Sec. 9-165. - Cleanup after demolition or removal of structure or buildings.
(a) Within thirty (30) days after any building or structure is demolished or removed from any lot or tract of land: (1) All debris must be removed from the property. (2) All holes or depressions in the ground must be filled to grade level. (3) All lumber, pipes and all other building materials must be removed from the property. (4) All pipes and conduits must be removed from above grade and must be removed or sealed below grade. (5) All piers, pilings, steps, foundations, and other appurtenances must be removed from the property. (b) Each owner and each person having control over the property on which the building or structure stood prior to removal or demolition is individually responsible for completing such work or causing such work to be completed.
(Ord. No. 17-009, § 1(Exh. A), 1-17-17)