§ 22.170.060 — Grading permit required
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.170.060
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/ddcf94fe-b72e-441a-abc5-155e1e2db203
22.170.060 - Grading permit required
A. Grading permit required. Except as otherwise specifically provided in this code, a grading permit shall be obtained from the Director before commencing any activity for which a permit is required as specified in subsection 22.170.060.A. The required grading permit may be a component of a building permit, and, in this case, a separate grading permit is not required. The provisions of this code apply to both a separate grading permit and a grading permit that is a component of a building permit except as expressly otherwise stated. Actions exempt from the requirement for a grading permit are specified in subsection 22.170.060.B. 1. General. A grading permit is required prior to any of the actions in subsection 22.170.060.A.1, whether or not the site is subject to any other provision of subsection 22.170.060.A: a. Changing existing grade at any location more than 4 feet measured vertically, if the combined volume of excavation, filling, and other movement of earth material on a site is more than 50 cubic yards; b. Changing the existing grade at any location more than 4 feet measured vertically, if the grading will result in a permanent slope steeper than 3 horizontal to 1 vertical; c. Changing the existing grade at any location more than 4 feet measured vertically, if there will be a temporary slope steeper than 1 horizontal to 1 vertical; d. Any grading if the combined volume of excavation, filling, and other movement of earth material exceeds 500 cubic yards; e. 5,000 square feet or more of land disturbing activity on a site; f. 750 square feet or more of new plus replaced hard surface. g. Extracting groundwater from a well dewatering system. 2. Shoreline District. In the Shoreline District as established in Section 23.60A.010 a grading permit is required: a. If there will be any grading of lands covered by water; b. If there will be any land disturbing activity within 100 feet of the ordinary high water mark; or c. If the combined volume of excavation, filling, and other movement of earth material is more than 25 cubic yards in the area between 100 and 200 feet of the ordinary high water mark. 3. Environmentally critical areas and buffers. A grading permit is required for: a. Any land disturbing activity in riparian corridors, wetlands, wetland buffers, and shoreline buffers; b. Land disturbing activity in liquefaction-prone areas, abandoned landfills, seismic hazards areas, peat settlement-prone areas, and volcanic hazard areas, if any threshold in subsection 22.170.060.A.1 is met or exceeded; c. Land disturbing activity in any environmentally critical area not listed in subsections 22.170.060.A.3.a and 22.170.060.A.3.b, if the combined volume of excavation, filling, and other movement of earth material is more than 25 cubic yards or grading reaches any threshold in subsection 22.170.060.A.1. 4. Potentially hazardous locations. A grading permit is required for any volume of excavation, filling, or other movement of earth material in potentially hazardous locations as defined in Section 22.170.050. 5. In-place ground modification. A grading permit is required for any in-place ground modification. The Director may waive the requirement for a grading permit if the Director determines the in-place ground modification will be insignificant in amount or type. 6. Temporary stockpiles. A grading permit is required for temporary stockpiles that meet or exceed any applicable threshold of subsection 22.170.060.A.1 through 22.170.060.A.5 and that are not located on sites for which a valid grading permit has been issued. 7. Grading near public places. A grading permit is required to excavate or fill in excess of 3 feet, measured vertically, on private property within any area between the vertical prolongation of the margin of a public place, and a 100 percent slope line (45 degrees from a horizontal line) from the existing elevation of the margin of a public place to the proposed elevation of the private property. See Sections 15.44.020 and 15.44.030. B. Exemptions. A grading permit is not required for the activities listed in this subsection 22.170.060.B. 1. Activity conducted in the public right of way by a City agency, or under a street use permit that specifically authorizes the activity; 2. Excavation and filling of cemetery graves; 3. Exploratory excavations that comply with the requirements of subsection 22.170.190.N; 4. Operation of sewage treatment plant sludge settling ponds; 5. Operation of surface mines for the extraction of mineral and earth materials subject to the regulations and under a permit of the State of Washington; 6. Stockpiling and handling of earth material when the earth material is consumed or produced in a process that is the principal use of the site and that complies with the requirements of subsection 22.170.190.M; 7. Maintenance or reconstruction of active tracks and yards of a railroad in interstate commerce within its existing right-of-way; 8. Maintenance or reconstruction of the facilities of parks and playgrounds including work required for the protection, repair, replacement, or reconstruction of any existing paths, trails, sidewalks, public improvement or public or private utility, and the stockpiling of material for these maintenance and reconstruction activities; 9. Excavation and filling of post holes; 10. Trenching and backfilling for the reconstruction or repair of existing utilities on property other than a public right-of-way that includes replacing the ground surface with in-kind material or materials with similar runoff characteristics; 11. Trenching and backfilling the installation of utilities on property other than a public right-of-way or an environmentally critical area that includes replacing the ground surface with in-kind material or materials with similar runoff characteristics, except that installation of drainage systems and facilities for short plats and subdivisions that are subject to subsection 22.805.010.D are not exempt; 12. Grading done as part of a City public works project (see also Section 22.800.070); 13. Public works and other publicly funded activities on property owned by public entities, when all of the following conditions are satisfied: a. Stormwater discharges from the property do not enter the public drainage control system or the public combined sewer system; b. The project will not undercut or otherwise endanger adjacent property; and c. The Director has waived grading permit requirements by interagency agreement; 14. Development undertaken by the Washington State Department of Transportation in state highway right-of-way that complies with standards established pursuant to chapter 173-270 WAC; 15. On-site work required for construction, repair, repaving, replacement, or reconstruction of an existing road, street, or utility installation in a public right-of-way; 16. Pavement maintenance practices with no change to drainage patterns or existing discharge points limited to the following activities; a. Pothole and square cut patching; b. Overlaying existing asphalt or concrete or brick pavement with asphalt or concrete without expanding the area of coverage; c. Shoulder grading; d. Reshaping or regrading drainage ditches; e. Crack sealing; and f. Vegetation maintenance. C. Compliance required. All grading and other land disturbing activity, whether or not it requires a grading permit, shall comply with the provisions of this code, the Stormwater Code, and all other applicable laws.
(Ord. 126357, § 3, 2021; Ord. 123107, § 1, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.