Sec. 82-103. - Attachment of utility facilities to bridges.

General. The attachment of the utility lines to bridges should be avoided where it is feasible and reasonable to locate the utility lines elsewhere. However, where other locations prove to be extremely difficult and unreasonable costly, consideration will be given to allowing the utility line to be attached to a bridge structure by a method acceptable to the city, the engineer and the State Aid Division of the Mississippi Department of Transportation if applicable. Such consideration shall conform to logical and sound engineering principles for preserving the highway structure, its safe operation, maintenance, and appearance. Permission for utilities to be attached to bridges will be obtained through the normal permit process. The following provisions should be adhered to: (a) Each proposed bridge attachment shall be considered on its merits and shall be separately designed. Such attachment will not be considered unless the structure in question is of a design that is adequate to support the utility facility without compromise of highway features, including reasonable ease of bridge maintenance. (b) Utility facility mountings must be of a type that will prevent rattling of the lines under traffic vibrations. (c) Utility installations that would reduce the vertical clearance—otherwise available—above streams, pavements, or rails will not be permitted. (d) On pipelines carrying liquids, gases, and other petroleum products, the utility company shall be responsible for designing the lines so as to eliminate the need for encasement. The lines shall also be designed and attached in such a manner as will prevent corrosion to the concrete and steel members of the bridge. (e) Proposed bridges may be designed over and above normal standards to carry the additional loading of utility lines provided the additional costs involved are borne by the utility. (f) At no time shall the utilities run temporary or permanent pipes or cables on any part of a bridge without prior written approval.

(Ord. of 05-15-2007(2) )