Construction of public improvements.
Round Rock Zoning and Development Code, art. VIII, § 4-96
in effectSec. 4-96. - Construction of public improvements.
(a) Requirement. All public improvements required by these regulations shall be installed and constructed by the developer, or his successors in title, within three years from the issuance of the subdivision improvement permit. All improvements shall conform with the provisions of this chapter and the permitted plans.
(b) Failure to complete improvement. Where public improvements are not completely constructed and accepted within the three years, the city may do the following:
(1) Where an additional fiscal security was required by Section 4-98, obtain the funds under the security to complete the public improvements using a third party selected by the city; and/or
(2) Exercise any other rights available under the law.
(c) Sidewalk construction.
(1) Sidewalks for single-family, two-family, and single-lot townhouse lots. Except as provided in subsection 6-26(c), a developer shall install sidewalks on the rear of double frontage lots, on the side of a corner lot and where shown on the subdivision improvement construction plans.
(2) Sidewalks for common-lot townhouse, multifamily and nonresidential lots. A developer shall install sidewalks for common-lot townhouse, multifamily and nonresidential lots that abut a street and where shown on the subdivision improvement construction plans. A subdivision shall not be accepted until the sidewalk has been constructed in accordance with the regulations of this chapter and has been inspected and approved by the PDS director.
(3) Deferment of sidewalk construction. Sidewalks shall be installed in accordance with subsections (c)(1) and (2) of this section, except under the following circumstances, as determined by the public works director:
a. Where the existing cross section of the street makes immediate construction of a sidewalk impractical;
b. Where a nonresidential subdivision abutting an existing street is isolated from any other sidewalk by a distance of twice the frontage of the subdivision; or
c. Where construction or reconstruction of the street where a sidewalk is to be placed is imminent and the sidewalk would be destroyed if constructed.
d. Where construction of a single-family home within a residential subdivision would potentially damage or destroy a sidewalk immediately adjacent to the lot, the sidewalk shall be constructed prior to issuance of a certificate of occupancy for each individual residence.
The city may require a cash payment by the developer in lieu of construction of the sidewalk if the public works director determines that the sidewalk should not be built within the three-year period of the construction plans. The cash payment shall equal the city's estimate of the cost of constructing and installing the sidewalk and associated features, such as but not limited to appurtenances and drainage features, at the time of permit issuance of the public improvements. The developer shall pay the cash payment prior to the issuance of the public improvements permit.
(4) State review. All sidewalks must comply with the Texas Accessibility Standards administered by the Texas Department of Licensing and Regulation and with the Americans with Disabilities Act of 1990, as amended, whichever is more restrictive. The developer shall submit its sidewalk plans to the Texas Department of Licensing and Regulation for review and upon completion of the construction, for inspection. The city will not accept the public improvements until the developer provides documentation that the sidewalk plans have been reviewed and approved by the Texas Department of Licensing and Regulation. The developer is responsible for all fees associated with the state plan review and inspection and must submit to the city evidence of the payment of all required inspection fees.
(d) Benchmarks.
(1) Designation. A permanent benchmark shall be designated with each addition or subdivision. Benchmarks shall be located on public property in a location acceptable to the PDS director. Benchmarks are considered public improvements and shall consist of a brass disk, furnished by the city, set in a concrete structure of such mass and dimensions and constructed on an unyielding foundation that, in the opinion of the PDS director, will ensure the integrity of the benchmark.
(2) Installation. Prior to acceptance of the public improvements, benchmarks shall be installed by the developer. The elevation, horizontal datum and description of each benchmark installed shall be certified by a surveyor and submitted to the PDS director on a form provided by the city and contained in the development packet. In the event that public improvements are not required, benchmarks shall nevertheless be installed by the developer and the certified elevation and description provided to the PDS director prior to plat recordation.
(3) Modification. The PDS director may modify the benchmark requirement if he/she determines one of the following:
a. The requirement would create needless redundancy of benchmarking because an established public benchmark exists in the immediate vicinity, is readily accessible, and will not be removed or made inaccessible by construction associated with the addition or subdivision;
b. The requirement creates undue hardship on the developer;
c. The city's supply of brass disks is exhausted or there is no feasible opportunity to install a brass disk in a suitable structure. In this case, the PDS director may approve a permanent benchmark established in conformance with generally accepted surveying and engineering practices; or
d. Lack of development within the subdivision or addition.
(Ord. No. O-2024-266, § XXXII, 9-26-2024)