22.807.020 - Drainage control review and application requirements
A. Thresholds for drainage control review. Drainage control review and approval as described in subsection 22.807.020.B is required for any of the following:
1. Preliminary drainage review and approval is required for applications for the following approvals:
a. Subdivisions (Chapter 23.22);
b. Short plats (Chapter 23.24);
c. Unit lot subdivisions (Sections 23.22.062 and 23.24.045);
d. Lot boundary adjustments (Chapter 23.28); or
e. Master use permits that would allow development that includes 750 square feet or more of new plus replaced hard surface or 5,000 square feet of land disturbing activity where the Director has determined that a preliminary drainage review is required considering, but not limited, to the following attributes of the site:
1) Location within an environmentally critical area or buffer;
2) Proximity and tributary to an environmentally critical area or buffer; and
3) Proximity and tributary to an area with adequacy, erosion, water quality, or flooding problems.
2. Standard drainage review and approval is required for the following:
a. Applications other than those listed in subsection 22.807.020.A.1 that include any land disturbing activity encompassing an area of 5,000 square feet or more, including demolition permits;
b. Applications for a building permit or other construction permit that authorizes the construction or installation of 750 square feet or more of new plus replaced hard surface;
c. Applications for which a grading permit or approval is required pursuant to Chapter 22.170;
d. Applications for street use permits for the cumulative addition of 750 square feet or more of new plus replaced hard surface and land disturbing activity;
e. City public works projects or construction contracts, including contracts for day labor and other public works purchasing agreements, for the cumulative addition of 750 square feet or more of new plus replaced hard surface and/or land disturbing activity to the site, except for work performed for the operation and maintenance of park lands under the control or jurisdiction of the Department of Parks and Recreation;
f. Applications for approvals and contracts that include any new or replaced hard surface or any land disturbing activity on a site deemed a potentially hazardous location, as specified in Section 22.800.050 (Potentially Hazardous Locations);
g. Applications for approvals that include any new hard surface in a Category I peat settlement-prone area delineated pursuant to Section 25.09.012;
h. Whenever an exception to a requirement set forth in this Subtitle VIII or in a rule promulgated under this Subtitle VIII is desired, whether or not review and approval would otherwise be required, including, but not limited to, alteration of natural drainage patterns or the obstruction of watercourses;
i. Whenever roadway project infeasibility pursuant to subsection 22.805.060.E is applied, whether or not review and approval would otherwise be required; or
j. Applications for approvals for activities or projects for:
1) Fueling at dedicated stations, for new or substantially altered fueling stations.
2) In-water and over-water fueling.
3) Maintenance and repair of vehicles and equipment.
4) Concrete and asphalt mixing and production.
5) Recycling, wrecking yard, and scrap yard operations.
6) Storage of liquids in aboveground tanks.
7) Other projects that the Director determines pose a hazard to public health, safety, or welfare; endanger any property; adversely affect the safety and operation of City right-of-way, utilities, or other property owned or maintained by the City; or adversely affect the functions and values of an environmentally critical area or buffer.
3. Comprehensive drainage review and approval is required for applications other than those listed in subsection 22.807.020.A.1 that include:
a. 5,000 square feet or more of new plus replaced hard surface;
b. 10,000 square feet or more of land disturbing activity;
c. A project that has no available off-site point of discharge for stormwater as determined by the Director;
d. An infiltration facility that is designed to fully infiltrate all stormwater runoff directed to it;
e. An installation of a new outfall to a receiving water; or
f. Demolition of a building with a roof area of 5,000 square feet or greater, even if the existing building slab remains.
B. For purposes of applying the thresholds in subsection 22.807.020.A, all closely related projects, projects under a common plan of development or sale, subdivisions, and short plats as determined according to subsection 22.805.010.B shall be counted towards the threshold.
C. The City may, by interagency agreement signed by the Directors of SPU and SDCI, waive the drainage and erosion control permit and document requirements for property owned by public entities, when discharges for the property do not enter the public drainage system or the public combined sewer system. Whether or not the public entities are required to obtain permits or submit documents, such entities are subject to the substantive requirements of this subtitle.
D. Submittal requirements for drainage control review and approval
1. Information required for preliminary drainage review. The following information shall be submitted to the Director for all projects for which preliminary drainage review is required:
a. Preliminary site plan. A site plan as set forth in rules promulgated by the Director.
b. Preliminary drainage control plan. A drainage control plan that identifies all new and replaced hard surfaces, new and replaced pollution-generating hard surfaces, drainage control facilities, and best management practices for each lot, parcel, and tract of land within the project.
1) The preliminary drainage control plan shall include all drainage control facilities required to meet the minimum requirements for flow control (Section 22.805.080), water quality treatment (Section 22.805.090), and on-site stormwater management (Section 22.805.070), as well as all other best management practices to ensure drainage adequacy.
2) The preliminary drainage control plan shall be prepared by a licensed civil engineer in accordance with standards adopted by the Director, for projects that meet the thresholds for comprehensive drainage control review per subsection 22.807.020.A.3.
2. Information required for standard drainage review. The following information shall be submitted to the Director for all projects for which standard drainage review is required.
a. Site plan. A site plan shall be submitted to the Director.
b. Standard drainage control plan. A drainage control plan shall be submitted to the Director. Standard designs for drainage control facilities as set forth in rules promulgated by the Director may be used.
c. Construction stormwater control plan. A construction stormwater control plan demonstrating controls sufficient to determine compliance with subsection 22.805.020.D shall be submitted. The Director may approve a checklist in place of a plan, pursuant to rules promulgated by the Director.
d. Memorandum of drainage control. The owner(s) of the site shall sign a "memorandum of drainage control" that has been prepared by the Director of SPU. Completion of the memorandum shall be a condition precedent to issuance of any permit or approval for which a drainage control plan is required. The applicant shall file the memorandum of drainage control with the King County Recorder's Office so as to become part of the King County real property records. The applicant shall give the Director of SPU proof of filing of the memorandum. The memorandum shall not be required when the drainage control facility will be owned and operated by the City. A memorandum of drainage control shall include:
1) The legal description of the site;
2) A summary of the terms of the drainage control plan, including any known limitations of the drainage control facilities, and an agreement by the owners to implement those terms;
3) An agreement that the owner(s) shall inform future purchasers and other successors and assignees of the existence of the drainage control facilities and other elements of the drainage control plan, the limitations of the drainage control facilities, and of the requirements for continued inspection and maintenance of the drainage control facilities;
4) The side sewer permit number and the date and name of the permit or approval for which the drainage control plan is required;
5) Permission for the City to enter the property for inspection, monitoring, correction, and abatement purposes;
6) An acknowledgment by the owner(s) that the City is not responsible for the adequacy or performance of the drainage control plan, and a waiver of any and all claims against the City for any harm, loss, or damage related to the plan, or to drainage or erosion on the property, except for claims arising from the City's sole negligence; and
7) The owner(s)' signatures acknowledged by a notary public.
e. Submittals identified by rule. Additional information shall be submitted to the Director to comply with the requirements of this subtitle and rules promulgated hereunder and to accomplish the purposes of this subtitle.
3. Information required for comprehensive drainage review. In addition to the submittal requirements for standard drainage review, the following information is required to be submitted to the Director for projects for which comprehensive drainage review is required:
a. Comprehensive drainage control plan. A comprehensive drainage control plan, in lieu of a standard drainage control plan, to comply with the requirements of this subtitle and rules promulgated hereunder and to accomplish the purposes of this subtitle shall be submitted with the permit application. It shall be prepared by a licensed civil engineer in accordance with standards adopted by the Director unless otherwise not required per rules promulgated by the Director.
b. Inspection and maintenance schedule. A schedule shall be submitted that provides for inspection of temporary and permanent flow control facilities, treatment facilities, and source control facilities to comply with Section 22.803.040 (Minimum source controls for specific activities), Section 22.805.070 (Minimum requirements for on-site stormwater management), Section 22.805.080 (Minimum requirements for flow control), and Section 22.805.090 (Minimum requirements for treatment).
c. Construction stormwater control plan. A construction stormwater control plan prepared in accordance with subsection 22.805.020.D shall be submitted.
4. Applications for drainage control review and approval shall be prepared and submitted in accordance with provisions of this subsection, with Chapter 21.16 (Side Sewer Code), and with associated rules and regulations adopted by the Directors of SDCI and SPU.
5. The Director may require additional information necessary to adequately evaluate applications for compliance with the requirements and purposes of this subtitle and other laws and regulations, including, but not limited to, Chapter 25.09 (Regulations for Environmentally Critical Areas) and Chapter 23.60A (Seattle Shoreline Master Program Regulations). The Director may also require appropriate information about adjoining properties that may be related to, or affected by, the drainage control proposal in order to evaluate effects on the adjacent property. This additional information may be required as a precondition for permit application review and approval.
E. Authority to review. The Director may approve those plans that comply with the provisions of this Subtitle VIII and rules promulgated hereunder, and may place conditions upon the approval in order to assure compliance with the provisions of this subtitle. Submission of the required drainage control application information shall be a condition precedent to the processing of any of the above-listed permits. Approval of drainage control shall be a condition precedent to issuance of any of the above-listed permits. The Director may review and inspect activities subject to this Subtitle VIII and may require compliance regardless of whether review or approval is specifically required by this subsection 22.807.020.E. The Director may disapprove plans that do not comply with the provisions of this Subtitle VIII and rules promulgated hereunder. Disapproved plans shall be returned to the applicant, who may correct and resubmit the plans.
(Ord. 127444, § 6, 2026; Ord. 126336, § 5, 2021; Ord. 125292, § 1, 2017; Ord. 125248, § 52, 2017; Ord. 124919, § 97, 2015; Ord. 124872, § 43, 2015; Ord. 124105, § 8, 2013; Ord. 123105, § 3, 2009.)