Sec. 12.16.605. - Monitoring equipment required.
(a) The director may require the industrial user to install, at the industrial user's expense, suitable monitoring facilities or equipment that allows for the representative sampling and accurate observation of wastewater discharges. Whether constructed on public or private property, the monitoring facilities shall be constructed in accordance with the city's requirements and all applicable construction standards and specifications. Monitoring equipment and structures shall be maintained in proper working order and kept safe and accessible at all times to city personnel. The monitoring equipment shall be located and maintained on the industrial user's premises outside of the building unless otherwise approved by the city. If the monitoring structure is located within the secured perimeter of the industrial user, there shall be accommodations to allow safe and immediate access for city personnel. This may include immediate access through security gates or installation of a separate gate secured with a city lock. When installation of monitoring facilities at a location within the industrial user's facility would be impractical, the city may allow such facility to be constructed in the public street or easement area, with the approval of the agency having jurisdiction over such street or easement, and located so that it will not be obstructed by public utilities, landscaping or parked vehicles. (b) When more than one industrial user can discharge into a common service line, the director may require installation of a separate monitoring facility and equipment for each industrial user. Also when, in the judgment of the director, there is a significant difference in wastewater constituents and characteristics produced by different operations of a single industrial user the director may require that separate monitoring facilities be installed for differing discharge. (c) Monitoring facilities shall be operated and maintained at the industrial user's expense. (d) Flow, pH and LEL meters: If the director determines that an industrial user needs to measure and report wastewater flow, discharge process wastewaters necessitating continuous pH measurement or discharge wastewater that may contain flammable substances may be required to install and maintain, at the industrial user's expense, approved meters, structures and equipment. (e) Unless approved by the director in writing, no industrial user shall cover any manhole, sewer cleanout, or other openings in the wastewater collection system with earth, paving, or otherwise render it inaccessible. (f) When, in the judgment of the city, an existing user requires a monitoring facility, the user will be so notified in writing. Construction must be completed within 90 days following written notification unless a time extension is otherwise granted by the city.
(Ord. No. 6305, § 1, 8-28-13)
Ask a question about Reno law
Corpus searches the Reno sections it holds and shows the ones that match, with their citations. Free, no sign-in.