San José Municipal Code § 4.78.450 Monthly reports.
4.78.450 - Monthly reports.
A. The solid waste disposal facility operator shall submit to the director of finance a monthly report, together with supporting documentation, containing all of the following information:
1. The month covered by the report.
2. The total tonnage of solid waste accepted at the facility during the month.
3. The total tonnage of recyclable material accepted at the facility and taken directly to a certified recycling processing area during the month.
4. The total tonnage of residues generated during the month from the recycling processing.
5. The total tonnage of material salvaged from the solid wastes accepted at the facility and shipped offsite during the month.
6. The total tonnage of recycled materials shipped offsite during the month.
7. The total tonnage of cover material that originated from any offsite location and was accepted at the facility during the month.
8. The total tonnage of inert construction material that originated from any offsite location and was accepted at the facility during the month.
9. The number of small loads accepted at the facility during the month, the number of cubic yards of solid wastes accepted from small loads during the month, and the tonnage of wastes accepted from small loads during the month.
B. The due date for the monthly report is the due date for the remittance of the disposal facility tax described in Section 4.78.230. The monthly report shall be deemed timely submitted if it is submitted to the office of the director of finance on or before the due date or if it is mailed in accordance with subsection A. of Section 4.78.240.
(Ord. 24133.)
