§ 19.11 — ELECTRIC PERMIT FEE SCHEDULE
Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 19.11
Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/df5f46d9-addc-4953-ba4b-73bbbceff351
19.11 - ELECTRIC PERMIT FEE SCHEDULE.
Fee Schedule. Penalty for failure to obtain a permit before starting work shall be double the fees. This shall be in addition to any other penalties provided elsewhere in this Ordinance; in addition, a penalty of one hundred dollars ($100) shall be assessed for each day that any work requiring a permit progresses without a permit, calculated from the date the stop work notification is delivered to either the property owner or the contractor performing the work, until the date a permit is obtained. When an application is submitted for a property where only the shell of the property is to be completed, the fee will be calculated at fifty percent (50%) of the total fee for that particular fee group. When an application is submitted for construction of the interior of a building where the shell of the building has been previously granted a permit, the fees shall be based on the square footage of that space as a percentage of the entire square footage of the subject building and that fee shall be calculated at fifty percent (50%) of the total fee for that particular fee group. Project Type | Fees (Round up all fees to the next highest dollar) Group I - New Residential | $.09 per sq. ft. Minimum Fee $25.00 | The use group shall include new construction and any additions to all single or two-family residential buildings and to all commercial building space classified as R-2, R-3, or R4. Group II - New Commercial Non Residential | $.11 per sq. ft. Minimum Fee $25.00 | The use group shall include new construction and any additions to all commercial building space classified as A-1, A-2, A-3, A-4, A-5, B, E, H-1, H-2, H-3, H-4, H-5, I-1, I-2, I-3, I-4, M, or R-1. Group III - New Industrial | $.06 per sq. ft. Minimum Fee $25.00 | The use group shall include new construction and any additions to all commercial building space classified as F1, F2, S-1, S-2, or U and other buildings not classified in Groups I, II and IV. Group IV - Alterations And Special Fees | $25.00 first ten (10) openings $1.00 each additional opening | The use group shall include all alterations and repairs to existing structures. Openings include switches, convenience outlets, fixtures, and fixed appliance connections. Electric Service Replacement | $50.00 per service panel | The fees for a change of location or replacement of equipment on the same premises shall be the same as that for a new installation.
(Rpld and Recreated by ORD-21-00026, 3-26-21)
Ask a question about Madison law
Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.