Sec. 69.504. - Drainage and storm sewers.
(a) Separate systems. The planning commission shall not recommend for approval any plat of subdivision which does not make adequate provision for storm or surface water runoff. The stormwater drainage system shall be separate and independent of any sanitary sewer system. (b) General requirements. Each subdivision will be required by the planning commission to provide stormwater management for all storms up to and including the one hundred-year storm, as defined by the director of public works. The applicant shall control the peak stormwater discharge rates from the site to less than one and sixty-four one hundredths (1.64) cubic feet per second per acre. Furthermore, the applicant must provide an adequate outlet for any spring or surface water that may exit either previous to or as a result of the subdivision. All plans shall be designed in accordance with the rules, regulations and standards of the director of public works. Facilities intended to be dedicated to the city shall be located in the street right-of-way where feasible and otherwise shall be located in perpetual, unobstructed easements of a width to be determined by the director of public works. (c) Accessibility to public storm sewers: (1) Where a public storm sewer is accessible, the applicant shall install all necessary storm sewers within the subdivision and connecting to the public storm sewer. Where no public storm sewer is available, adequate provision shall be made for the disposal of stormwater as specified by the director of public works. Subdivisions in business and industrial districts shall have underground storm and clearwater sewer systems constructed throughout, and these systems shall be connected to an approved public sewer, drainage way or outfall where available. (2) If a connection to a public storm sewer will be provided eventually, as determined by the director of public works and the planning commission, the developer shall make arrangements for future stormwater disposal by a public utility system at the time the plat receives final approval. (d) Accommodation of upstream drainage areas. Adequate provisions shall be made to accommodate potential runoff from the entire upstream drainage area. The director of public works shall determine the necessary size of the facility, based on the provisions of the development standards and specifications assuming conditions of maximum potential watershed development permitted by the zoning code. (e) Effect on downstream drainage areas. The director of public works shall also study the effect of each subdivision on existing downstream drainage facilities outside the area of the subdivision. Local government drainage studies together with such other studies as shall be appropriate shall serve as a guide to needed improvements. Where it is anticipated that the additional runoff incident to the development of the subdivision will overload an existing downstream drainage facility, the planning commission may withhold approval of the subdivision until provision has been made for the improvement of said potential condition in such sum as the planning commission shall determine. No subdivision shall be approved unless adequate drainage will be provided to an adequate drainage watercourse or facility. (f) Areas of poor drainage. A plat for an area which is subject to flooding may be approved by the planning commission, provided, that: (1) Sufficient fill be placed so that minimum street and lot elevations are at least twelve (12) inches above the elevation of the maximum probable flood as determined by the director of public works. (2) Any filling in this area would not cause increased flooding of other areas. (3) An overflow zone is provided along any stream or watercourse which is sufficiently wide to contain or move the maximum probable flood, as determined by the director of public works. (4) No structure or fill be placed in the overflow zone. (5) For all subdivisions in the RC-1 Floodway District and RC-2 Flood Fringe District: a. The subdivision and the individual lots shall have road access no lower than two (2) feet below the regulation flood protection elevation. b. The floodway and flood fringe district boundaries, the regulatory flood protection elevation and the required elevation of all access roads shall be clearly labeled on all required subdivision drawings and documents. c. The Federal Emergency Management Agency (FEMA) has established criteria for removing the special flood hazard area for certain structures properly elevated on fill above the 100-year flood elevations. FEMA's requirements incorporate specific fill compaction and side slope protection standards for multistructure or multilot developments. These standards should be investigated prior to the initiation of site preparation if a change of special flood hazard area designation will be requested. (g) Stormwater detention ponds. (1) Drainage criteria: The subdivider shall provide for stormwater detention in compliance with the following standards: a. Drainage from any site being developed or extensively redeveloped with drainage to the public sewer or public right-of-way shall be controlled in accordance with best management practices to comply with required local and regional water quality, volume, and rate control standards. These standards include but are not limited to chapter 52, stormwater runoff. b. Where feasible, the drainage system shall be designed so that all stormwater runoff and surface water from the site shall discharge in a manner so as to preclude drainage of water onto the adjacent properties. c. Reserved. (2) Dedication of Land: The planning commission shall require that land be reserved for stormwater detention ponds in locations designated in the comprehensive plan or as designated by the director of public works such that their use will prevent erosion or substantially reduce the costs of the stormwater disposal system. Each reservation shall be of suitable size, dimension, topography, and general character and shall have adequate access for public maintenance. The area shall be shown and marked on the plat, "Reserved for Stormwater Detention Pond Purposes." The developer shall dedicate all such ponding areas to the city as a condition of final subdivision plat approval. Where the required ponding area, as designated in the comprehensive plan or as designated by the director of public works, has a value in excess of seven (7) percent of the market value of the subdivision lands as determined by the city valuation engineer, it shall be offered to the city for purchase; the city shall be given a reasonable time to respond. (3) Money in lieu of land: In the event that a particular subdivision does not contain a stormwater detention pond, as designated in the comprehensive plan, on the official map or by the director of public works, the planning commission shall require, prior to final approval of the subdivision plat, that the applicant deposit with the city a cash payment in lieu of land reservation. Such deposit shall be placed in a stormwater detention pond fund to be established by the city. Such deposit shall be used by the city for improvements to, or maintenance of, existing ponds or acquisition of property. Such deposit must be used for facilities that will be actually available to and benefit the persons in said subdivision and be located in the general neighborhood of the subdivision. The amount deposited shall be seven (7) percent of the market value of the subdivision lands at the time of the subdivision application, as determined by the city valuations engineer.
(C.F. No. 91-531, § 35, 5-6-93; C.F. No. 93-1718, § 116, 12-14-93; C.F. No. 03-1028, § 1, 4-7-04; Ord 23-16, § 4, 4-12-23)
Ask a question about St. Paul law
Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.