§ 37.08 — EROSION CONTROL PLAN REQUIREMENTS
Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 37.08
Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/df96a906-12bc-452f-8eef-cced9a1b5ea2
37.08 - EROSION CONTROL PLAN REQUIREMENTS.
(1) Control Plan Required. (a) Every applicant for an erosion control permit shall submit a PDF copy of a plan to control erosion, sedimentation and runoff to the Administrative Authority. These plans shall be at a 40:1 or larger scale and include the information described in Sec. 37.08(2). Plans shall be submitted when the proposed activity: (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) 1. Disturbs an area twenty thousand (20,000) square feet or larger; 2. Disturbs an area adjacent to or draining directly into any sensitive area; 3. Regardless of size, proposes to have an onsite pumping system to control groundwater or to dewater the site after rain events; 4. Is considered redevelopment and disturbs an area ten thousand (10,000) square feet or larger; 5. Is considered development and disturbs an area twenty thousand (20,000) square feet or larger; or 6. Any combination of new development and redevelopment with land-disturbing activity in excess of twenty thousand (20,000) square feet. (b) Sites not requiring a control plan as identified above shall submit erosion control proposals using the simplified plan checklist provided with the permit application as described in Sec. 37.08(3). (c) The Administrative Authority may require separate erosion control plans and measures for Planned Development Districts where there is more than one building or multiple development phases. (2) Plan Materials. Erosion control plans required under Sec. 37.08(1) may include consideration of adjoining landowners' cooperative efforts to control transport of sediment and except as specifically exempted below, shall be completed and sealed by a Professional Engineer currently licensed in the State of Wisconsin and shall include the following information: (a) Limits of disturbed area; (b) Limits of impervious area; (c) All erosion control measures to be installed, including a pumping plan as needed; (d) Cross sections of and profiles within road ditches; (e) Kinds of utilities and areas of installation, including special erosion control practices for utility installation; (f) Culvert sizes; (g) Topographical features and the natural direction of flow of runoff; (h) Watershed size for each drainage area; (i) Design discharge for ditches and structural measures; (j) Runoff velocities; (k) Soil loss rate calculations for the construction period per the USLE or another method approved by the Administrative Authority; (l) Fertilizer and seed types, rates and recommendations; (m) Time schedules for stabilization of ditches and slopes; (n) Description of methods by which sites are to be developed; (o) Provision for sequential steps mitigating erosive effect of land-disturbing activities to be followed in appropriate order and in a manner consistent with accepted erosion control methodology suitable to proposed sites and amenable to prompt re-vegetation. Practices shall be installed consistent with Wisconsin Department of Natural Resources' guidance in Stormwater Management Technical Standards as provided on the website as follows: https://dnr.wisconsin.gov/topic/surfacewater; (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) (p) Provisions such as stone access drives to prevent mud-tracking off-site onto public thoroughfares during the construction period and all incidental mud-tracking shall be cleaned up and removed by the end of each working day using proper cleaning and disposal methods; and (q) Any other information necessary to reasonably determine the location, nature and condition of any physical or environmental features of the site. (3) Simplified Plan Checklist. Applicants may submit erosion control proposals using simplified checklists of standard erosion control practices, on a standard form approved by the Administrative Authority, wherever all of the following conditions exist: (a) The site does not exceed twenty thousand (20,000) square feet in area; and (b) The slope of the land does not exceed six percent (6%) throughout the site. Simplified plan checklists shall be reviewed by the Administrative Authority for completeness and accuracy. (4) Erosion Control Performance Standards. Plans will not be approved nor permits issued unless the proposed design, suggested location and phased implementation of effective, practicable erosion control measures for plans are designed, engineered and implemented to achieve the following results: (a) Prevent gully and bank erosion. (b) Limit total off-site permissible annual aggregate soil loss for exposed areas resulting from sheet and rill erosion to an annual, cumulative rate not to exceed five (5.0) tons per acre per year. These rates shall be determined using the U.S. Natural Resources Conservation Service Technical Guide or another commonly accepted soil erosion methodology approved by the City Engineer that considers season of year, site characteristics, soil erodibility and slope. The approved plan shall prevent or reduce all of the following: (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) 1. The deposition of soil from being tracked onto streets by vehicles. 2. The discharge of sediment from disturbed areas into onsite stormwater inlets. 3. The discharge of sediment from disturbed areas into adjacent waters of the state. 4. The discharge of sediment from drainage ways that flow off the site. 5. The discharge of sediment by dewatering activities. 6. The discharge of sediment eroding from soil stockpiles existing for more than 7 days. 7. The transport by runoff of chemicals, cement and other building compounds and materials on the construction site during the construction period. (c) Ensure that by design all necessary phasing is included in the plans such that during construction the erosion control plan in coordination with the stormwater management plan ensures that no increase in rate or volumetric discharge occurs during the construction process. (d) Modifications. Any proposed modifications of approved plans or alterations of accepted sequencing of land-disturbing site activities shall be approved by the Administrative Authority prior to implementation of the modifications. (e) Plan compliance shall be determined using the U.S. Natural Resources Conservation Service Technical Guide or another commonly accepted soil erosion methodology approved by the Administrative Authority, which considers season of year, site characteristics, soil erodability and slope. (f) Implementation. The BMPs used to comply with this section shall be implemented as follows: 1. Erosion and sediment control practices shall be constructed or installed before land-disturbing construction activities begin. 2. Erosion and sediment control practices shall be maintained until final stabilization. 3. Final stabilization activity shall commence when land-disturbing activities cease and final grade has been reached on any portion of the site. 4. Temporary stabilization activity shall commence when land-disturbing construction activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. 5. BMPs that are no longer necessary for erosion and sediment control shall be removed by the Applicant or their designee. (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25) (5) Erosion Control Inspections. (a) Applicability. Applicants who must submit a control plan because the proposed activity meets the criteria of Secs. 37.08(1)(a)4. or 37.08(1)(a)5. shall also be required to conduct erosion control inspections of the site and the erosion control devices/practices at the site as set forth in this subsection. (b) Required Inspections. The applicant shall inspect the erosion control measures on a weekly basis and within twenty-four (24) hours after each half inch (½") rain event. (c) Winter Dormant Inspection Requirements. When a permitted construction site is shut down and dormant over the winter season, the applicant shall be exempt from weekly inspections as required in Sec. 37.08(5)(b) upon approval of the Administrative Authority. In order for a permitted site to be classified as winter dormant, the applicant must install erosion control measures to the satisfaction of the Administrative Authority, provide an inspection of these measures and then cease all construction activities except for minor maintenance activities. Once a site is classified as winter dormant by the Administrative Authority, inspections are only required within twenty-four (24) hours of a rain or thaw event as determined by the Administrative Authority. If at any time construction resumes or an erosion control failure occurs at the site, the site shall lose the winter dormant classification and the applicant must resume normal inspection requirements. The winter dormant classification only applies to inspections required by Sec. 37.08(5)(a) and at no time negates inspection requirements imposed by other permits the applicant may have obtained such as Dane County or WDNR Land Disturbance Permits. (d) Documentation of Inspection. Erosion control inspections, including any repairs needed and/or actions taken at the site, shall be documented on the City of Madison Erosion Control Website. The permittee will be given access to this website, which contains documentations and forms for use in the erosion control inspections. Digital photographs of each of the erosion control practices and the site conditions shall be submitted and shall be required to meet the minimum inspection requirements of this subsection. (e) If the site is noted as being within the Rock River TMDL area, the City of Madison may require additional erosion control measures in addition to those needed to meet the minimum standard of limiting erosion to a rate of five (5) tons per acre per year. The applicant will be made aware of these additional measures either as a condition of permit issuance or as the result of a site inspection performed by the City of Madison. (6) Additional Requirements. In addition to the requirements set forth elsewhere in this Ordinance, applicants for an erosion control permit who must submit a control plan under Sec. 37.08(1)(a) must do the following: (a) Hold a Preconstruction Meeting Prior to the Start of Construction. This preconstruction meeting shall be attended by a Professional Engineer licensed in the State of Wisconsin responsible for the initial implementation of the erosion control plan. The erosion control permitting and reporting requirements shall be discussed at this meeting. The Professional Engineer in attendance shall document the meeting and submit minutes of the meeting to the Administrative Authority within one (1) week of this meeting. The Administrative Authority, at their discretion, may allow other appropriately credentialed professionals to complete this requirement. (b) Initial Installation Certificate. Provide documentation to the Administrative Authority, on forms available from the City Engineer, from a Professional Engineer licensed in the State of Wisconsin showing the initial installation and implementation of the erosion control plan. These forms shall be submitted to the Administrative Authority within one (1) week of the completion of the initial installation and implementation of the erosion control plan. The Administrative Authority, at their discretion, may allow other appropriately credentialed professionals to complete this requirement. (c) Notice of Termination. Within ten (10) working days of completion of the project, or the erosion control portion of the project (meaning the final site stabilization has been completed), notify the Administrative Authority that the Applicant requests closure of the Erosion Control Permit. This request shall be made via the Erosion Control Notice of Termination (ECNOT) form available from the City Engineer. (d) Non-Compliance. Upon written or verbal notice by an agent of the City of Madison to the applicant, or the applicant's designated representative, regarding an erosion control action or repair needed to bring the site into compliance, the applicant has not less than twenty-four (24) nor more than seventy-two (72) hours to bring the project site into compliance and document those subsequent actions with the Administrative Authority. The time allotted to bring the site into compliance shall be noted on the notice and/or issued citation. (Am. by ORD-25-00017, 3-20-25, Eff. 4-1-25)
(Cr. by ORD-20-00051, 6-10-20)
Ask a question about Madison law
Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.