For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.12 — Determination of Necessity

Code of the City of Grand Rapids, Michigan (Supp. No. 70: codified through Ordinance No. 2026-08, enacted April 14, 2026) · Grand Rapids City Code § 4.12

Corpus is an independent public-information project, not the official City of Grand Rapids website. Stable reference: corpuslaw.us/code/d9c58b32-a440-4152-836e-9269ecfc9d50

Sec. 4.12. - Determination of Necessity.

The necessity for such sewer and water connections shall be determined by the Director, which determination shall be based upon the size, shape and area of each abutting lot or parcel of land, the lawful use of such land under the zoning regulations of the City, the character of the locality and the probable future development of each abutting lot or parcel of land. The Director shall give written notice of the intention to install such sewer and water connections, and to charge the cost of the same to the premises, to each owner of land abutting the street to be furnished with such connections, as shown by the records of the City Assessor in accordance with Chapter 1 of this Code. Any owner objecting to the installation of any such sewer or water connection shall file his or her objections in writing within seven (7) days after service of such notice with the Director who shall, after considering each such objection made in writing, make a final determination of the sewer and water connections to be installed.

Ask a question about Grand Rapids law

Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.