For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.09.170 — Compliance and enforcement

Henderson Municipal Code (Supp. No. 59: codified through Ordinance No. 4163, adopted June 16, 2026) · Henderson Municipal Code § 14.09.170

Corpus is an independent public-information project, not the official City of Henderson website. Stable reference: corpuslaw.us/code/e0c517af-bb7e-44c9-85eb-887b59a94703

14.09.170 - Compliance and enforcement.

A. Enforcement response plan. The city may adopt policies and procedures as set forth in the city's pretreatment enforcement response plan for carrying out the provisions of this chapter, provided that such policies and procedures are not in conflict with this chapter or any applicable state or federal law or regulation. B. Publication of industrial users in significant noncompliance. The city shall publish annually, in a newspaper of general circulation that provides meaningful public notice, a list of the significant industrial users which, at any time during the previous 12 months, were in significant noncompliance with applicable pretreatment standards or pretreatment requirements. In addition, any industrial user found to be in significant noncompliance with subsections 3., 4. or 8. below shall also be published in the newspaper. One or more of the following criteria shall be used to define significant noncompliance: 1. Chronic violations of wastewater discharge limits, defined here as those in which 66 percent or more of all of the measurements taken for the same pollutant parameter during a six-month period exceed (by any magnitude) a numeric pretreatment standard or pretreatment requirement, including instantaneous limits. 2. Technical review criteria (TRC) violations, defined here as those in which 33 percent or more of all of the measurements taken for the same pollutant parameter taken during a six-month period equal or exceed the product of the numeric pretreatment standard or pretreatment requirement including instantaneous limits multiplied by the applicable TRC (TRC = 1.4 for BOD 5 , TSS, FOG, and 1.2 for all other pollutants except pH). 3. Any other violation of a pretreatment standard or pretreatment requirement (daily maximum, long-term average, instantaneous limit, or narrative standard) that the POTW determines has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of POTW personnel or the general public). 4. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare, or the environment or has resulted in the exercise of the city's emergency authority to halt or prevent such a discharge. 5. Failure to meet, within 90 days after the schedule date a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction, or attaining final compliance. 6. Failure to provide, within 30 days after the due date, required reports such as baseline monitoring reports, compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules. 7. Failure to accurately report noncompliance. 8. Any other violation or group of violations, which may include a violation of best management practices, which the POTW determines may adversely affect the operation or implementation of the pretreatment program. C. Administrative enforcement actions. 1. Notice of violation (NOV). Whenever the director finds that an industrial user has violated or continues to violate, any provision of this chapter, an industrial wastewater discharge permit or order issued hereunder, or any other pretreatment standard or pretreatment requirement, the director may serve upon such industrial user a written notice of violation. Within five working days of the receipt of such notice, an explanation of the violation and a plan for satisfactory correction and prevention of further violations shall be submitted to the director. Submission of such a plan in no way relieves the industrial user of liability for any violations occurring before or after receipt of the notice of violation. Nothing in this section shall limit the authority of the city to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation. 2. Administrative order. When the city finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or pretreatment requirement, the city may issue an administrative order to the industrial user responsible for the discharge directing that the industrial user come into compliance within a specific time. If the industrial user does not come into compliance within the time provided, sewer service may be discontinued unless adequate treatment facilities, devices, or other related appurtenances are installed and properly operated. Compliance orders also may contain other requirements to address the noncompliance, including additional self-monitoring and management practices designed to minimize the amount of pollutants discharged to the POTW. An administrative order may not extend the deadline for compliance established for a pretreatment standard or pretreatment requirement, nor does such an order relieve the industrial user of liability for any violation, including any continuing violation. Issuance of an administrative order shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 3. Consent order. The city may enter into a consent order, assurances of voluntary compliance, or other similar documents establishing an agreement with any industrial user responsible for noncompliance. Such documents shall include specific actions to be taken by the industrial user to correct the noncompliance within a time period specified by the document. A consent order may include penalties, supplemental environmental projects, or other conditions and requirements as agreed to by the city and the industrial user. A consent order shall have the same force and effect as an administrative order and shall be judicially enforceable. 4. Show cause hearing. a. The director may order an industrial user which has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit or order issued hereunder, or any other pretreatment standard or pretreatment requirement, to appear before the director and show cause why the proposed enforcement action should not be taken. Notice shall be served on the user specifying the time and place for the meeting, the proposed enforcement action, the reasons for such action, and a request that the user show cause why the proposed enforcement action should not be taken. The notice of the meeting shall be served personally or by registered or certified mail (return receipt requested) at least ten days prior to the hearing. Such notice may be served on any authorized representative of the industrial user. A show cause hearing shall not be a bar against, or prerequisite for, taking any other action against the industrial user. b. After the director has reviewed the evidence, the director may issue an order to the industrial user responsible for the discharge directing that, following a specified time period, the sewer service be discontinued unless adequate treatment facilities, devices or other related appurtenances have been installed or existing treatment facilities, devices or other related appurtenances are properly operated. Further orders and directives as are necessary and appropriate to correct the violation may be issued. 5. Cease and desist order. a. When the director finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit or order issued hereunder, or any other pretreatment standard or pretreatment requirement, or that the industrial user's past violations are likely to recur, the director may issue a cease and desist order to the industrial user directing it to cease and desist all such violations and directing the industrial user to: (1) Immediately comply with all requirements; and (2) Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and/or terminating the discharge. b. Issuance of a cease and desist order shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 6. Administrative fines. a. When the director finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit or order issued hereunder, or any other pretreatment standard or pretreatment requirement, the director may fine such industrial user in an amount not to exceed $1,200.00. Such fines shall be assessed on a per-violation, per-day basis. b. Issuance of an administrative fine shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 7. Suspension of service. a. Endangerment to health or welfare of the community. Whenever it reasonably appears that such discharge presents an imminent endangerment to the health or welfare of the community, the city may (with or without prior notice) immediately and effectively halt or prevent any discharge of pollutants into any natural waterway, surface drainage within the city, any area under jurisdiction of the city, the POTW of the city or any wastewater system tributary thereto, by any means available to them, including physical disconnection from the POTW. b. Endangerment to environment or treatment works. The city, after written notice to the industrial user may halt or prevent any discharge of pollutants into any natural waterway, surface drainage within the city, any area under jurisdiction of the city, the POTW, wastewater system tributary thereto, by any means available to them, including physical disconnection from the POTW, whenever such discharge presents or may present an endangerment to the environment or threatens to interfere with the operation of the POTW. c. Any person notified of a suspension of wastewater service and/or the industrial wastewater discharge permit shall immediately stop or eliminate the contribution. In the event of a failure of the person to comply voluntarily with the suspension order, the city shall take such steps as deemed necessary including immediate severance of the sewer connection, to prevent or minimize damage to the POTW or endangerment to individuals or the environment. The city may reinstate the industrial wastewater discharge permit and/or the wastewater service upon proof of the elimination of the non-complying discharge. d. A detailed written statement submitted by the industrial user describing the causes of the harmful contribution and the measures taken to prevent any future occurrence shall be provided to the city within five days of the date of occurrence. Suspension of service shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 8. Revocation of industrial wastewater discharge permit. Pursuant to section 14.09.090, a violation of the conditions of an industrial wastewater discharge permit or of this chapter or of applicable state or federal regulations shall be reason for revocation of such permit by the city. Upon revocation of the permit, any wastewater discharge from the affected industrial user shall be considered prohibited and discharge of such wastewater in violation of this chapter. 9. Continuous violations. With respect to violations of this chapter that are continuous with respect to time, each day that the violation continues is a separate violation. With respect to violations of this chapter that are not continuous with respect to time, each prohibited act and/or each failure to perform a required act is a separate violation. 10. Administrative enforcement: request for reconsideration; appeals. a. Any industrial users directly aggrieved by an administrative enforcement action taken by the city under chapter 14.09 may file a request for reconsideration. All requests for reconsideration (1) shall be made by the aggrieved party submitting a written request for reconsideration to the director that identifies the action taken or decision made by the city that the aggrieved party wants to be reconsidered, sets forth in detail the facts supporting the request for reconsideration, and identifies any relief requested; (2) shall be served personally or by registered or certified mail, return receipt requested, on the director; and (3) must be received by the director on or before the tenth day after the city takes the action or makes the decision that the aggrieved party wants to be reconsidered. b. Within ten days after the director receives a request for reconsideration in accordance with subsection 14.09.170.C.9.a, the director may modify the action taken. Any such modification must be in writing, be made within 20 days of the director's receipt of that request for reconsideration, and served on the aggrieved party that made the request personally or by registered or certified mail, return receipt requested. c. If a decision made by the director in accordance with subsection 14.09.170.C.9.b is unsatisfactory to the aggrieved party requesting reconsideration, the aggrieved party may, within ten days after receiving the director's decision, file a written appeal to the city manager with the city clerk. The written appeal shall be decided by the city manager within 30 days from the date of filing, and the city manager's decision shall be deemed to be the final administrative action on such appeal. The director's decision shall remain in effect during such period of appeal. D. Public nuisance. Any condition caused by a user or permitted by a user to exist in violation of any provision of this chapter is a threat to public health, safety, and welfare, and is declared and deemed a nuisance per se. E. Judicial enforcement remedies. 1. Injunctive relief. When the city finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or pretreatment requirement, the city may petition a court of competent jurisdiction for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the industrial wastewater discharge permit, order, or other requirement imposed by this chapter on activities of an industrial user. The city may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the industrial user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against an industrial user. 2. Civil penalties. a. An industrial user who has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or pretreatment requirement shall be liable to the city for a civil penalty no less than $1,000.00 and not to exceed $10,000.00 per day per violation. With respect to violations that are continuous with respect to time, each day that the violation continues is a separate offense. b. Filing a lawsuit for civil penalties shall not be a bar against, or a prerequisite for, taking any other action against an industrial user. 3. Civil/administrative fine pass through. In the event that an industrial user discharges such pollutants which cause the city to violate any condition of its NPDES permit and the city is fined by the EPA or the state of Nevada for such violation, then such industrial user shall be fully liable for the total amount of the fine assessed against the city by the EPA and/or the state of Nevada. 4. Criminal penalties. a. An industrial user that willfully, knowingly, or negligently violates a provision of this chapter, a provision of any order issued hereunder, a provision of an industrial wastewater discharge permit issued hereunder, a pretreatment standard, or a pretreatment requirement is guilty of a misdemeanor and, upon conviction thereof, shall punishable by a fine not to exceed $1,000.00 per day for each violation and/or by imprisonment in the Henderson Detention Center for not more than six months. In lieu of all or part of the foregoing punishment which may be imposed, the convicted person may be sentenced to perform a fixed period of community service pursuant to the conditions prescribed in NRS 176.087 and, as applicable, to pay restitution in accordance with NRS 176.033. If a corporation is convicted of a violation, the corporation is punishable by a fine not exceeding $1,000.00 and, as applicable, shall pay restitution in accordance with NRS 176.033, unless otherwise provided by law or the code. With respect to violations that are continuous with respect to time, each day that the violation continues is a separate offense. With respect to violations that are not continuous with respect to time, each prohibited act and/or each failure to perform a required act is a separate offense. b. The city may refer violations that may warrant criminal prosecution to the U.S. Attorney General's Office, State Attorney General, EPA Criminal Investigation Division or other appropriate agency. This referral shall not preclude the city from taking a parallel administrative or civil enforcement action.

(Ord. No. 3496, § 1, 7-10-2018)

Ask a question about Henderson law

Corpus searches the Henderson sections it holds and shows the ones that match, with their citations. Free, no sign-in.