§ 523.26 Distributed Generation Net Billing
(a) Applicability. Distributed Generation Net Billing shall be available to residential and non-residential customers who: (1) Purchase their requirements of electric service from Cleveland Public Power under the applicable rate schedule; (2) Own and operate distributed generation as defined in Section 523.25 that uses Advanced Energy Resources; and (3) Are interconnected according to the terms of Section 523.25. (b) Definitions. As used in this section: (1) “Advanced Energy Resources” means generation produced by fuel cells, waste-to energy generation, low-impact hydropower, wind power, biomass, solar power, landfill gas, solar photovoltaic, batteries, or solar thermal resources. (2) “Customer Owned Generation Credit” is the credit Cleveland Public Power shall provide to the owner of distributed generation when the energy supplied by the customer’s distributed generation exceeds the amount of energy consumed by the customer in a billing period. (3) “Distributed Generation Net Billing” is a method of measuring the difference, positive or negative, between the kilowatt hours of electricity supplied by Cleveland Public Power to the customer through Cleveland Public Power's electric distribution system and the kilowatt hours of electricity generated by the customer’s distributed generation that is fed back into Cleveland Public Power’s electric distribution system. (c) Design and Installation. To best operate the utility system, distributed generation should be designed and installed as near as possible to meet the premise load; as the Division deems appropriate for safety and reliability purposes. (d) Billing and Charges. (1) The customer shall pay Cleveland Public Power for all electric services as identified in the applicable rate schedule. (2) The energy supplied by the customer’s distributed generation will reduce the Power Supply Recovery charged as defined in Section 523.21 up to the amount consumed by the customer in the billing period for accounts charged under Sections 523.02 through 523.047. For accounts that are charged under Sections 523.049 through 523.0491, the customer’s distributed generation will reduce the embedded purchased power rate, transmission, and other charges due as defined in the applicable rate schedule. (3) The energy supplied by the customer’s distributed generation in excess of the amount consumed by the customer will be credited to the customer based on the Customer Owned Generation Credit. The Customer Owned Generation Credit will be calculated based on Cleveland Public Power's power costs, which shall not include transmission, capacity, or any other costs to deliver to customer. This rate will be determined and updated at the time the Power Supply Recovery is updated as directed in Section 523.21 for accounts billed under Sections 523.02 through 523.0491. (4) Effective upon passage, any existing kWh credit will be converted to a non-refundable monetary credit calculated in accordance with Section 523.26(d)(3) for Customer Owned Generation Credits, which shall be applied to the customer’s account within two years of the Effective Date. If on December 31, 2028, any credit earned prior to the Effective Date remains, said credit shall be forfeited and removed from the customer’s account. (5) If the Customer Owned Generation Credit in any month exceeds the amount of the customer’s monthly bill, the surplus will be applied as a non-refundable monetary credit to the customer’s account. Any unused credits remaining on December 31st of each calendar year shall not be carried over to the new year and will be removed from the account and forfeited. (6) If a customer terminates service, any remaining credit balance in favor of the customer shall be removed and forfeited with no liability to Cleveland Public Power. Participating customers shall be subject to all other charges, rates, terms and conditions of the applicable rate schedule except as expressly altered by this rate schedule. (e) Application. Customers requesting service under this schedule must submit a written application for interconnection pursuant to Section 523.25. (Ord. No. 588-2026. Passed 7-15-26, eff. 7-20-26)
Ask a question about Cleveland law
Corpus searches the Cleveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.