§ 16-5.02.070 — Permit limitations and conditions
Victorville, California, Municipal Code (Supp. No. 57: codified through Ordinance No. 2466, passed April 7, 2026) · Victorville Municipal Code § 16-5.02.070
Corpus is an independent public-information project, not the official City of Victorville website. Stable reference: corpuslaw.us/code/da1b3a37-e921-4156-be41-0d4007a6a549
Sec. 16-5.02.070: - Permit limitations and conditions
(a) General. A grading permit authorizes only the work which is described in the application for the permit. (b) Responsibility of the Permittee. The permittee and his agents shall carry out the proposed grading in accordance with the approved plans and specifications, the conditions of the permit, the requirements of this Article and all other applicable laws. The permittee and his agents shall maintain required protective devices and temporary drainage and shall observe the site access rules, hours of work, dust controls and haul routes prescribed by subsections (e) and (f). The permittee and his agents shall be responsible for maintaining the site and removing debris. The permittee and his agents and each or all of them are subject to the penalties for violation set forth in this Article. Permit approval does not relieve the permittee or his agents from complying with the provisions and intent of this Article. (c) Liability. (1) The issuance of a permit does not impose liability for damages on the City. (2) Compliance with the terms and conditions of a permit and with the provisions of this Article do not relieve the permittee and his agents from responsibility for damages. (d) Jurisdiction of Other Agencies. A permit issued under this Article does not relieve the owner of responsibility for securing permits required by any other law, department or division of the City, County or State. (e) Regulation of Work. The Building Official may impose conditions on the permit with respect to access to the grading site, hours of work, methods of controlling dust and safety precautions for pedestrians or vehicles. (f) Haul Routes. A permit issued for the export or import of earth materials to or from a grading site shall require that: (1) The size or type of hauling equipment be limited in accordance with the width and strength of the street; (2) Traffic control devices be used at appropriate places along the designated access route; (3) Temporary parking restrictions be imposed along access routes by the Director of public works when necessary; (4) Equipment used to haul earth to or from a grading site comply with the California Vehicle Code; (5) All loads be properly trimmed and watered, covered or otherwise secured; (6) The haul route take into consideration the most practical means of transporting the earth materials to or from the grading site consistent with the safety and welfare of residents along the route; and (7) Other conditions necessary for public health, safety and welfare be imposed. (g) Time Limit. (1) The permittee shall fully perform and complete all of the work contemplated within the time specified in the permit. Slopes must be fully stabilized. (2) Once grading has commenced, it must be pursued with diligence and completed within the time specified. If grading activity ceases for ninety days the applicant shall notify the Building Official in writing explaining the reason for the delay. Should the project be discontinued or abandoned in excess of one hundred eighty days, the City may use the performance bonds to take necessary precautions to ensure the health and safety of the public. Cessation of grading activity during rain, snow or other inclement conditions, is not failure of performance. (3) If the permittee is unable to complete the work within the specified time, he may submit a written request for an extension of time before the permit expires. If sufficient justification is shown, the time specified on the permit may be extended for a period of one hundred eighty days or as approved by the Building Official. This extension does not release the surety upon the bond. (h) Entry Upon Grading Site. (1) The Building Official, City Manager, City Engineer, the surety company or their representatives shall have access to the premises described in the permit for the purposes of inspecting the progress of the work. (2) In the event of default in the performance of any term or condition of the permit, the surety, or any person employed or engaged in his behalf, has the right to go upon the premises and complete the required work, including the installation of temporary erosion control devices and landscaping. (3) It is unlawful for anyone to interfere with an authorized representative of the City or the surety company. (i) Consent of Adjacent Property Owners. If a grading operation requires entry onto adjacent property, the permit applicant must obtain the written consent of the adjacent property owner and file a copy of the consent with the Building Official before a grading permit will be issued.
Ask a question about Victorville law
Corpus searches the Victorville sections it holds and shows the ones that match, with their citations. Free, no sign-in.