Requirements for new construction abutting improved streets.
Salem Revised Code § 78.180
in effectSec. 78.180. - Requirements for new construction abutting improved streets.
(a) Except as otherwise provided by SRC 78.192, every property owner whose property abuts upon any street that has been improved with hard surface pavement and curbs, shall construct a sidewalk and replace non-conforming portions of existing sidewalk in conformance with the provisions of this chapter within 100 days from the completion of construction of any building located upon the property. For the purposes of this section, sidewalks shall be required along the entire length of the property abutting any improved street. As used in this section, the term "building" shall not include accessory buildings, as defined in SRC 111.005, in a residential zone.
(b) Whenever any property owner refuses to perform any duty imposed under this section, the Director shall issue a notice and order the property owner to satisfy such duty, and if the property owner fails to perform such duty within such time as the Director may have specified in the notice and order, then the Director shall proceed as provided in SRC 78.300.
(Prior Code, § 78.180; Ord. No. 5816; Ord. No. 6965; Ord. No. 152-76; Ord. No. 84-79; Ord. No. 127-84; Ord. No. 17-92; Ord. No. 72-2002; Ord. No. 99-07; Ord. No. 31-13; Eng. Ord. No. 15-18, § 3, 8-27-2018, eff. 9-26-2018)
Source: City of Salem, Oregon, Salem Revised Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/or/salem/codes/code_of_ordinances?nodeId=PTIICOOR_TITVIIPESTPUWA_CH78SI_S78.180RENECOABIMSTFetched: 11/7/2026
