For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38-11 — Collection of fees

Code of the City of Chandler (Supp. No. 80: codified through Ordinance No. 5171, adopted July 13, 2026) · Chandler City Code § 38-11

Corpus is an independent public-information project, not the official City of Chandler website. Stable reference: corpuslaw.us/code/d79c658d-6394-48ca-92dc-2f9c71b0ca82

38-11. - Collection of fees.

A. Collection. System development fees, together with any administrative charges assessed to defray the costs of administering this chapter, shall be calculated and collected at issuance of permission to commence development; specifically: 1. Unless otherwise specified pursuant to a Development agreement adopted pursuant to Section 38-13 of this chapter, system development fees shall be paid at the time of issuance of a building permit according to the current system development fee schedule for the applicable service area(s) as adopted pursuant to this chapter, or according to any other applicable system development fee schedule as authorized in this chapter. (a) The City shall determine the amount of each required system development fee through the use of the applicable fee schedule. (b) The City shall determine the category of development for each development based on the land use(s) applicable to the lot to be developed in its entirety. The system development fees for retail/commercial, office, public/quasi-public and industrial/warehouse shall take into account that a development or phase of development may contain components of more than one use category but the primary use category for which the development or phase of development is being constructed shall be the basis for which fees are assessed. If a lot consists of two (2) or more separate areas with different land uses applicable to each separate area, then the system development fee shall be determined by adding up all the fees that would be applicable for each land use type in each separate area. Determinations of the category of development by the City Engineer may be appealed to the City Manager or his/her designee. (c) The City shall determine the water meter size for each lot based on the actual meter size installed on each lot. If the exact meter size is not listed in a table, then the City shall use the next largest meter size in such table. If a lot consists of two (2) or more separate areas with separate meters in each separate area, then the system development fee shall be determined by adding up all the fees that would be applicable for each meter size in each separate area. If a new wastewater customer is not a water customer, the City Engineer will determine the appropriate water meter size based on the estimated wastewater generation for the project. (d) In assessing the system development fees for non-residential land use types, square footage shall be measured in terms of gross floor area, and any determination of square footage shall be in whole units, with any fractions thereof being rounded up to the next square foot. (e) System development fees for development projects involving an addition to or remodeling of an existing facility, change of use, change of housing type, change of meter size or other modification or redevelopment of a previously developed lot or building with a valid certificate of occupancy shall be calculated as follows: the applicable system development fees for the proposed development as set forth in the current system development fee schedules minus the applicable system development fees for the previous development as set forth in the current system development fee schedules. In the event that the difference is negative, no refund of previously paid system development fees shall be made. 2. If a building permit is not required for the development, but water or wastewater connections are required, any and all system development fees due shall be paid at the time the water service connection is purchased. If only a wastewater connection is required, the system development fees shall be paid prior to approval of a connection to the sewer system. If no building permit or water or wastewater connection is required, all system development fees shall be paid prior to development approval. Wastewater system development fees shall be assessed if a development connects to the public sewer, or as determined by the City Engineer, is capable of discharging sewage to a City public sewer. 3. If the development is located in a service area with a stormwater, drainage, and flood control system development fee, and neither a building permit, water, or sewer service connection is required, the storm drainage system development fee due shall be paid at the time a civil or site permit is issued for the development. 4. No building permit, water or sewer connection, or certificate of occupancy shall be issued if a system development fee is not paid as directed in the previous paragraphs. 5. If the building permit is for a change in the type of building use, an increase in square footage, a change to land use, or an addition to a point of demand to the water or wastewater system, the system development fee shall be assessed on the additional service units resulting from the expansion or change, and following the system development fee schedule applicable to any new use type. 6. For issued permits that expire or are voided, system development fees and administrative charges shall be as follows: (a) If the original permittee is seeking to renew an expired or voided permit, and the system development fees paid for such development have not been refunded, then the permittee shall pay the difference between any system development fees paid at the time the permit was issued and those in the fee schedule at the time the permit is reissued or renewed. (b) If a new or renewed permit for the same development is being sought by someone other than the original permittee, the new permit applicant shall pay the full system development fees specified in the fee schedule in effect at the time that the permits are reissued or renewed. If the original permittee has assigned its rights under the permits to the new permit applicant, the new permit applicant shall pay system development fees as if it were the original permittee. B. Exceptions. System development fees shall not be owed under any of the following conditions. 1. System development fees have been paid for the development and the permit(s) which triggered the collection of the system development fees have not expired or been voided. 2. The approval(s) that trigger the collection of system development fees involve modifications to existing development that do not: (a) add new EDUs, (b) increase the impact of existing EDUs on existing or future capital facilities, or (c) change the land-use type of the existing development to a different category of development for which a higher system development fee would have been due. To the extent that any modification does not meet the requirements of this paragraph, the system development fee due shall be the difference between the system development fee that was or would have been due on the existing development and the system development fee that is due on the development as modified. 3. Public schools and charter schools shall be exempt from payment of non-utility system development fees in accordance with A.R.S. § 9-500.18 with the exception of arterial street system development fees. In addition, public schools and charter schools shall be exempt from arterial street system development fees. 4. Separate water meters installed for irrigation purposes only shall not be included in the calculation of the wastewater system development fee. In redevelopment situations, credit shall be issued for existing water meters assigned to the property in question based on the current utility system development fees in effect at the time. When a building(s) is demolished as part of redevelopment, any credits will be applied to utility system development fees owed. When a larger water meter is required to serve an existing building due to a change in use, the difference between the value of the existing meter system development fees in current dollars will be applied against any new system development fees owed. Water, wastewater and reclaimed water system development fees shall not be charged for meters dedicated only for fire flow. In the case of a change of use of an existing building where a larger meter is required to accommodate fire flow, the system development fees will be based only on the meter size upgrade that is required for domestic consumption. 5. Temporary structures for which an administrative use permit is secured for use as a sales office and not for residential or other purposes and intended to be removed within the two-year period granted under the use permit shall be exempt from system development fees. This exemption shall not apply where the temporary building is erected on a parcel of land upon which a permanent building with permanent facilities is to be constructed. C. Temporary exemptions from system development fee schedules. New developments in the City shall be temporarily exempt from increases in system development fees that result from the adoption of new or modified system development fee schedules as follows: 1. Single-family uses. On or after the day that the first building permit is issued for a single-family development, the City shall, at the permittee's request, provide the permittee with an applicable system development fee schedule that shall be in force for a period of twenty-four (24) months beginning on the day that the first building permit is issued, and which shall expire at the end of the first business day of the 25th month thereafter. During the effective period of the applicable system development fee schedule, any building permit issued for the same single-family development shall not be subject to any new or modified system development fee schedule, provided that if the City reduces the amount of an applicable system development fee during the period that a grandfathered system development fee schedule is in force, the City shall assess the lower system development fee. 2. Non-residential and multi-family uses. On or after the day that the final approval is issued for a non-residential or multi-family development, the City shall provide an applicable system development fee schedule that shall be in force for a period of twenty-four (24) months beginning on the day that final development approval of a site plan or final subdivision plat is given, and which shall expire at the end of the first business day of the 25th month thereafter. For the purpose of this paragraph, final approval shall mean the approval of a site plan or, if no site plan is submitted for the development, the approval of a final subdivision plat. During the effective period of the applicable system development fee schedule, any building permit issued for the same development shall not be subject to any new or modified system development fee schedule, provided that if the City reduces the amount of an applicable system development fee during the period that a grandfathered system development fee schedule is in force, the City shall assess the lower system development fee. 3. Other development. Any development not covered under paragraphs 1 and 2 of this subsection shall pay system development fees according to the fee schedule that is current at the time of collection as specified in Subsection A of this Section. 4. Changes to site plans and subdivision plats. Notwithstanding the other requirements of this subsection, if changes are made to a development's final site plan or subdivision plat that will increase the number of service units after the issuance of a grandfathered system development fee schedule, the City may assess any new or modified system development fees against the additional service units. D. Option to pursue special fee determination. The development fees with categories "Retail/Commercial," "Office," "Public/Quasi-Public" and "Industrial/Warehouse" take into account that a development or phase of development may contain components of more than one use category but the primary use category for which the development or phase of development is being constructed shall be the basis for which fees are assessed. For uses that cannot readily be designated under a particular category and are not part of a larger retail, industrial or office development, the City Engineer shall determine the category the particular use will be assigned based on which category has a p.m. peak hour trip generation rate equal to or less than the rate for the land use under consideration.

(Ord. No. 4459, 7-8-13; Ord. No. 4528, § 1, 5-8-14)

Ask a question about Chandler law

Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.