545.960. - Equipment replacement.
(a) Equipment replacement. Certain nonconforming production uses may complete equipment replacement as follows: (1) Permanent equipment replacement. a. A legal nonconforming scrap/salvage yard, metal milling facility, or facility for crushing and processing of concrete, asphalt, or rock, may replace existing equipment included on a certified list of shredding, milling, grinding, baling or packing equipment for the handling of scrap or salvage materials, or a certified list of crushing or grinding equipment for the handling of concrete, asphalt, rock or similar materials, properly submitted to the zoning administrator by August 31, 1992, in accordance with the requirements of the zoning code of 1963. With respect to the permanent replacement of such equipment, such facility may increase by up to ten (10) percent the rated compression capacity, shear force capacity or other appropriate power or capacity measurement approved by the zoning administrator for the piece of equipment being replaced. A piece of equipment shall be allowed only one (1) increase of up to ten (10) percent in any ten (10) year period. b. A legal nonconforming production use with an air emission permit may replace or add equipment that will reduce the emission of any regulated pollutant, subject to compliance with all applicable zoning standards and compliance with other local, state, or federal laws. (2) Temporary equipment replacement. a. In general. Equipment may be temporarily leased and used at such facility during mechanical breakdowns or the overhaul or repair of existing equipment included on the certified list of shredding, milling, grinding, baling or packing equipment, or on the certified list of crushing or grinding equipment, for periods of less than thirty (30) continuous days and not exceeding sixty (60) total days in any one (1) calendar year, subject further to the requirement that the rated compression capacity or other appropriate power or capacity measurement of the temporary equipment shall not exceed by more than ten (10) percent the rated capacity measurement of the equipment temporarily replaced. b. Hardship. Upon application to the zoning administrator showing that the operation of this section would create a substantial hardship, the period allowed for temporary leasing and use of equipment at the facility may be extended for the time reasonably required to complete the necessary equipment repair or replacement, not exceeding a total additional period of sixty (60) days. (3) Drive-through banking facilities. Any lawfully nonconforming drive-through banking facility may replace teller-served equipment with automatic teller machines, or vice versa, provided the number of drive-through lanes shall not be increased, and subject to all other applicable regulations of this zoning ordinance.
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.