Sec. 3-71. - Permits required.
No person other than a licensed mechanical contractor or as a licensed individual shall install a mechanical system (defined for purposes of this article as any heating system, ventilation system, air conditioning system, non-masonry chimney and vent, refrigeration unit and system, exhaust system, duct system, combustion air system, solar thermal energy generating system, whether heating, air or water) and fire protection equipment such as commercial automatic extinguishing systems, commercial exhaust hoods, commercial sprinkler systems and commercial fire alarm systems in or as a part of any building in the city or county. A permit for such must be secured and a permit to do plumbing work must be secured from the planning department.
(1) Application. Application for plumbing permits and/or mechanical system permits shall be made on or before the date work is begun, on a prescribed form, and shall state the correct lot, block, and street number where the work is to be performed and the name of the owner of the property, and shall be accompanied by a readable drawing of the work indicating the size and character of the material or equipment to be installed.
(2) Changes to plans. If, after a permit is issued, it is desired to alter or deviate in any manner from the terms of the application and drawings submitted at the time of securing the permit, notice of such intentions shall be given to the building official/inspector, and/or fire inspector and a correct drawing furnished to and approved by the building official/inspector or designated agent before inspection is made.
(3) Revocation. A permit shall be revoked by the building official/inspector or designated agent for any material departure from the approved application and drawing, or in the event any false statement or representation was made in securing the permit.
(4) Expiration. Each permit shall lapse by limitation and become void if the work is not performed within three (3) months from the date of issuance. The permit will be valid for a period of six (6) months. An extension may be granted by the building official/inspector, at no additional fee.
(5) Inspection fee. An inspection fee shall be paid prior to the issuance of any plumbing permit or any permit for the installation of the mechanical systems in each single or double occupancy, tenement, office or any other building under one (1) roof. This charge will cover the approval of plans and all inspections during the progress and completion of the work.
(6) Penalty for failure to obtain permit. Any person who engages in or follows the business or occupation of, or advertises or holds himself or itself out as or acts temporarily or otherwise as a master plumber or mechanical systems contractor or as an individual without first having secured the required license, or who otherwise violates any provisions of this article shall be deemed guilty of a misdemeanor and, upon conviction thereof, shall be punishable as provided in section 1-9, and in the case of continuing violations without reasonable effort on the part of the defendant to correct same, each day the violation continues thereafter shall be a separate offense.
(7) Condemnation and removal of defective work. The building official/inspector or designated agent shall promptly condemn and order the removal of any defective material or work, and the presence of any willfully hidden defects shall be sufficient cause for the revocation of the mechanical contractor's license.
(Ord. No. 00-0006, § 1, 5-2-00)