Sec. 43-261. - Maximum permissible slope resulting from excavation.

(a) Limitation. It shall be unlawful to make an excavation or fill which causes a ground slope of more than 2.5 horizontal to one vertical. (b) Exceptions. (1) Slopes whose faces are protected by retaining walls or other systems which are designed by an engineer registered in the State of Nebraska. (2) Slopes whose vertical elevation change is less than six feet. (3) Slopes which are part of an active construction project that has been properly permitted. (4) Slopes of temporary surcharge piles.