Large Industrial Campus.
Boulder Revised Code 1981 § 10-7.7-8
in effect10-7.7-8. - Large Industrial Campus.
(a) The owner of a large industrial campus shall on or before June 1, 2016 and on or before June 1 in each year thereafter submit to the city manager the following information:
(1) A written narrative description, which will be publicly disclosed, including the following:
(A) The industrial campus energy usage reduction goals and emission reduction goals, both at the large industrial campus and at the corporate level; and
(B) A summary of energy efficiency or on-site renewable energy projects implemented in the reporting year.
(2) An oral report or presentation (the "Annual Report") of the following information provided during an annual meeting between the large industrial campus and city staff members who are identified in an agreement executed pursuant to Section 10-7.7(d), B.R.C:
(A) A qualitative comparison of energy usage in the reporting year with the preceding year and an explanation of the reason for any substantial (more than 2.5 percent) change;
(B) Using a formula supplied by the city manager, the percentage of total energy savings during the reporting year. Supporting documentation for this calculation must be disclosed to the city during this annual meeting; and
(C) The Annual Report shall be treated as confidential in accordance with the terms of the agreement executed pursuant to Section 10-7.7-7(d).
(b) The owner of a large industrial campus shall:
(1) On or before June 1, 2019 and at least once every ten years thereafter, conduct an energy assessment that covers at least seventy-five percent of the total energy usage on the large industrial campus; and
(2) Within two years after each assessment, the owner must implement any measures recommended that are projected to produce monetary savings over a one-year period equal to or in excess of the cost of implementation, less the value of rebates.
(c) By June 1, 2025, each owner of a large industrial campus shall:
(1) Replace or upgrade any interior lighting fixtures necessary to meet the lighting power allowances for interior lighting established in the 2017 City of Boulder Energy Conservation Code.
(2) Replace or upgrade any exterior lighting fixtures as necessary to meet the lighting power allowances for exterior lighting established in the 2012 International Energy Conservation Code.
(3) Comply with the requirements for automatic time switch control devices, occupancy sensors, and exterior lighting controls as necessary to meet the 2017 City of Boulder Energy Conservation Code.
(4) Provide to the city manager a summary of any actions taken pursuant to this subsection. The city manager may grant an owner of a large industrial campus a reasonable extension of time in which to comply with this upon proof of technical difficulties or financial hardship.
(d) An owner of a large industrial complex shall be exempt from the requirements of subsections (b) and (c) above, if:
(1) The owner demonstrates to the city manager that energy efficiency measures or on-site renewable energy sources produced a reduction of total energy usage of at least two and a half percent, annualized over four years; or
(2) The owner demonstrates that it has established an energy or greenhouse gas emission reduction goal for the large industrial campus that is equivalent to that set forth in Section 10-7.7-8(d)(1) and the large industrial campus is making adequate progress toward that goal, as determined by the city manager.
Ordinance Nos. 8071 (2015); 8112 (2016); 8135 (2016); 8279 (2018); 8366 (2020); 8629 (2024)
Source: City of Boulder, Colorado, Revised Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/co/boulder/codes/municipal_code?nodeId=TIT10ST_CH7.7COINENEF_10-7.7-8LAINCAFetched: 11/14/2026
