25.05.172 - Planned actions—Project review

A. Planned action project review shall include: 1. Verification that the project meets the description in, and will implement any applicable conditions or mitigation measures identified in, the designating ordinance; and 2. Verification that the probable significant adverse environmental impacts of the project have been adequately addressed in the EIS prepared under subsection 25.05.164.B through review of an environmental checklist or other project review form as specified in Section 25.05.315, filed with the project application. B. 1. If the project meets the requirements of subsection 25.05.172.A, the project shall qualify as the planned action designated by the City, and a project threshold determination or EIS is not required. Nothing in this Section 25.05.172 limits the City as lead agency from using this Chapter 25.05 or other applicable laws to place conditions on the project in order to mitigate nonsignificant impacts through the normal local project review and permitting process. 2. If the project does not meet the requirements of subsection 25.05.172.A, the project is not a planned action and a threshold determination is required. In conducting the additional environmental review under this Chapter 25.05, the lead agency may use information in existing environmental documents, including the EIS used to designate the planned action (refer to subsection 25.05.330.B.1 and Sections 25.05.600 through 25.05.635). If an EIS or SEIS is prepared on the proposed project, its scope is limited to those probable significant adverse environmental impacts that were not adequately addressed in the EIS used to designate the planned action. C. Public notice for projects that qualify as planned actions shall be based on the notice requirements of the underlying permit. If notice is otherwise required for the underlying permit, the notice shall state that the project has qualified as a planned action.

(Ord. 119096, § 17, 1998.)