§ 24-165 — Moratorium
Code of Ordinances, City of Tupelo, Mississippi (Supp. No. 15: codified through Ordinance of March 5, 2024 and Ordinance of June 4, 2024) · Tupelo Code of Ordinances § 24-165
Corpus is an independent public-information project, not the official City of Tupelo website. Stable reference: corpuslaw.us/code/d97dce89-1625-487b-8251-974fb52c7c2b
Sec. 24-165. - Moratorium.
Excavation, cutting, or digging in, around, under, or through newly created, renovated, or resurfaced city streets is prohibited for five (5) years after the filing of a notice of completion or acceptance of a new street or structural overlay of the street, unless the city engineer determines that such work is justified by one (1) or more of the following situations: (1) Emergency which endangers life or property, such as an occurrence that: a. Endangers the health and safety of property; and b. Requires excavation in order to remediate the emergency; (2) Repair or modification to prevent interruption of essential utility service; (3) Relocation work that is mandated by city, county, state or federal law; (4) Service for buildings where no other reasonable means of providing service exists, as determined by the city engineer or his authorized representative(s); (5) In a city street that the city has scheduled for resurfacing either during the fiscal year when the excavation permit is issued or during the following fiscal year and the work takes place prior to the resurfacing; (6) For potholing to verify utility depth or location; (7) Trenchless excavations greater than three (3) feet in depth of cover over the utility facility not requiring a significant surface incision greater than industry bore pit standards may be allowed at the discretion of the city engineer or his authorized representative(s); (8) New service to a specific location that cannot be provided; a. Through existing conduit; or b. Where trenchless technology is impractical due to one (1) or more of the following: 1. Soil conditions; or 2. Proximity of installations; or 3. Where a large conduit package is being installed; or 4. Where trenchless technology is economically impractical compared to trenching and resurfacing performed in accordance with approved standards; or (9) Approval is granted by the city council; or (10) Other situations deemed by the city engineer or his authorized representative(s), to be in the best interest of the general public.
(Ord. of 10-21-14(1))
Ask a question about Tupelo law
Corpus searches the Tupelo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
