For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.28.060 — INTERPRETATION, PERMIT PROCEDURE, APPEALS, GROUNDS FOR DENIAL, AND ENFORCEMENT ACTIONS

City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 18.28.060

Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/da9b11a4-564a-4d57-af79-f5994b29d85e

18.28.060: INTERPRETATION, PERMIT PROCEDURE, APPEALS, GROUNDS FOR DENIAL, AND ENFORCEMENT ACTIONS:

A. Interpretation; Conflicts: 1. Minimum Requirements: In their interpretation and application, provisions of this chapter shall be held to be minimum requirements, except where expressly stated to be maximum requirements. No intent is made to impair, or interfere with, any private restrictions placed upon any property by covenant or deed; provided, however, that where this chapter imposes higher standards or greater restrictions the provisions of this chapter shall govern. 2. Application of Most Restrictive Standard: Whenever any provision of this chapter or any other provision of law, whether set forth in this chapter or in any other law, ordinance, or resolution of any kind, imposes overlapping or contradictory regulations over the development of land, the most restrictive standards or requirements shall govern. B. Retention of Plans: Plans, specifications, and reports for all site development submitted to Salt Lake City for approval shall be retained by Salt Lake City. C. Expiration, Renewals, and Extensions of Permit: Every site development permit or approval shall expire by limitation and become null and void if the work authorized by such permit or approvals has not been commenced within 180 days, or if the work is suspended or abandoned for a period of 180 days at any time after the work is commenced. Before such work can recommence, the permit shall first be renewed by the building official and the renewal fee shall be 1/2 the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans or scope of such work, otherwise a full fee may be required as determined by the building official. Any modifications to the original approved work that is related to a development for which the Salt Lake City planning commission granted approval, may require subsequent review and decision by the planning commission as determined by the planning director. D. Appeals: 1. Filing: Any applicant aggrieved by a determination of any administrative official in relation to this chapter may appeal such determination to the board of appeals and examiners pursuant to Chapter 18.12. 2. Effect of Administrative Appeal: In the event of an appeal pursuant to the provisions above, the effect of such filing shall act to stay any and all further action and work pending the determination of the matter on appeal. E. General Grounds for Denial: Factors, in addition to deviation from provisions of this chapter, which may be grounds for denial of a site development permit or approval shall include, but not be limited to: 1. Possible or potential saturation of fill and/or unsupported cuts by water (both natural and/or domestic); 2. Runoff surface waters that produce unreasonable erosion and/or silting of drainageways; 3. Subsurface conditions (such as rock strata and faults, soil or rock materials, types of formations, etc.) which when disturbed by the proposed site development activity, may create earth movement and/or produce slopes that cannot be landscaped; 4. Result in excessive and unnecessary scarring of the natural landscape through grading or removal of vegetation. F. Prohibited Activities: 1. Removal of Topsoil: It shall be unlawful to remove topsoil for purposes of resale when unrelated to a bona fide purpose of site development contemplated under this chapter. The provisions of this chapter shall not be construed as permitting the removal of topsoil solely for resale. 2. Nuisance: It shall be unlawful to create or maintain a condition which creates a public or private nuisance. After notice by the city, owners shall be strictly responsible to take any necessary action to correct or abate such nuisance. Further, this chapter shall not be construed to authorize any person or owner to create or maintain a private or public nuisance upon real property and compliance with the provisions of this chapter shall not be a defense in any action to abate such nuisance. G. Permit or Approval Revocation: In the event the building official or city engineer revokes a site development permit any aggrieved party may appeal such decision pursuant to Chapter 18.12. H. Property Owner Responsibility: Property owners are responsible to maintain their property in a safe, nonhazardous, condition and to otherwise comply with the provisions of this chapter and other applicable ordinances. Failure of city officials to observe or to recognize hazardous or unsightly conditions, or to recommend denial of the site development permit, shall not relieve the permittee, or property owner, from responsibility for the condition or damages resulting therefrom. Nor shall such action result in the city, its officers, or agents, becoming responsible or liable for conditions and damages resulting therefrom. I. Obstruction Prohibited: It shall be unlawful for any person to willfully or carelessly obstruct or injure any public right of way by causing or permitting earth or rock to slump, slough, or erode off private property onto the public right of way. J. Flooding: It shall be unlawful for any person to willfully or carelessly obstruct or injure any public right of way by causing or permitting flow or seepage of water, or by willfully or carelessly causing or permitting water under his/her control, possession, or supervision to escape in any manner so as to injure any street or public improvement. K. Violation And Penalties: It shall be unlawful for any person to construct, enlarge, alter, repair, or maintain any grading, excavation or fill or cause the same to be done, contrary to or in violation of any provision of this chapter. (Ord. 91- 24, 2024: Ord. 7-14, 2014)

Ask a question about Salt Lake City law

Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.