For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 28-231 — Enterprise permit applications

Houston Code of Ordinances (Supp. No. 93, Update 2: codified through Ordinance No. 2026-0732, adopted Aug. 19, 2026) · Houston Code of Ordinances § 28-231

Corpus is an independent public-information project, not the official City of Houston website. Stable reference: corpuslaw.us/code/df60a251-22c2-4d46-b8bb-410f17b6c5cb

Sec. 28-231. - Enterprise permit applications.

(a) Enterprise permits are categorized as restricted, unrestricted, or registration. A permit may only be issued to the owner of the tract where the enterprise will be located. The owner may designate, in writing and submitted with the application, an individual or company to represent them as applicant. A separate application and permit are required for each tract. (b) An applicant who desires to obtain a permit under this article shall file an application with the department. The application shall be in the form prescribed by the planning official and shall include: (1) The non-refundable fee set forth for this provision in the city fee schedule; (2) Proof of ownership of the tract in the form of a certified copy of a deed, lease, or other evidence of legal title. If the applicant is not the title owner of the tract where the enterprise is located, proof that the applicant is authorized to act for the owner. (3) A survey sealed by a state licensed surveyor, drawn to scale, and showing the exact location (existing or proposed) of any building or structure, or the location on the tract, in which hazardous materials will be manufactured, processed, generated, stored, or used. (4) The specific occupancy divisions within Class H for the enterprise. (5) If the application is for a registration of a nonconforming enterprise, the applicant shall provide evidence to the satisfaction of the planning official that one or more of the following conditions existed on the effective date: a. The tract was in operation or in process of construction for use as an enterprise; b. The tract was served by rail service; or c. The active status of out of doors manufacture, processing, generation, storage, or use of hazardous materials. (6) Any other information reasonably required by the planning official for the purpose of processing and evaluating the application under the requirements of this article.

(Ord. No. 2020-1092, § 2(Exh. A), 12-16-2020)

Ask a question about Houston law

Corpus searches the Houston sections it holds and shows the ones that match, with their citations. Free, no sign-in.