For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-315 — Provision of open drainage

The Little Rock City Code, Revised 1988 (Supp. No. 83: codified through Ordinance No. 22,703, enacted December 16, 2025) · Little Rock City Code § 31-315

Corpus is an independent public-information project, not the official City of Little Rock website. Stable reference: corpuslaw.us/code/d70ca668-3f57-435e-87bb-5ae5c1597536

Sec. 31-315. - Provision of open drainage.

The following improvements and requirements are alternatives in lieu of curb and gutter and underground drainage: (1) Shoulders shall be designed to meet at least seventy-five (75) percent of the design requirements for pavement. A double surface treatment may be used for these shoulders. (2) Open drainage ditches will be permitted at street rights-of-way or easements, provided they meet the following requirements: a. The side slopes shall commence a minimum of four (4) feet from the edge of the paved shoulders. b. The side slope for both slopes of an earthen ditch shall be at slope of three to one (3:1) or less. For concrete or riprap-lined ditches, a slope of one to one (1:1) or less is permissible with the approval of the public works department. c. The maximum high water ditch elevation for designed capacity shall be a minimum of six (6) inches below the bottom of the base of the paved shoulder. d. Street shoulder right-of-way width shall be a minimum of ten (10) feet beyond the top of the back slope requirements. e. Concrete head walls riprap and/or flume-type structures as required by the public works department shall be required for all underground facilities. f. Bills of assurance will require the adjoining property owners to mow and maintain the right-of-way and/or drainage easements adjacent to his property upon proper notice. If the property owner does not comply with the notice, the area may be mowed by the city and the property owner billed as per the procedure on vacant lots within the city. g. All required drainage ditches shall be designed for appropriate erosion control (such as sodding, ditch checks, riprap, ditch paving or other accepted engineering practices). h. In case of open drainage within the street right-of-way the following shall be the setback line from the centerline of the right-of-way: 1. Industrial street, seventy (70) feet. 2. Minor or principal arterial, one hundred twenty (120) feet. 3. Cul-de-sac, seventy (70) feet. 4. Cul-de-sac turnarounds, one hundred five (105) feet. When street right-of-way requirements as set forth above are greater than normal requirements, the building line shall be a minimum of twenty (20) feet from the right-of-way line. In no case shall it be less than the requirements set forth immediately above.

(Code 1961, § 37-30(c); Ord. No. 17,697, § 3d, 3-17-98; Ord. No. 18,054, § 1(n), 7-6-99)

Ask a question about Little Rock law

Corpus searches the Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.