§ 21.08.050 — Construction permit—Plans and specifications
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 21.08.050
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/d8fe2db9-3d68-487d-9e98-95d2cd1c75b1
21.08.050 - Construction permit—Plans and specifications
The plans and specifications shall be prepared by a professional engineer and shall be sufficiently detailed and complete as to permit a comprehensive engineering review, including the piping and hydraulic details. The plans shall be drawn to scale and shall accurately show the construction contemplated and all connections to be made to plumbing fixtures. The specifications shall set forth all equipment used, including pumps, chemical feeders, storage tanks, backflow prevention devices, meters, and related apparatus, including the particular specifications describing the quality and functioning of each piece of equipment used.
(Ord. 103095, § 4(b), 1974.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.
