§ 75-303 — Standards for stormwater quantity management
Code of Ordinances, City of Winston-Salem, North Carolina (Supp. No. 103: codified through Ordinance No. 26-0283, enacted June 22, 2026) · Winston-Salem Code of Ordinances § 75-303
Corpus is an independent public-information project, not the official City of Winston-Salem website. Stable reference: corpuslaw.us/code/de209b20-3201-489b-800b-275940925982
Sec. 75-303. - Standards for stormwater quantity management.
If a project has been found to require mitigation of stormwater quantity impacts following review per subsection 75-203(b), and in order to mitigate adverse impacts of stormwater runoff from a development or redevelopment, the stormwater management system prepared by the owner shall be designed to meet the criteria described in this section and shall satisfy the review criteria set forth in subsection 75-203(b). (a) Design storm events. The quantity of stormwater runoff from a development or redevelopment shall be based on the two-year, ten-year, and 25-year storm events, of minimum six-hour duration. Depending upon site conditions, storm duration may be lengthened. (b) Peak discharge control. Post construction peak discharge rates in the two-year, ten-year, and 25-year storm events shall be controlled so as not to exceed pre-development or pre-redevelopment peak discharge rates for the same storm events. (c) Volume control. A stormwater runoff volume equal to the difference between the pre-development or pre-redevelopment and post construction volume for the 25-year event, six-hour duration, shall be detained on site so that the detention basin(s), or other appropriate structural BMP, releases detained stormwater over a period of at least 48 hours (two days) and no longer than 120 hours (five days). (d) 100-year flood potential. The development or redevelopment shall not increase flooding impacts to structures on properties upstream and downstream of the site during a 100-year flood event. (e) Protection of point of discharge. Discharge from any on-site stormwater management system into any natural or surface drainage channel or feature, shall be designed and constructed so that the discharge does not cause damage to the receiving system. (f) Protection of receiving channels and water bodies. Receiving natural channels and water bodies (on-site and/or off-site) shall be evaluated to ensure that downstream conveyances are not eroded and/or degraded by altered stormwater flows from development or redevelopment. Mitigation measures shall be implemented where the volume of runoff from a post construction, two-year, one-hour rainfall event is ten percent greater than the volume of runoff from a pre-development or pre-redevelopment, two-year, one-hour rainfall event. Acceptable mitigation alternatives include on-site detention to reduce post construction runoff rates and volumes and natural channel stabilization measures to control channel degradation. Where allowed by other state and federal agencies (e.g. U.S. Army Corps of engineers and the department), armoring of receiving channels is permissible. (g) Design of water impounding structures (dams). Any proposed water impounding structure (dam) shall be designed in accordance with North Carolina Dam Safety standards, and if required, shall be reviewed and approved by the North Carolina Dam Safety Engineer. Proof of compliance with this requirement shall be provided by the applicant before the building inspector may issue a certificate of compliance.
(Ord. No. 4618, § 1, 5-19-08)
Ask a question about Winston-Salem law
Corpus searches the Winston-Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.