PB18-3 — Regional opportunity facilities
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Park and Recreation Board Code of Ordinances § PB18-3
Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/de644a05-6b4b-4c04-8631-d988ec12388f
PB18-3. - Regional opportunity facilities.
Each regional facility shall be classified as to whether it is an existing part of the regional park system or whether it is a "Regional Opportunity Facility." Regional opportunity facilities are those that are not yet substantially connected into the regional park and trail system, either because of limited land control by the Minneapolis Park and Recreation Board through ownership or agreements, or because of incomplete pedestrian and bicycle connections to and between other regional facilities. Regional opportunity facilities shall collectively be allocated a minimum of twenty-five (25) percent of general regional park capital funds, calculated as an average across any given six-year capital improvement plan cycle beginning with the 2023 funding year. General regional parks and trails capital funds include State of Minnesota and Metropolitan Council regional park bonds, Parks and Trails Legacy Fund allocations, and any other capital funds allocated to the Minneapolis system as a whole. Not included in this calculation are private donations, grants, or other funding targeted to specific parks or trails. Land acquisition funds outside of the named funding sources above are not included in this calculation. Regional opportunity facilities shall be considered part of the existing system (see PB18-4) at which time they satisfy all specific criteria, which shall be based on the adopted master plan for that facility, and are listed below. A. Grand rounds missing link criteria for incorporation into existing regional system 1. An off-street pedestrian and bicycle route that connects, according to the adopted master plan, from East River Road to St. Anthony Parkway 2. Land control by MPRB of the entire route described in (1), either through ownership, permanent easement, or permanent use agreement with another public or private entity 3. Parkway-style vegetation, as described in the adopted master plan, along fifty (50) percent of the length of the route B. Above the falls regional park criteria for incorporation into the existing regional system 1. An off-street pedestrian and bicycle route that connects, according to the adopted master plan, from Plymouth Avenue to St. Anthony Parkway or North Mississippi Regional Park 2. Land control by MPRB of the entire route described in (1), either through ownership, permanent easement, or permanent use agreement with another public or private entity 3. Creation of four (4) recreational areas within the boundary of the regional park, according to the requirements of the adopted master plan Allocations to the regional opportunity facilities shall be determined by factors including overall impact of the investment, actual costs of improvements, the opportunity to leverage additional funding, and criteria included in PB18-4. Proposed allocations shall be presented to the Minneapolis Park and Recreation Board of Commissioners annually with the Superintendent's Recommended Budget, as part of the six-year capital improvement plan. (Pk. Bd. Ord. No. 2017-101, § 1, 8-16-17)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
