1. Underground inspection. To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. 2. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing are in place and all ducting, and other concealed Components are complete, and prior to the installation of wall or ceiling membranes. Includes mechanical provisions of the energy code and approved energy calculation provisions. 3. Final inspection. To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. h. Gas 1. Rough piping inspection. To be made after all new piping authorized by the Permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. Includes gas provisions of the energy Code and approved energy calculation provisions. 2. Final piping inspection. To be made after all piping authorized by the Permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. 3. Final inspection. To be made on all new gas work authorized by the Permit and such portions of existing systems as may be affected by new work or any changes, to ensure compliance with all the requirements of this Code and to assure that the installation and construction of the gas system is in accordance with reviewed plans. i. Site Debris: The Contractor and/or owner of any active or inactive construction project shall be responsible for the clean-up and removal of all construction debris or any other miscellaneous discarded articles during the course of the construction project and prior to receiving final inspection approval. Construction job sites must be kept clean and in a safe condition at all times; including, but not limited to, the proper storage and removal of human excreta as defined under Chapter 49 of the City Code. Any violation thereof may result in the issuance of a Stop Work Order or denial of the issuance of a Certificate of Completion or Temporary Certificate of Completion. All debris shall be kept in such a manner as to prevent it from being spread by any means. j. Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job site, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job. k. Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. l. Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in Section 1612.4, Florida Building Code and Section R322 of the Florida Building Code, Residential, shall be submitted to the Building Official. m. Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fireblocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved. n. Lath, gypsum board and gypsum panel product inspection. Lath, gypsum board and gypsum panel product inspections shall be made after lathing, gypsum board and gypsum panel products, interior and exterior, are in place, but before any plastering is applied or gypsum board and gypsum panel product joints and fasteners are taped and finished. Exception: Gypsum board and gypsum panel products that are not part of a fire-resistance-rated assembly or a shear assembly. o. Weather-exposed balcony and walking surface waterproofing. Where balcony or other elevated walking surfaces are exposed to water from direct or blowing rain, or irrigation, and the structural framing is protected by an impervious moisture barrier, all elements of the impervious-moisture-barrier system shall not be concealed until inspected and approved. p. Fire and smoke-resistant penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies, smoke barriers and smoke partitions shall not be concealed from view until inspected and approved. q. Energy efficiency inspections. Inspections shall be made to determine compliance with FBC, Energy Conservation and confirm with the approved energy code submittal (by appropriate trade) and corresponding mandatory requirements and shall include, but not be limited to, inspections for: corresponding envelope insulation R- and U-values, fenestration U-value, and Solar Heat Gain Coefficient, duct system R-value, and HVAC, lighting, electrical and water-heating equipment efficiency. r. Other inspections. In addition to the inspections specified in Sections 110.3 through 110.3.8, Florida Building Code or Sections 10-10(j) through (q) of this Code, the Building Official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this Code and other laws that are enforced by the Department. s. Special Inspections. For the purpose of this Section, a Special Inspection is defined as the inspection of construction requiring the expertise of an approved Special Inspector in order to ensure compliance with this Code and the approved construction documents. Special Inspections fall into two categories: 1. Continuous Special Inspection, for which the Special Inspector must be present continuously when and where the work to be inspected is being performed. 2. Periodic Special Inspection, for which the Special Inspector may be intermittently present where the work to be inspected has been or is being performed. The nature of the work inspected shall dictate the method of inspection to be performed by the Special Inspector. 3. Special Inspector: A Florida-registered architect or engineer retained by the owner to provide professional services consisting of observation and inspection of construction for conformance with the Permit documents and the Florida Building Code. 4. The Building Official shall require Special Inspections for the following: A. The compaction of fill under slabs on grade. B. The installation of structural piles. C. The construction of reinforced masonry structures. D. Welding and high-strength bolting. E. The fabrication and installation of curtain wall systems on threshold buildings. F. The fabrication and installation of structural glazed panels. G. Hoisting, erection and bracing of trusses over 35 feet in length or 6 feet in height. H. Structural inspections on threshold buildings pursuant to Section 110.8, Florida Building Code or Section 10-10(20) of this Code. 5. When one or more of the following conditions exist the Building Official is authorized to require a Special Inspector for the inspection of the exterior cladding, firestopping, railings and safeguards, framing, roofing or any part of the building, except that inspections of plumbing, electrical or mechanical systems, inspections of required features of handicap accessibility and final inspections shall not be performed by a Special Inspector: A. The building is of unusual size or height, or B. The method of design or construction is unusual or complex, or C. The method or pace of the construction requires continuous inspection, or the construction item to be inspected requires specialized expertise, or D. In the opinion of the Building Official, additional inspections are required in order to ensure compliance with the Florida Building Code. 6. Prior to issuance of the Permit and for cases governed by this Section above, the Building Official shall require that each Special Inspector be certified by the Miami-Dade County Board of Rules and Appeals as a Special Inspector in compliance with Section 8-4 of the Miami-Dade County Code. Such Special Inspector(s) shall be a Florida-registered architect or engineer and shall be qualified by training and experience to perform the inspections for which they will be retained. Any and all inspections required and authorized to be performed by a Special Inspector pursuant to this Section shall be performed by persons who shall have the knowledge, expertise, and if required the appropriate licensing board's certification related to the specialty or discipline involved in the inspection. 7. The Building Official shall specify the scope and nature of the inspections to be performed or shall require that the Architect or Engineer of Record submit an inspection plan for approval. The Special Inspector or their duly authorized representative shall make all inspections in accordance with the approved inspection plan. 8. The Building Official shall be promptly informed of the results of all inspections in reports signed by the Special Inspector(s). Prior to the issuance of a Certificate of Occupancy, each Special Inspector shall submit to the Building Official a statement indicating the scope of his inspections and attesting that, to the best of his knowledge, belief and professional judgment, the work is in substantial compliance with the Permit documents. 9. Special Inspectors shall be responsible to the Building Official. The Building Official shall periodically visit the construction site to monitor, review, evaluate and approve the work of the Special Inspector(s). The Building Official is empowered to direct, as necessary, the work of the Special Inspector(s) and may, at any time, remove a Special Inspector for failure to perform their duties in accordance with the provisions of this Section. In that event, the Building Official may also require or Permit the owner, within such time as the Building Official may reasonably establish, to employ an alternate Special Inspector. 10. The Building Official may conduct mandatory inspections as required herein through a Special Inspector subject to the limitations given in Section 110.3.10, Florida Building Code. 11. Duties and responsibilities. The Special Inspector shall not perform inspections for any work, or any component of the work, that does not have a valid Permit. If unpermitted construction is discovered, the Special Inspector shall notify the Building Official immediately as a matter of public safety, and inspection services shall cease until the proper Permits have been acquired. Any Special Inspector knowingly conducting inspections on projects without the requisite Permits may be referred to their respective professional board for disciplinary review in accordance with Section 553.79, Florida Statutes. Any safety issues shall immediately be reported to the Building Official, and any other enforcement agency having jurisdiction over the matter. 12. Inspection documents. The Special Inspector shall maintain at the job site a complete record of all inspections performed and shall make it available at all times for review by the Building Official. The collective record of inspections shall be known as the inspection log. A. Inspection reports shall be legible and shall clearly identify, in detail, the exact areas and/or items inspected. B. Each individual inspection report shall be signed by the person who performed the inspection. Example: If the Special Inspector performs the inspection, then they must sign the report. If the Special Inspector's duly authorized representative performs the inspection, then they shall be the party to sign the inspection report, but the Special Inspector may also co-sign the document at their discretion. C. The inspection log shall be maintained in good condition, in one or more binders, and shall be organized by date and separated by trade. Individual reports must be numbered sequentially or otherwise labeled to follow a chronological order. As the construction progresses, and upon completion of the project, the Building Official shall be able to determine from the inspection log itself that all areas and/or Components of the project that were completed have been inspected and approved. 13. Final inspection. The final inspection shall be made after all work required by the building Permit is completed. A. Flood hazard documentation. If located in a flood hazard area, documentation of the elevation of the lowest floor as required in Section 1612.5, Florida Building Code and Section R322 of the Florida Building Code, Residential, shall be submitted to the Building Official prior to the final inspection. B. Commercial Energy Code documentation. If required by energy code path submittal, confirmation that commissioning result requirements have been received by building owner. C. Residential Energy Code documentation. If required by energy Code path submittal (R405), confirmation that the duct test requirements shall be received by Building Official. 14. Termites. Building Components and building surroundings required to be protected from termite damage in accordance with Section 1503.7, Section 2304.12.9 or Section 2304.12.4, Florida Building Code, specifically required to be inspected for termites in accordance with Section 2114, Florida Building Code, or required to have chemical soil treatment in accordance with Section 1816, Florida Building Code, shall not be covered or concealed until the release from the Building Official has been received. 15. Impact-resistant coverings or systems. Where impact-resistant coverings or systems are installed to meet requirements of this Code, the Building Official shall schedule adequate inspections of impact-resistant coverings or systems to determine the following: A. The system indicated on the plans was installed. B. The system is installed in accordance with the manufacturer's installation instructions and the product approval. 16. Inspection agencies. The Building Official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability. 17. Inspection requests. It shall be the duty of the holder of the building Permit or their duly authorized agent to notify the Building Official when work is ready for inspection. It shall be the duty of the Permit holder to provide access to and means for inspections of such work that are required by this Code. 18. Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Building Official. The Building Official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the Permit holder or their agent wherein the same fails to comply with this Code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the Building Official. The Building Official is authorized to order the removal of work that conceals other work not having obtained prior approval. 19. Shoring. For threshold buildings, shoring and associated formwork or falsework shall be designed and inspected by a Florida licensed professional engineer prior to any required mandatory inspections by the threshold building inspector. 20. Threshold building. A. During new construction or during repair or restoration projects in which the structural system or structural loading of a building is being modified, the enforcing agency shall require a Special Inspector to perform structural inspections on a threshold building pursuant to a structural inspection plan prepared by the engineer or architect of record. The structural inspection plan must be submitted to the enforcing agency prior to the issuance of a building Permit for the construction of a threshold building. The purpose of the structural inspection plans is to provide specific inspection procedures and schedules so that the building can be adequately inspected for compliance with the permitted documents, and with specific requirements of the City of Miami. The Special Inspector may not serve as a surrogate in carrying out the responsibilities of the Building Official, the architect, or the engineer of record. The Contractor's contractual or statutory obligations are not relieved by any action of the Special Inspector. B. The Special Inspector shall determine that a professional engineer who specializes in shoring design has inspected the shoring and reshoring for conformance with the shoring and reshoring plans submitted to the enforcing agency. A fee simple title owner of a building, which does not meet the minimum size, height, occupancy, occupancy classification, or number-of-stories criteria which would result in classification as a threshold building under s. 553.71(7), Florida Statutes, may designate such building as a threshold building, subject to more than the minimum number of inspections required by the Florida Building Code. C. The fee owner of a threshold building shall select and pay all costs of employing a Special Inspector, but the Special Inspector shall be responsible to the enforcement agency. The inspector shall be a person certified, licensed or registered under Chapter 471, Florida Statutes, as an engineer or under Chapter 481, Florida Statutes, as an architect. D. Each enforcement agency shall require that, on every threshold building: i. The Special Inspector, upon completion of the building and prior to the issuance of a Certificate of Occupancy, file a signed and sealed statement with the enforcement agency in substantially the following form: "To the best of my knowledge and belief, the above described construction of all structural load- bearing Components complies with the Permitted documents, and the shoring and reshoring conforms to the shoring and reshoring plans submitted to the enforcement agency." ii. Any proposal to install an alternate structural product or system to which building codes apply be submitted to the enforcement agency for review for compliance with the codes and made part of the enforcement agency's recorded set of Permit documents. iii. All shoring and reshoring procedures, plans and details be submitted to the enforcement agency for recordkeeping. Each shoring and reshoring installation shall be supervised, inspected and certified to be in compliance with the shoring documents by the Contractor. iv. All plans for the building which are required to be signed and sealed by the architect or engineer of record contain a statement, on each drawing page, that, to the best of the architect's or engineer's knowledge, the plans and specifications comply with the applicable minimum building Codes and the applicable fire-safety standards as determined by the City of Miami in accordance with Section 110.8.4.4, Florida Building Code and Chapter 633, Florida Statutes. E. No enforcing agency may issue a building Permit for construction of any threshold building except to a licensed general Contractor, as defined in Section 489.105(3)(a), Florida Statutes, or to a licensed building Contractor, as defined in Section 489.105(3)(b), Florida Statutes, within the scope of her or his license. The named Contractor to whom the building Permit is issued shall have the responsibility for supervision, direction, management and control of the construction activities on the project for which the building Permit was issued. F. The building department may allow a Special Inspector to conduct the minimum structural inspection of threshold buildings required by this Code and Section 553.73, Florida Statutes, without duplicative inspection by the building department. However, the building department may duplicate any inspection for quality assurance, or for any other purpose as determined by the Building Official. The Building Official is responsible for ensuring that any person conducting inspections is qualified as a building inspector under Part XII of Chapter 468, Florida Statutes, or certified as a Special Inspector under Chapter 471 or 481, Florida Statutes. Inspections of threshold buildings required by Section 553.79(5), Florida Statutes, are in addition to the minimum inspections required by this Code. t. Mandatory structural inspections for condominium and cooperative buildings. a. General. The Legislature finds that maintaining the structural integrity of a building throughout the life of the building is of paramount importance in order to ensure that buildings are structurally sound so as to not pose a threat to the public health, safety, or welfare. As such, the Legislature finds that the imposition of a statewide structural inspection program for aging condominium and cooperative buildings in this state is necessary to ensure that such buildings are safe for continued use. b. As used in this Section, the terms: Milestone Inspection means a structural inspection of a building, including an inspection of load-bearing elements and the primary structural members and primary structural systems as those terms are defined in Section 627.706, Florida Statutes, by an architect licensed under Chapter 481, Florida Statutes, or engineer licensed under Chapter 471, Florida Statutes, authorized to practice in this state for the purposes of attesting to the life safety and adequacy of the structural Components of the building and, to the extent reasonably possible, determining the general structural condition of the building as it affects the safety of such building, including a determination of any necessary maintenance, repair, or replacement of any structural Component of the building. The purpose of such inspection is not to determine if the condition of an existing building is in compliance with the Florida Building Code or the firesafety Code. The Milestone Inspection services may be provided by a team of professionals with an architect or engineer acting as a registered design professional in responsible charge with all work and reports signed and sealed by the appropriate qualified team member. Substantial Structural Deterioration means substantial structural distress or substantial structural weakness that negatively affects a building's general structural condition and integrity. The term does not include surface imperfections such as cracks, distortion, sagging, deflections, misalignment, signs of leakage, or peeling of finishes unless the licensed engineer or architect performing the phase one or phase two inspection determines that such surface imperfections are a sign of Substantial Structural Deterioration. c. Inspection Phases. 1. An owner or owners of a building that is three stories or more in height as determined by the Florida Building Code and that is subject, in whole or in part, to the condominium or cooperative form of ownership as a residential condominium association under Chapter 718, Florida Statutes, or a cooperative association under Chapter 719, Florida Statutes, must have a Milestone Inspection performed for each building that is three (3) stories or more in height by December 31 of the year in which the building reaches thirty (30) years of age, based on the date the Certificate of Occupancy for the building was issued, and every ten (10) years thereafter. If a building reached thirty (30) years of age before July 1, 2022, the building's initial Milestone Inspection must be performed before December 31, 2024. If a building reaches thirty (30) years of age on or after July 1, 2022, and before December 31, 2024, the building's initial Milestone Inspection must be performed before December 31, 2025. If the date of issuance for the Certificate of Occupancy is not available, the date of issuance of the building's Certificate of Occupancy shall be the date of occupancy evidenced in any record of the local Building Official. 2. The Department may determine that local circumstances, including environmental conditions such as proximity to salt water as defined in Section 379.101, Florida Statutes, require that a Milestone Inspection must be performed by December 31 of the year in which the building reaches twenty-five (25) years of age, based on the date the Certificate of Occupancy for the building was issued, and every ten (10) years thereafter. 3. The Department may extend the date by which a building's initial Milestone Inspection must be completed upon a showing of good cause by the owner or owners of the building that the inspection cannot be timely completed if the owner or owners have entered into a contract with an architect or engineer to perform the Milestone Inspection and the inspection cannot reasonably be completed before the deadline or other circumstance to justify an extension. 4. The Department may accept an inspection report prepared by a licensed engineer or architect for a structural integrity and condition inspection of a building performed before July 1, 2022, if the inspection and report substantially comply with the requirements of this Section. Notwithstanding when such inspection was completed, the condominium or cooperative association must comply with the unit owner notice requirements in Section 110.9.9, Florida Building Code. The inspection for which an inspection report is accepted by the Department under this paragraph is deemed a Milestone Inspection for the applicable requirements in Chapters 718 and 719, Florida Statutes. If a previous inspection and report is accepted by the Department under this paragraph, the deadline for the building's subsequent ten (10) year Milestone Inspection is based on the date of the accepted previous inspection. d. The Milestone Inspection report must be arranged by a condominium or cooperative association and any owner of any portion of the building which is not subject to the condominium or cooperative form of ownership. The condominium association or cooperative association and any owner of any portion of the building which is not subject to the condominium or cooperative form of ownership are each responsible for ensuring compliance with the requirements of this Section. The condominium association or cooperative association is responsible for all costs associated with the Milestone Inspection attributable to the portions of a building which the association is responsible to maintain under the governing documents of the association. This Section does not apply to a single-family, two-family, or three-family dwelling with three or fewer habitable stories above ground. e. Upon determining that a building must have a Milestone Inspection, the Department must provide written notice of such required inspection to the condominium association or cooperative association and any owner of any portion of the building which is not subject to the condominium or cooperative form of ownership, as applicable, by certified mail, return receipt requested. The condominium or cooperative association must notify the unit owners of the required Milestone Inspection within fourteen (14) days after receipt of the written notice from the Department and provide the date that the Milestone Inspection must be completed. Such notice may be given by electronic submission to unit owners who consent to receive notice by electronic submission or by posting on the association's website. f. Phase one of the Milestone Inspection must be completed within 180 days after the owner or owners of the building receive the written notice under Section 110.9.5, Florida Building Code or Section 10-10 of this Code. For purposes of this Section, completion of phase one of the Milestone Inspection means the licensed engineer or architect who performed the phase one inspection submitted the inspection report by e-mail, United States Postal Service, or commercial delivery service to the Department. g. A Milestone Inspection consists of two phases: A. For phase one of the Milestone Inspection, a licensed architect or engineer authorized to practice in this state shall perform a visual examination of habitable and non-habitable areas of a building, including the major structural Components of a building, and provide a qualitative assessment of the structural conditions of the building. If the architect or engineer finds no signs of Substantial Structural Deterioration to any building Components under visual examination, phase two of the inspection, as provided in Section 110.9.7.2, Florida Building Code, or Section 10-10(g) of this Code, is not required. An architect or engineer who completes a phase one Milestone Inspection shall prepare and submit an inspection report pursuant to Section 110.9.8, Florida Building Code, or Section 10-10 of this Code. B. Phase two of the Milestone Inspection must be performed if any Substantial Structural Deterioration is identified during phase one. A phase two inspection may involve destructive or non-destructive testing at the inspector's direction. The inspection may be as extensive or as limited as necessary to fully assess areas of structural distress in order to confirm that the building is structurally sound and safe for its intended use and to recommend a program for fully assessing and repairing distressed and damaged portions of the building. When determining testing locations, the inspector must give preference to locations that are the least disruptive and most easily repairable while still being representative of the structure. If a phase two inspection is required, within 180 days after submitting a phase one inspection report the architect or engineer performing the phase two inspection must submit a phase two progress report to the Department with a timeline for completion of the phase two inspection. An inspector who completes a phase two Milestone Inspection shall prepare and submit an inspection report as required in this Section. C. Upon completion of a phase one or phase two Milestone Inspection, the architect or engineer who performed the inspection must submit a sealed copy of the inspection report with a separate summary of, at minimum, the material findings and recommendations in the inspection report to the condominium association or cooperative association, to any other owner of any portion of the building which is not subject to the condominium or cooperative form of ownership, and to the Building Official of the local government which has jurisdiction. The inspection report must, at a minimum, meet all of the following criteria: i. Bear the seal and signature, or the electronic signature, of the licensed engineer or architect who performed the inspection. ii. Indicate the manner and type of inspection forming the basis for the inspection report. iii. Identify any Substantial Structural Deterioration, within a reasonable professional probability based on the scope of the inspection, describe the extent of such deterioration, and identify any recommended repairs for such deterioration. iv. State whether unsafe or dangerous conditions, as those terms are defined in the Florida Building Code, were observed. v. Recommend any remedial or preventive repair for any items that are damaged but are not Substantial Structural Deterioration. vi. Identify and describe any items requiring further inspection. D. Within 45 days after receiving the applicable inspection report, the condominium or cooperative association must distribute a copy of the inspector-prepared summary of the inspection report to each condominium unit owner or cooperative unit owner, regardless of the findings or recommendations in the report, by United States mail or personal delivery at the mailing address, property address, or any other address of the owner provided to fulfill the association's notice requirements under Chapter 718 or Chapter 719, Florida Statutes, as applicable, and by electronic transmission to the e-mail address or facsimile number provided to fulfill the association's notice requirements to unit owners who previously consented to received notice by electronic transmission; must post a copy of the inspector-prepared summary in a conspicuous place on the condominium or cooperative property; and must publish the full report and inspector prepared summary on the association's website, if the association is required to have a website. E. The Department may prescribe timelines and penalties with respect to compliance with this Section. F. A Board of County Commissioners or Municipal governing body may adopt an ordinance requiring that a condominium or cooperative association and any other owner that is subject to this Section schedule or commence repairs for Substantial Structural Deterioration within a specified timeframe after the Department receives a phase two inspection report; however, such repairs must be commenced within 365 days after receiving such report. If an owner of the building fails to submit proof to the Department that repairs have been scheduled or have commenced for Substantial Structural Deterioration identified in a phase two inspection report within the required timeframe, the Department must review and determine if the building is unsafe for human occupancy. G. Cleanup of site. Upon completion of the proposed work, the Permit holder shall leave the site cleared of rubbish, debris, construction sheds or materials of construction. In the event there has been damage to public property or that rubbish, debris, construction sheds or materials of construction have been left at the site, then the Building Official shall refuse to make final inspection and shall notify the Permit holder to correct the condition of violation within five (5) days. For failure to comply with such notice after such period of five (5) days, the Permit holder is subject to the penalties specified herein, and the Building Official shall have the cleanup work done and public property restored and shall notify the legal authority, who shall institute the necessary action to have the costs placed as a lien against the property in relation to which the Permit was issued, as allowed by law, and any other requirements mandated by local law.
(Ord. No. 14279, § 2, 5-9-24)
Ask a question about Miami law
Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.