§ 9A.02 — Right-of-Way Permits, Enforcement and Appeal
Cedar Rapids, Iowa, Municipal Code (Supp. No. 25, Update 1: codified through Ordinance No. 025-26, passed July 28, 2026) · Cedar Rapids Municipal Code § 9A.02
Corpus is an independent public-information project, not the official City of Cedar Rapids website. Stable reference: corpuslaw.us/code/d866d1ea-1e16-406f-9b1a-01738559c89a
9A.02 - Right-of-Way Permits, Enforcement and Appeal
Permits required. Except as otherwise provided, no person shall use, occupy, excavate, obstruct or work in any right-of-way without first obtaining a work in the right-of-way permit, obstruction in the right-of-way permit, non-franchise public utility permit or small wireless facilities permit from the director. A work in the right-of-way permit allows the permittee to excavate or work within a specified city right-of-way and to hinder free and open passage over and use of the specific portion of right-of-way by placing equipment described therein, to the extent and for the duration specified therein. An obstruction in the right-of-way permit allows the permittee to hinder free and open passage over and use of the specified portion of the right-of-way by placing equipment described therein on the right-of-way for the duration specified therein. A small wireless facilities permit allows the permittee to install small wireless facilities in approved locations within the right-of-way. A non-franchise public utility permit allows the public utility to use and/or occupy within a specified city right-of-way and to hinder free and open passage over and use of the specific portion of the right-of-way by placing utility facilities described therein, to the extent and for the duration specified therein. No person may use, occupy, work, excavate or obstruct the right-of-way beyond the date specified in the permit unless such person: Makes a new application for another right-of-way permit before the expiration of the initial permit; and A new permit or permit extension prior to expiration is issued. Except as otherwise provided, no person shall occupy any portion of the right-of-way for the purpose of providing ongoing utility services on other than a temporary basis as provided in an obstruction in right-of-way permit, working in the right-of-way permit, non-franchise public utility permit or small wireless facilities permit, without first obtaining a franchise, license, or lease from the city. Permit applications; plans and specifications; insurance; indemnification. Before any permit may be issued, an application must be made to the director. A permit will be issued only if all of the following conditions have been met and the permit applicant has: Fulfilled all obligations related to prior permits, including, but not limited to, the restoration of the right-of-way, correction of work not in compliance and payment to the city of all money due for the following: Prior permits; Any loss, damage, or expense suffered by the city as a result of the applicant's prior use, occupancy, work, excavations or obstructions of the right-of-way or any emergency actions taken by the city in connection therewith; Restoration of the right-of-way by the city or the city's contractor; and Corrective work completed not in compliance with city policy, supplemental specifications and SUDAS standards, by the city or the city's contractor; and Fines, or administrative or civil penalties assessed to the applicant. Submitted a completed permit application form, which includes all required attachments, and scaled drawings showing the location and area of the proposed project and the location of all existing and proposed equipment and or facilities, and which states or identifies the following: The place, extent and purpose of the contemplated work including the identity of and location in the right-of-way at which any use, occupancy, excavation and/or, work or access is to be made. The time when the work is to be commenced and the time it is to be completed. For whom and in connection with what abutting property, if any, the work is to be performed. To what street main, if any, the sewer, water, or gas connection is to be made or to what electric or communication line, if any, the electric or communication connection is to be made. The location and identity of city existing utilities, overhead and underground. The director may require a certification of plans and specifications by an Iowa licensed professional engineer. Provided as-built maps for all subsurface equipment and/or facilities which it has placed in the right-of-way under outstanding permits. Corrected deficiencies, if any, in prior work performed by applicant or on applicant's behalf. Plans and specifications must be filed with an application for a permit to excavate or work involving the construction or installation of equipment within the right-of-way. Plans and specifications must be in sufficient detail to identify the exact type of equipment to be constructed or installed in the right-of-way. Plans and specifications must include horizontal and vertical location of such equipment within the right-of-way, with respect to right-of-way/property lines and established monuments, which location shall be established on such plans according to available existing records and include temporary traffic control plan. Detailed plans and specifications shall be required for excavation sites, such as water, sewer, gas, electric, or communication connections to a building. Unless required otherwise by the director, including the dimensions of the proposed excavation or work in reference to permanent landmarks, shall be provided for individual excavations or work. If an applicant for a right-of-way permit has previously been found to not be qualified to perform right-of-way restoration work, any permit issued shall contain a provision that the applicant shall immediately notify the director upon completion of the work done in connection with the excavation or work. The applicant shall pay the actual costs that the city incurs in the refilling, replacement of pavement, and restoration and maintenance of the right-of-way by the city work crews or contractor working on behalf of the city. Those costs shall be billed to the applicant following completion of the right-of-way restoration work and paid by the applicant. The applicant shall not be granted any other permit until said costs are paid in full. All permits shall contain a provision that the applicant agree to the Indemnification and liability in accordance with Section 9A.01(q) Permits for the construction or installation of equipment in the right-of-way, which is to be owned or operated by a franchised, permitted or licensed utility, shall be issued in the name of the franchisee, permittee or licensee. If the franchised, permitted or licensed utility has a third-party performing the work, said third-party must be named on the permit and provide a bond for the satisfactory performance of the activity allowed by the permit, including the satisfactory restoration of the right-of-way. Permits for the construction or installation of equipment in the right-of-way, which is to be owned by the city, may be issued in the name of the contractor. Permits for the construction or installation of equipment in the right-of-way, which is to be owned or operated by an abutting property owner, may, in the director's discretion, be issued either in the name of the abutting property owner or the abutting property owner's contractor. Permits for construction in the right-of-way of underground facilities to an abutting property shall be issued in the name of the abutting property owner's contractor. Liability insurance. Before any permit shall be issued, the applicant shall place or have on file in the office of the director a certificate of insurance evidencing the existence of liability insurance deemed adequate by the city to cover the risk presented by the work being undertaken in the right-of-way. The amount and type of insurance to be required in each instance shall be determined by the director, and such requirements are by this reference made part of the permit application form. When the applicant is required by the terms of the permit to work, obstruct or occupy the right-of-way, the insurance shall remain in full force and effect until the maintenance period has expired and work under the permit has been completed. Administrative penalties for violations. The director is authorized to impose administrative penalties, as established by City Council resolution, upon persons who commit any of the following violations: Failure to obtain any permit required by this chapter; Failure to provide required notification of emergency trenching or excavations; Failure to provide required traffic control devices; Failure to restore as required or replace damaged city property within required time limits; Failure to provide required notification; Failure to complete work and/or work not in compliance with city policy, supplemental specifications and SUDAS standards; Failure to comply with Post Televising Requirements and Procedures; Failure to comply with orders issued by the director or the director's designee; Failure to complete work within the time provided in the permit, or within a time extension of the permit granted by the director or the director's designee; Failure to provide accurate, truthful or complete information in making application for a permit; Failure to notify of lane and road closures and openings thereof; or Failure to notify of closures, detours and re-openings for sidewalks and recreational trails. A notice of violation, with the applicable administrative penalty for such violation noted thereon, shall be issued by the director to the violator. Penalties must be paid in full within 30 days of the issuance of the notice. If the person against whom the administrative penalties are assessed fails to correct the violation and pay the scheduled administrative penalty, or the director determines that immediate enforcement action by misdemeanor or municipal infraction prosecution is necessary to achieve compliance with the requirements, the director may institute misdemeanor or municipal infraction proceedings. The director shall maintain a record of all violations, administrative penalties charged or other enforcement actions taken and shall make available such performance record when refusal to issue a permit is being contemplated. The applicant shall be liable for any and all costs incurred by the city because of such violations. Permit fees. Except as otherwise provided herein, a work in the right-of-way permit fee shall be charged to every person who makes application to use, occupy, work and/or excavate in the right-of-way. The work in the right-of-way permit fee shall be established by City Council resolution and shall be in an amount sufficient to recover the following costs, in addition to any other costs deemed appropriate by the director: The inspection cost component; and The GIS cost component, which is the cost of creating and maintaining information on a geographical information system (GIS) mapping system. Except as otherwise provided herein, an obstruction in the right-of-way permit fee shall be charged to every person who makes application to undertake activities in the right-of-way which will result in the obstruction of vehicular or pedestrian traffic. The obstruction permit fee shall be established by City Council resolution and shall be in an amount sufficient to recover the following costs, in addition to any other costs deemed appropriate by the director: The inspection cost component; and The GIS cost component, which is the cost of creating and maintaining information on a geographical information system (GIS) mapping system. A small wireless facilities permit fee shall be charged to every person who makes application to install a small wireless facility in the public right-of-way or public easement. Said fee shall not exceed the amount charged to a telecommunications service provider that is not a wireless service provider or the amount authorized by I.C. 8C.7A (2019) and shall be established by City Council resolution. A non-franchise public utility permit fee shall be charged to every public utility that makes application to install a utility in the public right-of-way. Said fee shall be established by City Council resolution, shall be based upon the city's management costs attributable to the public utility's requested use of the right-of-way and shall include, but not be limited to, the inspection cost component and the GIS cost component, in addition to the right-of-way plan review fee. A system management fee for high-intensity corridors shall be established by the director in an amount sufficient to recover the city's cost for planning, designing, constructing and maintaining the high-intensity corridors. A computation of cost the city will incur from inspectors conducting inspections in the right-of-way impacted by use, occupancy, work, excavation or obstruction. Inspection fees shall be charged by the director to recover the costs incurred by the city in having its inspectors conduct inspections in connection with right-of-way permits issued to permittees. The fee for an inspection of the right-of-way impacted by use, occupy, work, excavation or obstruction shall be a flat fee based on time and expense for an inspector to inspect the permitted use. The fee for a follow-up inspection, conducted to obtain or confirm compliance with a specification, regulation, permit condition or director's order, after a permittee is informed of a violation thereof, shall be in the amount set in the schedule of fees adopted by the City Council by resolution Each follow-up inspection service shall be charged to permittees on the basis of the number of follow-up inspection services with respect to work performed in connection with each permit. A connection fee for sewer and water shall be paid in full by the permittee prior to issuance of a right-of-way permit as provided for by Ch. 12 and 13 of the Cedar Rapids Municipal Code. Permit fees shall be paid by the permittee prior to issuance of the permit. A right-of-way plan review fee shall be charged to any person or applicant who submits plans and specifications for review by the city; provided, however, that an applicant for a small wireless facilities permit shall only be charged such amounts as are authorized by I.C. Ch. 8C (2019). The plan review fee is intended to recover the salary, benefit, and overhead costs to the city of the city employees reviewing such plans and specifications, and shall be based on the size of the area proposed to be impacted. The plan review fee shall be in the amount set in the schedule of fees adopted by the City Council by resolution. When plans and specifications are submitted for review prior to application for a right-of-way permit, the plan review fee shall be paid prior to the director's review and acceptance of such plans and specifications, or prior to city's acceptance of the permit application. If the plans and specifications are submitted for review as part of an application for a right-of-way permit, the plan review fee shall be paid prior to issuance of the permit. Director's authority to waive the annual usage reporting requirement for right-of-way users; authority to estimate equivalent lineal footage of non-reporting user; penalty for under-reporting right-of-way usage. For any year as to which the director determines that the relative change in right-of-way usage by all right-of-way users is insufficient, the director may waive such annual reporting requirement and may utilize the usage reported by right-of-way users for the most recent prior year in which all users were required to report. Such waiver shall be reported to all right-of-way users in lieu of sending a right-of-way usage reporting form to such users. As to any year in which right-of-way usage reporting is not so waived, the failure of the director to send a right-of-way usage reporting form to a right-of-way user shall not excuse such user from the requirement of making such report as herein required. As to any right-of-way user who fails to complete or return a right-of-way usage reporting form as herein required by the term deadline, the director is authorized to calculate the equivalent lineal feet of equipment that such user has in city street right-of-way upon such basis as the director determines is fair and rational. The director is further authorized to verify reported right-of-way usage by right-of-way users by any means the director determines to be fair and rational. As to those right-of-way users who under-report by more than five percent their equivalent lineal feet of right-of-way usage, the director is authorized to recalculate such usage, and such users shall be required to immediately pay any balance in charges owing, with interest thereon at the rate of ten percent per annum. Permit fees which were paid in connection with a permit which the director has revoked for a breach are not refundable. The permit fees to be paid in each instance shall be adopted by City Council by resolution. Issuance of permits. When an application for a permit is made, the certificate of insurance and or the bond is approved and placed on file and the appropriate fees paid, a permit shall be issued to the applicant to allow for the particular use, occupancy, work, excavation and/or obstruction specified in the application to commence. The director may impose conditions, restrictions, or requirements upon the issuance of the permit and the performance of the applicant thereunder in order to protect the public health, safety and welfare; to ensure the structural integrity of the right-of-way; to maximize efficient use of the right-of-way; to protect the property and safety of other users of the right-of-way; and to minimize the disruption and inconvenience to the traveling public, which conditions, restrictions, or requirements shall be stated in the permit or otherwise communicated to the permittee in writing by the director. The permit shall specifically state that it is issued subject to all stipulations of the applicant made in applying for the permit and that the work shall be done in accordance with the detailed plans and specifications approved in connection with the application and in accordance with any and all further conditions, restrictions, or requirements stated on the permit. The permit shall expire at the time stated thereon for completion unless an extension is granted in writing by the director; provided however, that the obligation to restore the right-of-way and the obligation to provide and maintain insurance and bond to the city in connection with such work shall remain in effect until restoration of the right-of-way is completed. Refusal to issue permit. The director may refuse to issue the permits to any former permit holder who has violated the terms of the permit relating to use, occupancy, work, excavations and/or obstruction of any public right-of-way or who has failed to conform to the requirements of any previously issued permit or who has violated the orders or instructions of city officials issued. Records. The department shall keep an electronic copy of each permit issued corresponding to each original permit issued, with the detailed plans and specifications, as approved by city staff. Permits shall be regularly numbered in the order issued. Each permit shall contain the name of the person to whom it is issued, the location of the premises, the purpose of any use, occupancy, work, excavation and/or obstruction and the time at which permit terms shall be commenced and completed. The permit shall not take effect until the time stated therein, nor shall any use, occupancy, work, excavation and/or obstruction be done under it until such time. On-site exhibit of permit; contractor identification signage. One copy of any permit shall be kept and exhibited at every work site for which a right-of-way permit has been issued and shall be immediately available upon request by the city. Utility service companies which provide such service to residential, commercial, and industrial customers on a citywide basis and whose customer or emergency service telephone number is published in a city telephone directory or on-line and is readily available to the public without long distance charge need only display the name of the company on company-owned vehicles and equipment utilized in performing work in the right-of-way. Contractors and their subcontractors working in the right-of-way on behalf of such utility service companies shall display their name, address, and telephone number on all motor vehicles and equipment. Coordination with paving project. If the application for a permit is for the purpose of use, occupancy, work, excavation and/or obstruction the right-of-way for any street ordered by the city to be permanently improved, and/or improved street which was constructed or reconstructed within the preceding five years the applicant shall promptly notify the director of the issuance of the permit so that the permit terms can be coordinated with the work of the paving project as the director deems appropriate. Use, occupancy, work, excavation and/or obstruction under such permit shall in no event commence before the director has approved. A right-of-way permit shall not be issued for sewer or water connections in a permanently improved street within the first ten years or as determined by the director following completion and acceptance by the City Council of the improvement project. In such instances applicants shall determine and submit for approval of the director alternative methods of making the utility service connections; provided, however, the director may give written permission for a permit to be issued in such instances upon determining that one or more of the following conditions exists: An emergency endangering life or property exists which warrants allowing the requested excavation; An interruption of essential utility service is threatened unless the requested excavation is allowed; The public work for which the excavation is requested is mandated by city, state or federal legislation; There is no other reasonable means of providing utility service to a property except by allowing the requested excavation; or The requested excavation is in the best interest of the general public. Right-of-way work and/or restoration; performance and maintenance and bond requirements for right-of-way permit. Restoration required. The work to be done under a right-of-way permit issued and the restoration of the right-of-way as required must be completed within the dates specified in the permit. In addition to its own work, the permittee must restore or pay for the restoration of the general area of the work, and the surrounding areas, including the paving, its foundations and any special features, to its proper and required condition in accordance with the current standards and specifications for construction as adopted by the City Council and right-of-way restoration requirements, unless the director deems other or additional specifications must be utilized in order to secure proper restoration. Temporary restorations are required to restore surface or horizontal areas for safe passage or be marked and isolated until permanent restorations can be completed. Further, the permittee shall inspect the area of the work and use reasonable care to maintain the same condition for 24 months thereafter. If special features in the right-of-way at a proposed excavation site, including, but not limited to, special sidewalk surfaces, heated sidewalks, underground vaults, areaways, and landscaping, cannot be preserved or protected, the city must be notified prior to the applicant beginning work. Performance and maintenance bond for Capital Improvement Projects. An applicant for a right-of-way permit shall, at the time of application for a right-of-way permit, post a performance bond in an amount determined by the director to be sufficient to cover the cost of restoring the right-of-way to its proper and required condition pursuant to the current standards and specifications for construction as adopted by the City Council and in accordance with the current right-of-way restoration cost schedule established by resolution of the City Council. If at the conclusion of the Capital Improvement Project acceptance and required maintenance period of the restoration of the right-of-way, the department determines that the right-of-way has been properly restored, the surety on the performance bond shall be released. Bond and insurance. All users of the right-of-way permit shall, at the time of application for the permit, provide a bond; in accordance with Section 9A.04. If the work is to be performed by the property owner, homeowner's insurance may be substituted for the bond. All contractors and subcontractors permitted in the right-of-way shall maintain an annual bond in an amount determined by the director. For complex projects as determined by director, a bond amount shall be based on engineers estimate. Bond condition. The bond shall be conditioned upon: The faithful performance of the right-of-way restoration work or payment of the restoration costs incurred by the city; and The faithful performance of the terms of the permit, and any other requirements provided by law. If the user fails or neglects to properly restore the right-of-way to its proper condition within the time for completion set forth in the permit, or within a reasonable time (30 days unless extenuating conditions as approved by the director or designee, i.e. weather, act of nature) after notice by the director of such failure or neglect, or fails to pay the restoration costs incurred by the city or fails or neglects to properly maintain the right-of-way to its proper condition within a reasonable time after notice by the director of such failure or neglect, or fails to pay the maintenance costs incurred by the city, the right-of-way shall be restored or maintained by the city and the costs thereof, as certified by the director, shall be promptly paid by the permittee or bonding company as the case may be. Restoration by city or city contractor. If the director determines that an applicant for a right-of-way permit is not able or qualified to perform right-of-way restoration work, the applicant may request in the permit application, to have the city or the city's contractor restore the right-of-way, in which case the applicant shall pay the costs thereof within 30 days of billing. Restoration by permittee. An applicant for a right-of-way permit who has been determined by the director to be qualified to perform right-of-way restoration work and who intends to itself restore the right-of-way shall so indicate in its application for a right-of-way permit. The permittee shall perform the work in accordance with the city's specifications, unless the director deems other or additional specifications must be utilized in order to secure proper restoration. The director shall have the authority to prescribe the manner and extent of the restoration and may do so in written procedures of general application or on a case-by-case basis. The director in exercising this authority shall be guided by the following standards and considerations: the number, size, depth and duration of the excavations, disruptions or damage to the right-of-way; the pre-excavation condition of the right-of-way; the remaining life expectancy of the right-of-way affected by the excavation; whether the relative cost of the method of restoration to the permittee is in reasonable balance with the prevention of the accelerated depreciation of the right-of-way that would otherwise result from the excavation, disturbance or damage to the right-of-way; and the likelihood that the particular method of restoration would be effective in slowing the degradation of the right-of-way that would otherwise take place. Methods of restoration may include but are not limited to patching, replacement of the right-of-way base, and milling and overlay of the entire area of the right-of-way affected by the work. By choosing to restore the right-of-way itself, the permittee guarantees its work and shall maintain it for 48 months following its completion. During this 48-month period, the permittee shall, upon notification from the department, correct all restoration work to the extent necessary using the method required by the department. Such work shall be completed within the period of time allotted therefor as set forth in the notice from the department. If the permittee fails to restore the right-of-way in the manner and to the condition required by the department or fails to satisfactorily and timely complete all repairs required by the department, the city, at its option, may do such work or cause its contractor to do such work. In that event, the permittee shall pay to the city, within 30 days of billing, all costs incurred by the city in restoring the right-of-way. Qualification to perform right-of-way work and/or restoration. The director shall determine the qualifications of permit applicants to perform right-of-way work and/or restoration. In determining if an applicant is qualified to perform right-of-way work and/or restoration, the director shall consider the following factors, which the applicant shall be obligated to demonstrate to the satisfaction of the director: The financial responsibility of the applicant. The city's past record of transactions and experience with the applicant, including the quality of workmanship on past right-of-way work and/or restoration projects; the number of liens, claims or complaints filed regarding such past projects; and the number of repairs made on prior right-of-way work and/or restoration projects involving that applicant. The adequacy of the applicant's equipment and materials. The competency and experience of the applicant's managerial and supervisory personnel in performing right-of-way work and/or restoration. The applicant's demonstrated ability to complete performance of right-of-way restoration work or work of a similar nature. The director may determine that an applicant is not qualified for the performance of right-of-way restoration work if the director determines that the applicant has not demonstrated satisfactory compliance with the criteria set forth hereinabove, or if the director determines that the applicant has: Without good cause therefor failed to carry on or complete prior right-of-way restoration work or work of a similar nature in an acceptable manner or refused to comply with a written order of the engineer with regard thereto within a reasonable time; Failed to perform prior right-of-way restoration work or work of a similar nature in reasonably close conformity with the plans and specifications therefor, or in reasonably close conformity with the city's design standards or the city's utility accommodation and street restoration specifications; Failed or refused to remove and replace materials or work found by the director not to be in reasonably close conformity with the plans and specifications or city's utility accommodation and street restoration specifications, as applicable, or failed to correct such material or work so as to cause such materials or finished product to be reasonably acceptable work; or Offered or given gifts or gratuities to city employees in violation of state law or has had as its employee a person who was at the time also a city employee. Violated air, water quality and/or erosion and sediment control standards in the course of completing previous work. If the director determines not to qualify an applicant to perform right-of-way restoration work, the director shall notify the applicant. The notice shall set forth the reasons supporting the director's determination not to qualify the applicant and shall indicate that the director's determination shall be considered final unless the applicant files a written request for review with the director within 30 days of the applicant's receipt of notice thereof. The notice shall be sent to the applicant by certified mail, return receipt requested to the address indicated on the application. Upon written request of the applicant received within 30 days of mailing of the notice, the director or designee shall schedule and hold a hearing thereon. At such hearing, the applicant may present evidence or argument why it should be qualified to perform right-of-way restoration work. Disqualification of person previously qualified to perform right-of-way work and/or restoration. The director may disqualify any person from the further performance of right-of-way work and/or restoration work upon a determination by the director that the person has failed to meet any of the criteria or has failed to perform restoration work meeting all the applicable standards. Upon making such determination, the director shall give notice to the affected party of his or her determination and shall therein set forth the reasons supporting disqualification and the proposed period for disqualification and shall indicate that the director's determination shall be considered final unless the applicant files a written request for review with the director within 30 days of the applicant's receipt of notice thereof. Upon written request of the affected party received within 30 days after the affected party's receipt of the notice, the director shall schedule and hold a hearing thereon. At such hearing, the affected party may present evidence or argument why it should not be disqualified from performance of right-of-way restoration work. The applicant may reapply for a permit to work in the right-of-way 30 days after all failures to perform identified by the director have been remedied. Any person who has received more than one notice of failure to meet the criteria, or has failed to perform within a one year period may, after notice and being given an opportunity to be heard, be barred applicant from doing any work in the right-of-way for up to 180 days. New permit applications, extensions and amendment. A right-of-way permit is valid only for the area of the right-of-way specified in the permit. No permittee may perform outside specified terms in the permit. Any permittee who determines that an area greater than or less than that specified in the permit must be used, occupied, work, excavated and/or must: Submit application for a new permit and pay any additional fees necessitated thereby; and Be issued a new permit. Non-franchise utility permit amendment is required if the use and occupancy of facilities is greater than or less than specified in permit agreement; fee shall be in the amount set in the schedule of fees adopted by the City Council by resolution. A right-of-way permit is valid only for the dates specified in the permit. No permittee may begin work before the permit start date or continue working after the end date. If a permittee does not finish the work by the permit end date, it must make application for a new permit for the additional time it needs and receive the new permit. An extension of the old permit must be requested prior to the end date of the previous permit. Permittee's other obligations. Obtaining a right-of-way permit does not relieve a permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by any other city, county, state, or federal rules, laws or regulations. A permittee shall comply with all requirements of local, state and federal laws, including I.C. Ch. 480, pertaining to underground facilities information (One Call excavation notice system). A permittee shall perform all work in conformance with all applicable codes and established rules and regulations, and is responsible for all work done in the right-of-way pursuant to its permit, regardless of who performs the work. Except in an emergency and with the approval of the director, no right-of-way tasks may be performed when seasonally prohibited or when conditions are unreasonable for such work. Denial of permit. Mandatory denial. Except in an emergency, no right-of-way permit will be issued: To any person who is disqualified from the further performance of right-of-way work and/or restoration work; To any person who has outstanding debt owed to the city such as penalties, unpaid permit or other fees; To any person as to whom there exists grounds for the revocation of a permit; or If the issuance of a permit for the particular date and/or time would cause a conflict or interfere with an exhibition, celebration, festival, or any other event. The director, in exercising making this determination shall consider the safety and convenience of ordinary travel of the public over the right-of-way, and by considerations relating to the public health, safety and welfare. Permissive denial. The director may deny a permit in order to protect the public health, safety and welfare; to prevent interference with the safety and convenience of ordinary travel over the right-of-way; or when necessary to protect the right-of-way and its users. In determining to deny a permit, the director may, consider one or more of the following factors: the extent to which right-of-way space where the permit is sought is available; the competing demands for the particular space in the right-of-way; the availability of other locations in the right-of-way or in other right-of-way for the equipment of the particular company; the applicability of other regulations of the right-of-way that affect location of equipment in the right-of-way; the degree of compliance of the applicant with the terms and conditions of its franchise or license, and other applicable ordinances and regulations; the degree of disruption to surrounding communities and businesses that will result from the use of that part of the right-of-way; the condition and age of the right-of-way, and whether and when it is scheduled for total or partial reconstruction; and the balancing of the costs of disruption to the public and damage to the right-of-way against the benefits to that part of the public served by the expansion into additional parts of the right-of-way. Discretionary issuance. The director may issue a permit in any case where the permit is necessary to: Prevent substantial economic hardship to a customer of the permit applicant; Allow an applicant's customer to materially improve its utility service; or Allow a new economic development project which receives economic development assistance from the state or city. Denial of a small wireless facility permit. Notwithstanding the foregoing, an application for a small wireless facility permit shall only be denied on the grounds authorized by I.C. Ch. 8C (2019). Construction and installation requirements; certification by permittee. When working in public right-of-way, a permittee shall not unreasonably interfere with the safety, health, and convenience of the public in the public's use thereof for ordinary travel along and over the right-of-way, nor shall a permittee interfere with public safety or public health services provided by the city to its residents by means of the public right-of-way. All work performed in the right-of-way, including, but not limited to, the construction, installation, repair, maintenance, or replacement of equipment, shall be done in conformance with the city's current specifications and design standards. Equipment shall be constructed or installed in the right-of-way at a location and shall be constructed as shown and placed in the location as shown on the plans and specifications therefor submitted in connection with the permit application, unless the permittee makes a written request to the director to approve a change in location of such equipment. In no event shall equipment be constructed or installed in the right-of-way at a location other than that shown on the plans and specifications without the prior written consent of the director. Within 30 days after completing the construction or installation of any equipment for which a permit was required, the permittee shall certify to the director by as-built drawings or inspection reports, that the equipment was constructed or installed at the location shown on the plans and specifications therefor submitted with the permit application or at an alternate location approved by the director. This shall be in addition to the requirement that mapping data be supplemented within six months after completion of the construction or installation of such equipment. Equipment constructed or installed at a location other than shown on the plans and specifications, or at a location other than the alternate location approved by the director, shall be immediately removed or relocated at the direction of the director. No person shall leave or keep open any excavation or vault on, in or under any right-of-way. All excavations and vaults shall be protected in accordance with the city's utility accommodation and street restoration specifications. If the director determines that any equipment placed in the right-of-way constitutes a hazard to the public health and safety, the director order the permittee to remove the equipment. If the permittee fails to do so, the city may do so at the permittee's cost. Inspection. When the work under any permit issued is completed, the permittee shall notify the department inspector following completion. The department inspector may inspect the work under any permit at any time. The permittee shall make the work site available to the department inspector and to all others as authorized by law for inspection at all reasonable times during the execution and upon completion of the work. At the time of inspection, the department inspector may order the immediate cessation of any work which poses an imminent threat to the life, health, safety or well-being of the public. At the time of inspection, the department inspector shall order the immediate cessation of any work if a permit to work in right-of-way has not been issued. The department inspector may issue an order to the permittee to correct any work which does not conform to the applicable standards, conditions, policy or codes. The order shall state that failure to correct the violation will be cause for revocation of the permit. Within ten days after issuance of the order, the permittee shall present proof to the director that work has been corrected. If such proof has not been presented within the required time, the director may revoke the permit, or pursue any other remedy at law or in equity. Work done without permit. Emergency situations. Each applicant shall immediately notify the traffic division of the department of any event regarding its equipment which it considers to be an emergency that affects the vehicular traffic. The applicant may proceed to take whatever actions are necessary in order to respond to the emergency. Within one business day after the occurrence of the emergency, the applicant shall apply for the necessary right-of-way permits, pay the fees associated therewith and fulfill the rest of the requirements necessary to bring itself into compliance for the actions it took in response to the emergency. If a storm, flood, or other citywide emergency event causes system-wide damages to the equipment of a utility service company, requiring emergency repairs without obtaining the necessary right-of-way permits, the director may, upon request by the company sustaining such damage, waive or modify the requirement that permits be obtained after the making of emergency repairs in response to such event. If the director becomes aware of an emergency regarding an applicant's equipment, the department may attempt to contact the local representative of each applicant affected or potentially affected by the emergency. In any event, the department may take whatever action it deems necessary in order to respond to the emergency, the cost of which shall be borne by the applicant whose equipment occasioned the emergency. Nonemergency situations. Except in an emergency, any person who obstructs, works and/or excavates in the right-of-way without a permit must immediately cease work in right-of-way and obtain a permit, additional fees shall be in the amount set in the schedule of fees adopted by the City Council by resolution; in addition the director may assess an administrative penalty against such person. Revocation of permits. The city may revoke any right-of-way permit, without fee refund, for a material breach of the terms and conditions of any statute, ordinance, rule or regulation or any condition of the permit. A material breach by the permittee shall include but not be limited to the following: The violation of any provision of the permit; An evasion or attempt to evade any provision of the permit, including inspection, or the perpetration or attempt to perpetrate any fraud or deceit upon the city or its citizens; Failure to give notice of department inspector or standby; Any error of fact in the application for a permit; The failure to maintain the required bonds and/or insurance; The failure to complete the work in a timely manner; or Failure to complete work in accordance with the city's current specifications and design standards. The failure to correct a condition indicated on an order issued by the director or an inspector. Failure to accommodate the flow of water, and not so obstruct a right-of-way that the natural free and clear passage of water through the gutters or other waterways shall be interfered with. Failure to attain the proper erosion control permit and implement sediment and erosion control practices as required by Cedar Rapids Municipal Code Ch. 71. Failure to implement erosion and sediment control requirements or properly address an unauthorized discharge shall result in an enforcement action as referenced in Cedar Rapids Municipal Code Section 71.14. Work under a permit shall be conducted within the permit area, and work vehicles, equipment and materials shall be stored within the permit area. Private vehicles may not be parked within or adjacent to a permit area. The loading or unloading of trucks adjacent to a permit area is prohibited unless specifically authorized by the permit. ADA accommodations shall be maintained. If the director determines that the permittee has committed a breach of a term of condition of any statute, ordinance, rule, regulation or any condition of the permit, the director, in addition to any other legal or equitable remedies, may order the permittee to remedy such violation. The order shall state that continued violations may be cause for revocation of the permit. In addition, the director, may place additional or revised conditions on the permit. Within 24 hours of receiving notification of the breach, the permittee shall contact the director and at that time provide a plan, acceptable to the director, for its correction. The permittee's failure to contact the director or the permittee's failure to submit an acceptable plan or the permittee's failure to reasonably implement the approved plan shall be cause for immediate revocation of the permit. Revocation of a permit shall constitute grounds for denial of another application of a permit for a period of one year from the date of revocation. If a permit is revoked, the permittee shall also reimburse the city for the city's reasonable costs, including restoration costs and the costs of collection and reasonable attorneys' fees, incurred in connection with such revocation. City's remedies not exclusive. The remedies provided herein are not exclusive or in lieu of other rights and remedies that the city may have at law or in equity. The city is authorized to seek legal and equitable relief for actual or threatened injury to the public right-of-way, including damages to the right-of-way, whether or not caused by a violation of this chapter. Appeal. Appeals of the director's decisions regarding right-of-way permitting maybe made pursuant to 9A.01(v). (034-21)
Ask a question about Cedar Rapids law
Corpus searches the Cedar Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.