§ 44-277 — Construction standards

Code of Ordinances, City of Round Rock, Texas (Supp. 27: codified through Ordinance of August 13, 2026 (online updated November 5, 2026)) · Round Rock Code of Ordinances § 44-277

Corpus is an independent public-information project, not the official City of Round Rock website. Stable reference: corpuslaw.us/code/d6f4f7cc-5d05-4533-9a81-2ecc2ef617c5

Sec. 44-277. - Construction standards.

(a) Once a permit is issued, a utility company, or its representative, shall notify the director and any other designated departments of the city at least 24 hours in advance that construction in the public rights-of-way is ready to proceed. Information signs (at least three feet by three feet in size) stating the identity of the contractor doing the work, their telephone number, and the utility company's identity and telephone number shall be placed at the location where construction is to occur no earlier than five business days and no later than 24 hours prior to the beginning of work in the public rights-of-way and shall continue to be posted at the location during the entire time the work is occurring and/or until the work is completed. An informational sign will be posted on each end of the public rights-of-way 100 feet before the construction location commences. Information signs shall be located in such a manner that does not adversely affect vehicular or pedestrian traffic. (b) All construction shall be in conformity with all city codes and applicable local, state and federal laws. (c) Erosion control measures and advance warning signs, markers, cones and barricades must be in place before work begins. A utility company may be required to show proof of engineered plans relating to storm water and erosion when applicable or a letter stating the utility company is not required by law to obtain such plans. The utility company shall be responsible for storm water management and erosion control that complies with city, state and federal guidelines, as applicable. Requirements shall include, but shall not be limited to, silt fencing around any excavation that will be left overnight, silt fencing in erosion areas until reasonable vegetation is established, barricade fencing around open excavations, and wire backed silt fencing in high erosion areas. Upon request, the utility company may be required to furnish documentation submitted or received from the federal or state governments. (d) The utility company shall ensure that dust control measures are implemented at the site. (e) Except in the case of an emergency, or as otherwise approved by the director: (1) Lane closures on major thoroughfares will be limited to between 9:00 a.m. and 4:00 p.m., unless the director grants prior approval. All traffic control devices shall conform to the TMUTCD, provided that the city may dictate restrictions due to rush hour traffic, unique events, or other conditions that may warrant such restrictions. (2) Working hours in the public rights-of-way are limited to the hours between 7:00 a.m. to 6:00 p.m. Monday through Friday. When work on Saturdays, Sundays or city-observed holidays is allowed as provided in subsection (e)(4) below, working hours are limited to the hours between 9:00 a.m. and 6:00 p.m. on Saturdays and city-observed holidays, and between noon and 6:00 p.m. on Sundays. Work to be performed after 6:00 p.m. must be approved in writing by the director in advance. Regardless of the above, work before sunrise or after sunset is prohibited unless appropriate provisions for night work as approved by the director are implemented. (3) Directional boring is permitted only Monday through Friday 7:00 a.m. to 6:00 p.m., unless approved in advance. (4) Work on Saturdays, Sundays and city-observed holidays is generally discouraged; however, such work may be authorized when the director determines that the work is in the best interest of the public. The director's determination shall be based on factors including but not limited to the following: (i) the work will cause less disruption to pedestrian or vehicular traffic or the public than that caused on a weekday; (ii) the availability and necessity of city staff to inspect or otherwise administer the provisions of this section with respect to the work; and (iii) any special activities planned or occurring at the site of the work. Any work in the public rights-of-way performed on Saturdays or city-observed holidays must be approved in writing by the director at least 48 hours in advance. Any work in the public rights-of-way performed on Sundays must be approved in writing by the director at least 72 hours in advance. (f) Without affecting the legal relationship between the utility company and its contractors, a utility company is responsible for the workmanship and any damages by a contractor or subcontractor. A responsible representative of the utility company will be available to the director at all times during construction. (g) The utility company or contractor or subcontractor shall notify the director immediately of any damage to other utilities, either city-owned or privately owned. (h) It is city's policy to discourage the cutting of street and sidewalk pavements and the blocking of sidewalks or other pedestrian paths; however, when a street or sidewalk pavement cut is required, prior approval must be obtained in accordance with article III of this chapter and all requirements provided in article III shall be followed. When a sidewalk or other pedestrian path must be blocked or cut, temporary measures shall be provided to accommodate pedestrian traffic as approved by the director. Such measures may include the construction of a temporary pedestrian pathway in accordance with state accessibility standards. Repair of all street and sidewalk pavement cuts must be made promptly to avoid safety hazards to vehicle and/or pedestrian traffic. (i) Installation of facilities must not interfere with city utilities or the maintenance of them, in particular, gravity dependent facilities. (j) New facilities must be installed to a depth approved by the director, in accordance with DACS. (k) All directional boring shall have a locator place bore marks and depths while bore is in progress. A locator shall place marks at each stem with paint dots and depths at least every other stem. (l) Utility companies working in the public rights-of-way are responsible for obtaining line locates from all affected utilities or others with facilities in the public rights-of-way prior to any excavation. Use of the Geographic Information System or the plans of record does not satisfy this requirement. (m) The utility company will be responsible for verifying the location, both horizontal and vertical, of all facilities which might possibly interfere with the construction activities. When required by V.T.C.A., Utilities Code § 251.001 (the Underground Facility Damage Prevention and Safety Act), the utility company shall verify locations by potholing, hand digging, or other acceptable method prior to any excavation or boring. (n) Placement of all manholes and/or handholes must be approved in advance by the director. Handholes or manholes will not be located in sidewalks unless approved by the director. (o) Locate flags or marks shall not be removed from a location while facilities are being constructed. (p) When the pumping of water and/or mud is required during construction, the water and/or mud shall be contained in accordance with applicable city ordinances and federal and state law and the directives of the director. (q) All streets and sidewalks shall be kept clean and clear of rocks, mud, dirt, debris, etc. to the extent practicable and any street or sidewalk shall be cleaned upon notification by the director. If any streets or sidewalks are not kept clean, the director may suspend work. (r) Except in emergency situations, work within a roadway shall not be initiated during inclement weather involving foggy, rainy or icy conditions.

(Ord. No. G-07-09-12-10E1, § I(10.908), 8-9-2007; Ord. No. G-10-06-10-8B1, § IV, 6-10-2010)